Facility Operating Constraints Sample Clauses

Facility Operating Constraints. The Facility has the capacity to accommodate approximately 400 trains per week. Other Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by ABP from time to time. The Facility has 5 Stabling lines which can be used for Stabling, Operational Stabling, and Weekend Stabling.
AutoNDA by SimpleDocs
Facility Operating Constraints. The Facility has the capacity to accommodate approximately:  Newport Docks - 84 trains per week  Cardiff Docks - 84 trains per week  Xxxxx Docks - 56 trains per week  Swansea Docks - 84 trains per week No stabling facilities are available at the Facility but there is availability at adjacent facilities operated by XX Xxxxxxxx at Newport, Cardiff and Swansea. The Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by ABP from time to time.
Facility Operating Constraints. The Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by FDRC from time to time.
Facility Operating Constraints. Access to the Facility to operate Train Services between the Network and Three Bridges LMD (RH10 1LY) is available from 0001hrs Monday to 2359hrs Sunday . Other Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by the Facility Owner from time to time.
Facility Operating Constraints. The Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by DBCi from time to time. Any amendments to the Facility Operating Constraints shall only be made with the prior consent of Rail for London (not to be unreasonably withheld). Should the parties fail to agree any changes to the Facility Operating Constraints as aforesaid then the matter may be referred as a Dispute to be resolved in accordance with Clause 12.
Facility Operating Constraints. The facility has the capacity to accommodate [ insert capacity – trains per week/maximum train length or other measure ] Other Facility Operating Constraints will be specified in the relevant Safe System of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by DB Cargo from time to time. The Facility has [ ] lines which can be used for [Stabling, Operational Stabling].

Related to Facility Operating Constraints

  • FACILITY OPERATIONS FACILITY OPERATION MON TUES WED THURS FRI SAT SUN A. Regular hours facility is open to public and employees 10A -9P 10A -9P 10A -9P 10A -9P 10A -5P 10A -5P Closed B. Hours facility is open to public and employees

  • Environmental constraints and management Describe or cross refer to environmental constraints applicable to the Contractor’s plan and his activities on the Affected Property and how they should be managed. Include here or cross refer to an Annexure to the Service Information. The Contractor shall comply with the environmental criteria and constraints stated in Annexure

  • Procedural and Operational Requirements By accepting and using the Financial Assistance awarded under this Agreement and for this Program Element, LPHA agrees to conduct activities in accordance with the following requirements:

  • Contractual and Operational Compliance Audits (a) ICANN may from time to time (not to exceed twice per calendar year) conduct, or engage a third party to conduct, contractual compliance audits to assess compliance by Registry Operator with its representations and warranties contained in Article 1 of this Agreement and its covenants contained in Article 2 of this Agreement. Such audits shall be tailored to achieve the purpose of assessing compliance, and ICANN will (a) give reasonable advance notice of any such audit, which notice shall specify in reasonable detail the categories of documents, data and other information requested by ICANN, and

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.