Facility Requirements. (Capabilities & Requirements for Design and Manufacturing) Area Requirements: Manufacturing • Square footage to support rate production Facility • Indoor assembly area • Separate fabrication / welding and assembly areas • 30T overhead crane with 20’ lift • 15T forklift • 3 phase 480V 60 Hz / 3 phase 400V 50 Hz for skid testing • Natural gas available (low priority) • Coil steel handling capability • CNC shear / punch / brake • Laser / plasma/water jet cutter • Automated welding (orbital welder for pipe, robot for sheet / plate) • CNC drilling (15-20’ horizontal bed for skid base drilling) • Rolls (tank sides / large diameter pipe) • Hydro / pneumatic testing (pipes / vessels) • Machine shop capabilities • Sand Blast / paint (liquid or powder coat) • Inspection tooling • I/C tools (4-20 loop calibrators, TC readouts, pressure calibrators) • Electrical tools (megger, hi-pot set) • Electrical Panel Shop • Adequate storage facility for completed BOPs. Capabilities • Certified welders (SMAW/GMAW) for structural and piping Required for • Mechanics / Pipe fitters / Assemblers BOP • Machinists / Toolmakers Fabrication * • Sheet metal fabricators • Wiremen / panel builders / electricians • Instrument technicians (capable of performing full BOP testing) • Insulators / Estimators • Independent Quality Assurance department • Purchasing • Shipping and Receiving • Painters • Manufacturing / Project engineers • Welding engineers (AWS familiarity) • Required within POSCO Power’s facility or through local contract vendors
Appears in 3 contracts
Samples: License and Distribution Agreement (Fuelcell Energy Inc), License and Distribution Agreement (Fuelcell Energy Inc), License and Distribution Agreement (Fuelcell Energy Inc)
Facility Requirements. (Capabilities & Requirements cont.) Material • Metals experience (welding / fabrication): carbon steel, stainless steel, aluminum Processing • Copper brazing experience (tubing) • Wood crate fabrication for Design export shipping • Shipping shrink wrap experience • Close proximity to xxxxx / steel distributors • Close proximity to galvanizing facilities • Segregated carbon steel and Manufacturing) Area Requirements: Manufacturing • Square footage to support rate production Facility • Indoor assembly area • Separate fabrication / welding and assembly stainless steel work areas • 30T overhead crane with 20’ lift Willingness to handle (load) sorbent and catalyst media into vessels • 15T forklift • 3 phase 480V 60 Hz / 3 phase 400V 50 Hz for skid testing • Natural gas available Insulation and jacketing experience (low prioritymineral wool, ceramic fiber, micro-porous silica) • Coil steel handling capability • CNC shear / punch / brake • Laser / plasma/water jet cutter • Automated welding Decal (orbital welder for pipe, robot for sheet / plateplant logos) application experience (or ability to source locally) • CNC drilling Painting (15-20’ horizontal bed for skid base drillingcarboline or equivalent) Quality System • ISO 17025 Certified (covers test equipment calibration) • Rolls Document Control • Incoming Material Inspection • Welder Certifications • Non-conforming Material Handling Procedures • Corrective & Preventive Action Procedures • Supplier Qualification Procedures • Manufacturing Procedures • Quality Audit Process Engineering / • Mechanical Engineers (tank sides ASME / large diameter pipeDIN familiarity) Design • Electrical Engineers (NEC familiarity, & utility interconnect knowledge) • Hydro / pneumatic testing Structural Engineers (pipes / vessels) • Machine shop capabilities • Sand Blast / paint (liquid or powder coat) • Inspection tooling • I/C tools (4-20 loop calibrators, TC readouts, pressure calibrators) • Electrical tools (megger, hi-pot set) • Electrical Panel Shop • Adequate storage facility for completed BOPs. Capabilities • Certified welders (SMAW/GMAW) for structural and piping Required for • Mechanics / Pipe fitters / Assemblers BOP • Machinists / Toolmakers Fabrication * • Sheet metal fabricators • Wiremen / panel builders / electricians • Instrument technicians (capable of performing full BOP testing) • Insulators / Estimators • Independent Quality Assurance department • Purchasing • Shipping and Receiving • Painters • Manufacturing / Project engineers • Welding engineers (AWS AISC familiarity) • Piping Engineers (ASME familiarity) • Chemical Engineer • Instrument / Controls Engineer • CAD Modeling / Drafting (mechanical / electrical Autocad, Integraph PDS and Smart Plant Review) • Understanding of CSA FC-1 fuel cell safety standard and IEC 00000-0-0 fuel cell safety standard (in draft) • Knowledge of ASME “U”, “PP” (code vessels, code piping) Required within POSCO Power’s facility or through local contract vendors• ANSI / CSA America FC1 — Standard for Fuel Cell Power Plants Certifications • UL 1741 — 2007 — Standard for Power Conversion Systems (Powerplant) • California Rule 21 — Utility Interconnection Standard for California • CARB 07 — Standard for Distributed Generation Unit Emissions (CCR 94200-94214) for Operation on Natural Gas in the State of California Applicable Codes and Standards • IEEE 1574-2003 — Standard for Interconecting Distributed Resources with Electric Power Systems • IEEE 1547.1 — 2005 — Standard for Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems. • NFPA 70 — 2005 — National Electric Code • NFPA 853 — 2003 — Standard for Installation of Fuel Cell Power Plants • ASME piping and vessel codes, as applicable per process conditions • OSHA General Industry Standards — 29 CFR Part 1910
Appears in 3 contracts
Samples: License and Distribution Agreement (Fuelcell Energy Inc), License and Distribution Agreement (Fuelcell Energy Inc), License and Distribution Agreement (Fuelcell Energy Inc)