Final Design Plans Sample Clauses

Final Design Plans. The final design plans will depict the entire Project location. The eligible/participating bid items must be shown separated and listed apart from the non-eligible/non- participating bid items on the final design plans, bid documents, and on the detailed billing provided by the City. The City shall have the final design plans signed and sealed by a licensed professional engineer. The City will furnish to KDOT’s Bureau of Local Projects an electronic set of final design plans and specifications. The City further agrees the specifications will require the contractor to provide a performance bond in a sum not less than the amount of the contract as awarded.
AutoNDA by SimpleDocs
Final Design Plans. 1. Generate final project drawings and specifications.
Final Design Plans. Xxxxxx-Xxxx will address up to four (4) additional rounds of TDOT review comments. Plan edits will consist of: • Horizontal design curve data on all layout sheets • Vertical design profile sheets to consist of both existing and proposed profiles for the greenway alignment as well as vertical curve data • Typical cross sections sheets that consist of preliminary pavement schedules • Pavement marking plan sheetsTraffic control plan sheets • Retaining wall envelopes to be added to existing plan sheets • Up to three (3) additional rounds of TDOT comments per the revised plan review schedule Task 15Structural Design for Pedestrian Bridges Based on the completed geotechnical report, Xxxxxx-Xxxx will revise the pedestrian bridge design to abutment wall substructures on spread footings. Due to the varying rock elevations and bridge grades, four separate design cases will be evaluated. Consultant and Client agree to the following general schedule in connection with the services set forth above: We will provide our services as expeditiously as practical. For the services set forth above, Client shall pay Consultant the following compensation: Xxxxxx-Xxxx will perform the services described in Tasks12 through 15 for the total lump sum fee below. Individual task amounts are for informational only. All permitting, application, and similar project fees will be paid directly by the Client. Task 12 – Excess Land Exhibit $1,500 Xxxx 00 – Extended Utility Coordination $9,600 Xxxx 00 – Final Design Plans $15,700 Xxxx 00 – Structural Design for Pedestrian Bridges $12,300 Total Lump Sum Fee: $39,100 Individual task amounts are provided for budgeting purposes only. Xxxxxx-Xxxx reserves the right to reallocate amounts among tasks as necessary (as allowed by the TDOT Local Government Guidelines for the Management of Federal and State Funded Transportation Projects). Fees and expenses will be invoiced monthly based, as applicable, upon the percentage of services performed or actual services performed and expenses incurred as of the invoice date. Payment will be due within 25 days of your receipt of the invoice. CLIENT: CONSULTANT: Town of Xxxxxxxx’x Station XXXXXX-XXXX AND ASSOCIATES, INC. By: By: Xxxxxxx X. Xxxxxx, P.E. Title: Title: Vice President
Final Design Plans. A. Within ninety (90) days from the Effective Date and prior to submitting for building permit approval by City, Developer shall submit to MRA a design package for the Project to include a site plan inclusive of a landscape plan and full color elevations (“Preliminary Design Plans”). Preliminary Design Plan shall be fully detailed with site dimensions, landscaping plants and materials, traffic and pedestrian circulation, and façade materials and colors.
Final Design Plans. Upon approval of the categorical exclusion document, we will begin detailed design development. Upon completion and acceptance by the Client of the existing preliminary plans, Xxxxxx-Xxxx will then begin preparing a set of final construction documents suitable for bidding for the Xxxxxxxx’x Station Greenway Phase 3. We anticipate this set of drawings to be prepared in 24” x 36” format and will consist of the following:  Title Sheet – This sheet will contain relevant project / contact information required by the Town of Xxxxxxxx’x Station and TDOT.  General Notes – This sheet will contain standard TDOT general notes and special notes related to contractor responsibilities, coordination requirements, and traffic management parameters during construction.  Existing Conditions / Demolition Plans – Xxxxxx-Xxxx will prepare Existing Conditions / Demolition Plan sheets based on the final approved routing of the greenway.
Final Design Plans. Xxxxxx-Xxxx will prepare final construction plans for the project. The plans are anticipated to consist of the following sheets: ⚫ Title Sheet ⚫ Index and Standard Drawings ⚫ Estimated Roadway Quantities ⚫ Roadway Typical SectionsGeneral NotesSpecial NotesDetail SheetsProperty Map and Right-of-Way Acquisition Table ⚫ Present & Right-of-Way Layout ⚫ Proposed Layout ⚫ Mainline/Sideroad Profiles ⚫ Drainage Map ⚫ Erosion Prevention and Sediment Control Plans ⚫ Traffic Control Plans ⚫ Signing and Marking ⚫ Traffic Signal Modification ⚫ Roadway Cross Sections
Final Design Plans. The Final Review is a review of the 95% construction plans, specifications and cost estimates for completeness and accuracy. Contractor will deliver Project Technical Specifications and Special Provisions and the final Engineer’s Opinion of Cost estimate in hard copy and in electronic spreadsheet files. Contractor will prepare 100% construction documents, including Design Plans, tabulation sheets of all construction quantities and traffic control devices for the Project, details, technical specifications and Special Provisions, and cost estimates, including EDA requirements, for a final review. Project Maintenance Plan Contractor shall provide a Project maintenance plan that includes schedules for observations, inspections and suggested maintenance of the improvements. Contractor shall also provide an operations and maintenance manual for the final installed systems. Project Construction Report Contractor shall provide a bound and PDF version of the final construction administration manual including all daily inspection reports; materials testing reports; selection of appropriate pictures; correspondence between the Town, Contractor, and, when applicable, the Construction Contractor; change orders and log; payment requests and approvals; field orders and logs of other documents, such as submittals, shop drawings and requests for information.
AutoNDA by SimpleDocs

Related to Final Design Plans

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Final Design A.4.1. Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Improvement Plans a. An improvement plan is a clearly articulated assistance program for a teacher/counselor/SLP whose overall summative rating is ineffective.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • Final Plans On or before thirty (30) days following the date of full execution of this Lease, Landlord shall submit to Tenant two (2) sets of Landlord’s proposed space and construction plans and specifications prepared by Landlord’s architect, for the Tenant Improvements, Within three (3) business days after receipt of Landlord’s plans and specifications Tenant shall either: (a) evidence its approval by endorsement on one (1) set of said plans and specifications (and return such signed or initialed set to Landlord); or (b) indicate those revisions or corrections which Tenant requires and the reasons therefor; provided Landlord shall not be obligated to accept any revisions which Landlord shall reasonably determine: (i) do not conform to the standards of design, motif and decor reasonably established or adopted by Landlord for the Building; (ii) would subject Landlord or the Premises to any additional cost, expense, liability, violation, fine, penalty, or forfeiture; would adversely affect the reputation, character, or nature of the Building; (iii) would provide for or require any installation of work which is or might be unlawful, create an unsound or dangerous condition, adversely affect the structural soundness of the Premises or Building; (iv) interfere with or abridge the use and enjoyment of any adjoining or other space in the Building, or (v) is of a special use or nature with little or no residual value (unless Tenant agrees to pay for such improvements and the removal thereof upon the expiration or earlier termination of this Lease). Landlord shall, within five (5) days thereafter, submit four (4) sets of proposed plans and specifications, as so revised or corrected, to Tenant for its approval in accordance with this paragraph, which plans will then be considered the final plans (the “Final Plans”). The Final Plans may subsequently be amended by Tenant provided that significant changes will require Landlord’s prior written approval, which approval shall be given or reasonably refused within five (5) business days after receipt of such amended plans and specifications and, provided further that if such change order will delay the anticipated Commencement Date specified in Section 1 of the Lease the change order shall be considered a Tenant Delay (as hereinafter defined). The parties will work cooperatively to complete the plan approval process expeditiously.

  • Release of Design Plan The Engineer (1) will not release any roadway design plan created or collected under this contract except to its subproviders as necessary to complete the contract; (2) shall include a provision in all subcontracts which acknowledges the State’s ownership of the design plan and prohibits its use for any use other than the project identified in this contract; and (3) is responsible for any improper use of the design plan by its employees, officers, or subproviders, including costs, damages, or other liability resulting from improper use. Neither the Engineer nor any subprovider may charge a fee for the portion of the design plan created by the State.

  • Lesson Plans Each teacher shall develop lesson plans for the instruction of students enrolled in his/her classroom. The primary purpose of lesson plans is to assist the classroom teacher with instruction. It also provides the basis to ensure that the state/county curriculum is being presented.

Time is Money Join Law Insider Premium to draft better contracts faster.