Final Clean-up Sample Clauses

Final Clean-up. Costs of final clean-up of the Project.
AutoNDA by SimpleDocs
Final Clean-up. At the conclusion of the construction work, the contractor shall restore all streets, ditches, drainage ways, including fine grading and seeding; ensure positive drainage with no standing water; clean the entire site of all construction debris; and remove all temporary fencing facilities, equipment and unused materials. The GFHOA will give approval as to whether the final clean up has been completed to its satisfaction.
Final Clean-up. Upon completion of the Work and before acceptance and final payment, Contractor shall remove from the street and adjacent property, all surplus and discarded materials, equipment, rubbish and temporary structures; restore in an acceptable manner all property, both public and private, which has been damaged during the prosecution of the Work; and shall leave the site in a neat and presentable condition subject to the approval of the Engineer.
Final Clean-up. Upon the conclusion of the construction work, the Contractor shall restore all pavements, roadways, verges, ditches and drainage channels, to their original condition, including fine grading and seeding, assure positive drainage with no standing water, clean the entire Site of all construction debris and refuse, and remove all temporary fencing facilities, equipment and unused materials. Where necessary, verges are to be levelled to their original condition, grass sods laid and any trees destroyed replaced, in liaison with the Landscape Consultant. The Estate Manager will, on completion of the Building Contract, as part of the approval of the as-built plans by the Association, carry out an inspection of the works inclusive of the verges and services.
Final Clean-up. A. Before acceptance of the work, the Contractor shall remove from the site all machinery, equipment, surplus materials, rubbish, temporary buildings, barricades and signs.
Final Clean-up. 3.14.1 At the conclusion of the construction work, the contractor shall restore all streets, ditches, drainage ways, including fine grading and seeding; ensure positive drainage with no standing water; clean the entire site of all construction debris; and remove all temporary fencing facilities, equipment and unused materials.
AutoNDA by SimpleDocs
Final Clean-up. At the conclusion of the construction work, the contractor shall restore all pavements, roadways, verges, foliage, ditches and drainage channels to their original condition, including fine grading and seeding, positive drainage with no standing water, cleaning of the entire site of all construction debris and refuse and the removal of all temporary fencing facilities, equipment and unused materials. Where necessary verges and pavements and to be levelled and restored to their original condition, ‘grass sods’ laid and any trees destroyed replaced, in liaison with the Estate Landscaping Consultant. The Estate Manager, or Building Control Manager will, on completion of the contract, as part of the approval of the As-built drawings by XXXXXX, carry out an inspection of the site, inclusive of the verges and services, with the Principal Agent and building contractor.
Final Clean-up. At the conclusion of the construction work, the Contractor shall restore all pavements, roadways, verges, ditches and drainage channels, to their original condition, including fine grading and seeding, assure positive drainage with no standing water, clean the entire site of all construction debris and refuse, and remove all temporary fencing facilities, equipment and unused materials. Where necessary, verges are to be levelled to their original condition, grass sods laid and any trees destroyed replaced, in liaison with the Estate Landscaping Consultant. The Estate Manager or Environmental Officer will, on completion of the contract, as part of the approval of the as-built garden by XXXXXX, carry out an inspection of the work.
Final Clean-up. 1 Upon completion do a final clean-up to the satisfaction of the Departmental Representative. .2 Clean all new surfaces, lights, existing surfaces affected by this work, replace filters, etc. .3 Clean all resilient flooring and prepare to receive protective finish. Protective finish applied by NRC