Field Surveys Sample Clauses

Field Surveys. Provide engineering and technical personnel and equipment to obtain survey data as required for the engineering design. Utility companies shall be requested to flag or otherwise locate their facilities within the PROJECT limits prior to the ENGINEER conduct- ing the field survey for the PROJECT. Utility information shall be clearly noted and identified on the plans.
AutoNDA by SimpleDocs
Field Surveys. XXX will recover monuments marking the existing ROW lines (if any) and the front corners of the properties from which ROW is to be obtained and will tie to the project control. XXX will recover the corner or angle point monuments nearest to the proposed ROW on the side line of each of the subject properties and these corners will be tied to the project control after XXX has been granted. Boundary Analysis Utilizing the deed study and the data from the field survey, XXX will analyze the results of the survey and perform computations related to the analysis. Location of the existing ROW lines and the side property lines of each of the subject properties will be determined by XXX. Preparation of Documents Documents will be submitted in two rounds (preliminary and final). Preliminary ROW documents shall be submitted based upon found monumentation within the existing ROW. Final ROW documents shall be submitted at a later date once XXX has been granted and the property boundaries finalized.
Field Surveys. The Contractor shall conduct field surveys and document findings of systems and components to verify configuration and component information.
Field Surveys. 4.5.1 Isolation of X. fastidiosa from symptomatic olive trees
Field Surveys. Garver will perform the following Tasks as applicable:
Field Surveys. Field inventories of the City’s business and industrial areas are conducted every 12 – 18 months to identify businesses located within the City that appear to be under-reporting revenues or are not on the CDTFA allocation rolls. Specially trained field auditors, using the latest in mapping, GPS an digital recording technology, document not only the existence of sales tax producing businesses but also any relevant factors such as size, presence of a large stock of goods, will- call windows and any specific references to sales activity.
Field Surveys. The ENGINEER shall perform a topographic and location survey of approximately 57,300 square feet that includes the 801 Building, sections of Ocean Drive and the public beach access at the intersection of Ocean Drive and Xxxxxx Road. This survey area is highlighted in Figure 2. The OWNER shall furnish to the ENGINEER any available topographic and storm water infrastructure inventory data and Record Drawing data relative to the project to be used only as a verification tool. Horizontal surveys shall be tied to the North Carolina State Plane Coordinate System (North American Datum 1983) and vertical surveys shall be based on the North American Vertical Datum of 1988. The survey shall comply to meet the requirements for a planimetric survey to the accuracy of Class AA and vertical accuracy to the Class C standard as detailed in the Standards of Practice for Land Surveying in North Carolina, Amended August 1, 2014 and shall include:
AutoNDA by SimpleDocs
Field Surveys. Provide engineering and technical personnel and equipment to obtain survey data as required for the engineering design.
Field Surveys. The CONSULTANT shall perform a survey within the street right of way that includes Xxxx Xxxxxx xxxx Xxxxx Xxxxxx Xxxxxx to Xxxxxx Xxxxxx Xxxx Drive between Courthouse Drive and South Poplar Street and South Cypress Street at the intersection of E King Street. The OWNER shall furnish to the CONSULTANT any available topographic and storm water infrastructure inventory data relative to the Project to be used only as a verification tool. Horizontal surveys shall be tied to the North Carolina State Plane Coordinate System (North American Datum 1983) and vertical surveys shall be based on the National American Vertical Datum of 1988. The survey shall be completed by the standards as set forth by the Rules of Standard Practice as outlined by the North Carolina Board of Engineers and Land Surveyors and North Carolina General Statutes to include GS 47‐30 and North Carolina Administrative Code – 21 NCAC 56.1606.
Field Surveys. We have included Lim and Associates, our W/MBE partner, as a knowledgeable resource for topographic surveying in and around the City of Arlington. Topographic survey will be conducted using actual field shots based on the latest GPS monuments located on PWTs web page. We understand that the City will provide the Team with right of entry for surveying once we identify those properties that need surveying. This scope includes survey for the following areas: • Mondavi Estates detention pond and outfall structure • Street cross sections and curb inlets (verify pipe sizes and flow lines) • Twin Hills detention pond and outfall structure • Finished floor elevations (FFEs) included for 8 locations • Existing pond area, embankment, and existing insurable structures at 0000 Xxxxxxxx Xxxx A map of approximate survey locations is included as an attachment to this proposal.
Time is Money Join Law Insider Premium to draft better contracts faster.