Final Inspection - Erosion Control Sample Clauses

Final Inspection - Erosion Control. (a) Within ten (10) days after installation of all practices in an approved erosion control plan and achievement of soil stabilization, the permittee shall notify the Village Administrative Authority;
AutoNDA by SimpleDocs

Related to Final Inspection - Erosion Control

  • Final Inspection Contractor shall complete the list of items identified on the pre-final Punchlist prior to requesting a final inspection. Unless otherwise specified, or otherwise agreed in writing by the parties as documented on the Certificate of Substantial Completion, Contractor shall complete and/or correct all Work within thirty (30) days of the Substantial Completion date. Upon completion of the pre-final Punchlist work, Contractor shall give written notice to ODR and A/E that the Work will be ready for final inspection on a specific date. Contractor shall accompany this notice with a copy of the updated pre-final Punchlist indicating resolution of all items. On the date specified or as soon thereafter as is practicable, ODR, A/E and Contractor will inspect the Work. A/E will submit to Contractor a final Punchlist of open items that the inspection team requires corrected or completed before final acceptance of the Work.

  • Safety Inspection During inspection of County facilities conducted by the State Division of Occupational Safety and Health for the purpose of determining compliance with the California OSHA requirements, an OCEA designated employee shall be allowed to accompany the inspector while the inspector is in the employee's agency/department. The employee so designated shall suffer no loss of pay when this function is performed during the employee's regularly scheduled work hours.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • INSPECTION/TESTING All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.

  • INSPECTION CONTINGENCY The obligations of the Buyer as set forth in this Agreement are contingent upon Buyer’s inspection of the Property. The Buyer shall have the right to conduct an inspection of the Property within days of the Effective Date. The choice and appointment of the inspector shall be the sole discretion of the Buyer who shall also solely bear the costs of the same. The time and date of the inspection shall be at the option of the Buyer but must be at a reasonable time and notice. In the event that upon completion of the inspection, the Buyer is not satisfied with the state of the Property, the Buyer shall notify the Seller of the unsatisfactory conditions and request the Seller to remedy the same. The Seller shall have days after receiving such notice to remedy the same. In the event that the Seller refuses to allow access to the Property to accommodate the inspection or fails to remedy the unsatisfactory conditions stated in the notice, the Buyer may, in the Buyer’s sole discretion, accept the Property as it is and proceed with the purchase under this Agreement, or terminate this Agreement and recover the Xxxxxxx Money, costs incurred in relation to this Agreement and .

  • SITE INSPECTION Where a site inspection is required by the Bid Specifications or Project Definition, Bidder shall be required to inspect the site, including environmental or other conditions for pre-existing deficiencies that may affect the installed Product, equipment, or environment or services to be provided and, which may affect Bidder’s ability to properly deliver, install or otherwise provide the required Product. All inquiries regarding such conditions shall be made in writing. Bidder shall be deemed to have knowledge of any deficiencies or conditions which such inspection or inquiry might have disclosed. Bidder must provide a detailed explanation with its Bid if additional work is required under this clause in order to properly complete the delivery and installation of the required Product or provide the requested service.

  • MOVE-IN INSPECTION Before, at the time of the Tenant accepting possession, or shortly thereafter, the Landlord and Tenant: (check one) ☐ - Agree to inspect the Premises and write any present damages or needed repairs on a move-in checklist. ☐ - Shall not inspect the Premises or complete a move-in checklist.

  • Environmental Review (a) Buyer shall have the right to conduct or cause a consultant (“Buyer’s Environmental Consultant”) to conduct an environmental review of the Assets and Seller’s records pertaining to the Assets (as set forth in Section 3.01) prior to the expiration of the Examination Period (“Buyer’s Environmental Review”). The cost and expense of Buyer’s Environmental Review, if any, shall be borne solely by Buyer. The scope of work comprising Buyer’s Environmental Review shall not include any intrusive test or procedure without the prior written consent of Seller. Buyer shall (and shall cause Buyer’s Environmental Consultant to): (i) consult with Seller before conducting any work comprising Buyer’s Environmental Review, (ii) perform all such work in a safe and workmanlike manner and so as to not unreasonably interfere with Seller’s operations and (iii) comply with all applicable laws, rules, and regulations. Seller shall use commercially reasonable efforts to obtain any Third Party consents and otherwise cooperate with Buyer in conducting Buyer’s Environmental Review and any activities related thereto. Seller shall have the right to have a representative or representatives accompany Buyer and Buyer’s Environmental Consultant at all times during Buyer’s Environmental Review. With respect to any samples taken in connection with Buyer’s Environmental Review, Buyer shall take split samples, providing one of each such sample, properly labeled and identified, to Seller. The Parties shall execute a “common undertaking” letter regarding the confidentiality for the Environmental Review where appropriate. Buyer hereby agrees to release, defend, indemnify and hold harmless Seller from and against all claims, losses, damages, costs, expenses, causes of action and judgments of any kind or character (INCLUDING THOSE RESULTING FROM SELLER’S SOLE, JOINT, COMPARATIVE OR CONCURRENT NEGLIGENCE OR STRICT LIABILITY) to the extent arising out of Buyer’s Environmental Review. Buyer hereby covenants and agrees that it will have at least $2,000,000 of general liability insurance to cover its indemnification hereunder prior to the commencement of the Environmental Review.

  • Independent Review and Inspection The Owner may undertake independent inspection of the installation of the Work. Such independent inspector shall operate on behalf of the Owner and shall act to protect the best interests of the Owner.

  • Move-in; Inspection; Delay Before Resident may access or occupy the premises, any required installments or other payments then due (including any Administrative Fee, which is earned and payable upon mutual execution of this Agreement) must be paid in full with cleared funds and guaranty or prepayment requirements satisfied. The application fee (if any) is non-refundable and is not applicable toward any other payments required of Resident under this Agreement. Prior to Resident’s taking possession of the assigned bedroom space (and any re-assigned bedroom space), Resident will conduct an inspection of the assigned bedroom space and apartment and will note on the Check-In/Check-Out Inspection Report (“Inspection Report”) any defects, damage or other conditions observed, if not already identified by Owner on such report; upon completion and approval by Owner, the Inspection Report will become part of this Agreement. At the time of move-out, Resident is encouraged to inspect the bedroom space and apartment with Owner’s representative by making an appointment during business hours at least 48 hours in advance. Within three business days following Resident’s move-out (or, as applicable, following the move-out of all residents of an apartment) at the termination of this Agreement, or within a reasonable time if Resident moves out without notifying Owner, Owner will note the then-present condition of the assigned bedroom space and apartment, including all appliances and fixtures, and any damages incurred and/or extraordinary cleaning deemed necessary by Owner or extraordinary wear as determined by Owner. Resident will promptly pay all costs of restoring the bedroom space and apartment to the same condition upon move-in, less normal wear. Resident acknowledges that except as provided in the Inspection Report, each bedroom space and apartment are being delivered in "as-is" condition, and Resident’s acceptance of the assigned bedroom space and apartment at the beginning of the Term constitutes Resident’s acknowledgment that the bedroom space and apartment and all fixtures are in good repair and condition. Owner will not be responsible for any damages or consequences suffered by Resident as a result of Owner’s inability to timely deliver possession of the apartment or assigned bedroom space to Resident on the anticipated Start Date; in such event, the rent payable will be abated until Owner tenders possession and such delay will not extend or decrease the term or change the End Date. Resident acknowledges that any model apartment at the Property shown to Resident in person, online or through other means is intended to be representative of the general quality and type of construction and materials within apartments. Specific items of décor and furnishings and the actual colors, styles, materials, upholstery and other treatments in the apartment assigned to Resident may vary from those in the model apartment. The actual apartment assigned to Resident may also vary in approximate size, square footage and layout. Resident’s apartment will not include custom lighting, lamps, decorations, linens, unattached appliances or other personal property as may be shown in the model apartment.

Time is Money Join Law Insider Premium to draft better contracts faster.