Expansion Improvement Allowance Sample Clauses

Expansion Improvement Allowance. Tenant shall be entitled to a one-time improvement allowance (the “Expansion Improvement Allowance”) in the aggregate amount of (i) $5,192,280.00 (i.e., $90.00 per each of the 57,692 rentable square feet in the Phase 1 Expansion Premises), and (ii) $840,050.00 (i.e., $50.00 per each of the 16,801 rentable square feet in the Phase 2 Expansion Premises) for the costs relating to the initial design and construction of the improvements, which are permanently affixed to the Expansion Premises (the “Expansion Improvements”). The portion of the Expansion Improvement Allowance described in item (i) above is referred to herein as the “Phase 1 Expansion Premises Allowance” and the portion of the Expansion Improvement Allowance described in item (ii) above is referred to herein as the “Phase 2 Expansion Premises Allowance”. In addition (and not as part of the Phase 1 Expansion Premises Allowance or the Phase 2 Expansion Premises Allowance), Landlord shall provide up to $0.15 per rentable square foot of the entire Expansion Premises towards the cost of one (1) preliminary space plan for each portion of the Expansion Premises (“Landlord’s Drawing Contribution”), but not the cost of any revisions thereto requested by Tenant or required by Landlord, and only to the extent such drawings reflect items from the Building standards and no portion of the Landlord’s Drawing Contribution, if any, remaining after the completion of the Expansion Improvements shall be available for use by Tenant. In addition to the Expansion Improvement Allowance, Landlord shall also provide an additional allowance of $460,000 (the “HVAC Allowance”) to be utilized by Tenant for the performance of certain HVAC work in the Phase 1 Expansion Premises. The HVAC Allowance shall be deemed part of the Phase 1 Expansion Premises Allowance for all purposes hereunder. Tenant shall utilize at least ninety percent (90%) of Phase 1 Expansion Premises Allowance for Expansion Improvements installed in the Phase 1 Expansion Premises and at least ninety percent (90%) of the Phase 2 Expansion Premises Allowance for Expansion Improvements installed in the Phase 2 Expansion Premises. Landlord shall not be obligated to pay a total amount which exceeds the Expansion Improvement Allowance, HVAC Allowance, and Landlord’s Drawing Contribution. Notwithstanding the foregoing or any contrary provision of the Lease, all Expansion Improvements shall be deemed Landlord’s property under the terms of the Lease. Any unused portion ...
AutoNDA by SimpleDocs
Expansion Improvement Allowance. Landlord shall be obligated to bear the reasonable cost of designing and constructing Landlord's Expansion Construction only up to the amount set forth in the Reference Data Section as "Expansion Improvement Allowance." If the sum of the cost of design and Landlord's Expansion Construction exceeds the amount of the Expansion Improvement Allowance, Tenant shall be responsible for any excess to be billed as set forth in Paragraphs IV and V above.
Expansion Improvement Allowance. Landlord shall provide Tenant with a tenant improvement allowance of up to One Hundred Sixty-Five and 00/100 Dollars ($165.00) per Rentable Square Foot of the Expansion Premises (i.e., up to $2,686,695.00) (“Expansion Improvement Allowance”) to be used toward construction of the Expansion Improvements in the Expansion Premises pursuant to the Expansion Work Letter.
Expansion Improvement Allowance. Tenant shall be entitled to a one-time tenant improvement allowance (the "Expansion Improvement Allowance") in the amount of $144,508.00 for the costs relating to the initial design and construction of Tenant's improvements which are permanently affixed to the Expansion Premises, including without limitation shower facilities and upgrades of the restrooms (the "Expansion Improvements"). In no event shall Landlord be obligated to make disbursements pursuant to this Tenant Work Letter in a total amount which exceeds the Expansion Improvement Allowance. All Expansion Improvements for which the Expansion Improvement Allowance has been made available shall be deemed Landlord's property under the terms of the Lease.
Expansion Improvement Allowance. Tenant shall be entitled to a tenant improvement allowance (the “Expansion Improvement Allowance”) in the amount of $136,242.00 for the costs relating to the initial design and construction of Tenant’s improvements, which are permanently affixed to the Expansion Space (the “Expansion Improvements”). In no event shall Landlord be obligated to make disbursements pursuant to this Tenant Work Letter in a total amount which exceeds the Expansion Improvement Allowance. Any unused portion of the Expansion Improvement Allowance upon completion of the Expansion Improvements shall not be disbursed to Tenant or available to Tenant as a credit against any obligations of Tenant under the Lease. Tenant shall have not more than 180 days after completion of the Expansion Improvements to submit invoices for their cost to Landlord.
Expansion Improvement Allowance. Except as expressly provided in this Work Letter, the total costs and expenses incurred by Landlord in connection with the design and construction of the Expansion Improvements (inclusive of, but not limited to, architectural costs, engineering costs, general contractor costs, and the cost of all local and state filing fees, permits and approvals, if any, required to be obtained in order to perform and complete the Expansion Improvements) shall not exceed an aggregate amount equal to $1,760,625.00 (i.e., $125.00 per rentable square foot of the Expansion Premises) (the "
Expansion Improvement Allowance. In connection with the foregoing, Landlord hereby agrees that, subject to the Expansion Allowance Deadline, Tenant shall be entitled to use the Expansion Improvement Allowance towards the Improvements to be constructed in the Existing Premises, and in addition, subject to the applicable Allowance Deadlines set forth in the Lease, Tenant shall be entitled to use the Improvement Allowance towards the Expansion Improvements to be constructed in the Expansion Premises. If Landlord determines that the total cost of the Expansion Improvements (which shall include the "Coordination Fee", as defined below, as well as all design, construction, installation and other costs) will exceed the Expansion Improvement Allowance, then Tenant shall be solely responsible for all such excess costs which are over and above the Expansion Improvement Allowance (the "Over-Allowance Amount"). Tenant shall pay any Over-Allowance Amount to Landlord within ten (10) days after demand is made therefor by Landlord from time to time (including, at Landlord's election, prior to the commencement of construction of the Expansion Improvements). Any Over-Allowance Amount shall be disbursed by Landlord prior to any Landlord provided funds for the costs of construction of the Expansion Improvements. Tenant hereby acknowledges that Landlord shall be entitled to a fee (the "Coordination Fee") payable by Tenant in an amount equal to three percent (3%) of the Expansion Improvement Allowance, in consideration for Landlord's coordination and supervision of the performance of the Expansion Improvements, which Coordination Fee may be deducted from the Expansion Improvement Allowance to the extent funds are available. Notwithstanding any provision to the contrary contained in the Lease or this Work Letter, in no event shall Landlord be obligated to pay for (A) any moving costs or expenses related to Tenant's move-in or occupancy of the Expansion Premises, and/or (B) any costs or expenses associated with the purchase, installation or maintenance of any furniture (including, but not limited to, the cost of any reception desks, credenzas or chairs, whether identified on the Approved Pricing Plan or not), fixtures, equipment, art, cabling, audio/visual equipment, telecommunications systems, access controls, security systems and equipment, and/or signage related to Tenant's occupancy of the Expansion Premises (collectively, "Tenant's FF&E"). If the total costs of the Expansion Improvements do not exceed the E...
AutoNDA by SimpleDocs
Expansion Improvement Allowance. Landlord shall provide Tenant with a one-time allowance (the “Expansion Improvement Allowance”) in the amount of Fifty-Eight Thousand Eight Hundred Dollars ($58,800), being Twenty Dollars ($20.00) per rentable square foot in the Expansion Space, to be used solely for the costs relating to the design, engineering, permitting and construction of Tenant’s initial improvements which are permanently affixed to the Expansion Space, including, without limitation the costs of adding the Expansion Space to the Existing Premises and all wall and floor coverings (collectively, “Expansion Space Tenant Improvements”), and for the “Soft Costs” defined below.

Related to Expansion Improvement Allowance

  • Improvement Allowance The Lessor is contributing to Lessee an improvement allowance (the “Initial Improvement Allowance”) of $70.000. Lessor must spend the Initial Improvement Allowance on costs related to the construction of the Improvements (as defined in Article 40 of the Lease). As part of the Improvements, Lessor shall provide new carpet for the office area and rear section of the Leased Premises as noted on the attached plan. In addition, the Lessor will paint the walls in the Leased Premises, and provide selective demolition (to be mutually agreed upon). The Lessor will add wall between the R&D lab space and the administrative cubicle area, as noted on the attached plan. The Initial Improvement Allowance will be used to fund Lessor’s activities related to the Improvements under this Exhibit X. Xxxxxx shall not charge Lessee any administration and supervision fee in connection with Xxxxxx’s work on the Improvements. The Leased Premises will be available on or about March 1, 2020 for work to commence work on the Improvements and Lessee to inspect the Building and the Leased Premises. Promptly following mutual execution of the Lease but prior to Lessor commencing any work under this Exhibit D, Lessor shall submit to Lessee, for its consent, a detailed construction plan, specifying materials to be used, renderings and schematics for the initial Improvements described above (the “Initial Improvement Plan”). Following Xxxxxx’s consent to the Initial Improvement Plan, Lessor shall exercise all reasonable efforts to have their general contractor bid and substantially complete the work for the Initial Improvements by April 1, 2020. Lessee shall have the right to inspect the Initial Improvements as they are being made. Lessor shall proceed with and complete the construction of the Improvements described above. As soon as such improvements have been Substantially Completed, Lessor shall notify Lessee in writing of the date that the Improvements were Substantially Completed. The Improvements shall be deemed substantially completed (“Substantially Completed”) when only punch list items remain which do not prevent in any material way the use of the Improvements for the purposes for which they were intended. If the Initial Improvement Allowance exceeds $70,000, then Xxxxxx will reimburse Lessor within thirty (30) days of the Improvements being substantially completed. 3706364.3/MTBA-JRP

  • Tenant Improvement Allowance Subject to the terms of this Section 38 set forth below, there shall be paid by the Landlord as the Landlord’s contribution toward Tenant’s Initial Alterations, the sum (“Allowance”) of $7,191,555.84, based upon a contribution of $68.04 per rentable square foot for 105,696 rentable square feet in the Initial Premises. Tenant shall submit to Landlord Tenant’s good faith estimate (“Qualified Cost Estimate”) of the Qualified Costs (hereinafter defined) to be incurred by Tenant in connection with its move to and the construction of Initial Alterations in the Premises. Installments of the Allowance shall be payable in accordance with the procedures set forth below. Installments of the Allowance, which shall in no event exceed in the aggregate the amount of the Allowance, shall be paid to Tenant (or, at Landlord’s option if Landlord reasonably determines that Tenant is not paying its contractors and such failure to pay may give rise to a lien against the Building, to the order of the contractor that performed the work set forth in the respective invoices) or, at Tenant’s option to Tenant’s contractors, with respect to Qualified Costs theretofore incurred by Tenant (and not theretofore paid to Tenant or which were Tenant’s responsibility as set forth in this Article 38) for which Tenant has submitted a requisition consisting of, (i) in the case of other than costs incurred under architectural and engineering contracts (collectively “Professional Services Contracts”) or under construction contracts, such as furniture or moving or professional fees that are contracted for by Tenant separate from construction and Professional Services Contracts, paid invoices, (ii) in the case of Professional Services Contracts, invoices, and (iii) in the case of construction costs (a) an application for payment and sworn statement of a contractor performing general contracting work in the Premises substantially in the form of AIA Document G-702 covering all work for which disbursement is to be made to a date specified therein which is part of the construction contract; (b) a certification from an AIA architect substantially in the form of the Architect’s Certificate for Payment which is located on AIA Document G702, Application and Certificate of Payment; (c) contractor’s, project managers and subcontractor’s waivers of liens which shall cover all applicable items of Qualified Costs under such construction contracts for which disbursement is being requested and any other statements and forms required for compliance with the mechanics’ lien laws of the Commonwealth of Massachusetts, together with invoices with respect to such Qualified Costs and such other supporting data as Landlord or Landlord’s Mortgagee may reasonably require; (iv) a cost breakdown for each trade or subcontractor performing the work included in Qualified Costs for which a request for disbursement under such construction contracts is being made; (v) copies of all construction contracts for the such Alterations, together with copies of all change orders, if any; and (iii) a request to disburse from Tenant containing an acknowledgement by Tenant of the work done and a good faith estimate of the cost to complete the Initial Alterations to the Premises. Upon completion of the Initial Alterations, and as part of the requisition for final disbursement of the Allowance for hard construction costs, Tenant shall furnish Landlord with: (1) general contractor and architect’s completion affidavits, (2) full and final waivers of lien, (3) receipted bills covering all labor and materials expended and used, (4) as-built plans of the Alterations, and (5) the certification of Tenant’s architect to the Landlord that, based on on-site observation and the data comprising the application for disbursement, to the best of the architect’s knowledge, information and belief, the Alterations have progressed as indicated in the application, the quality of the Alterations is in accordance with the construction contract documents and the contractor is entitled to; payment of the amount certified in the application. Notwithstanding the foregoing, if the Qualified Cost Estimate exceeds the Allowance, Tenant shall be entitled to payments with respect to any requisition in accordance with the terms hereof except that each individual disbursement of the Allowance by Landlord shall be in the same ratio to the amount properly requisitioned as the Allowance bears to the Adjusted Qualified Cost Estimate (hereinafter defined). “Adjusted

  • Tenant Improvement Allowance Items Except as otherwise set forth in this Tenant Work Letter, the Tenant Improvement Allowance shall be disbursed by Landlord only for the following items and costs (collectively the “Tenant Improvement Allowance Items”):

  • Disbursement of Tenant Improvement Allowance During the construction of the Tenant Improvements, Landlord shall make monthly disbursements of the Tenant Improvement Allowance for Tenant Improvement Allowance Items for the benefit of Tenant and shall authorize the release of monies for the benefit of Tenant as follows.

  • Disbursement of the Tenant Improvement Allowance Except as otherwise set forth in this Tenant Work Letter, the Tenant Improvement Allowance shall be disbursed by Landlord (each of which disbursement shall be made pursuant to Landlord’s standard disbursement process), only for the following items and costs (collectively, the “Tenant Improvement Allowance Items”):

  • TI Allowance Landlord shall provide to Tenant a tenant improvement allowance (collectively, the “TI Allowance”) as follows:

  • Tenant Improvement Costs The Tenant Improvements’ cost (the “Tenant Improvement Costs”) shall mean and include any and all costs and expenses of the Work, including, without limitation, all of the following:

  • Tenant Allowance Landlord shall provide Tenant an allowance for each Building in an amount not to exceed the sum set forth in the Basic Lease Information for the Tenant Allowance for the applicable Building (collectively, the “Tenant Allowance”), to be applied toward the cost of the following items in respect of the Tenant Improvements in the applicable Building: Architectural and engineering fees, space planning, building permits or other governmental fees, and the cost of labor, materials, contractors fees and overhead, and other charges included in the construction contract for construction of Tenant Improvements, including the contractor’s fee, overhead and general conditions, sales and use taxes, the cost of the builder’s risk insurance during construction and all testing and inspection costs. If Landlord elects to itself construct the Restroom Improvements, Landlord shall make payments to its contractor for the Restroom Improvements as and when such costs are incurred and deduct the amount of such payments from the Tenant Allowance for Building 2 up to the maximum amount stated in Paragraph I of this Work Letter. Landlord shall not be obligated to disburse any remaining portion of the Tenant Allowance attributable to a Building until such time as (i) the Commencement Date for the applicable Building has occurred and Tenant has accepted delivery of the Building and made the initial prepayment of Rent with respect to the applicable portion of the Premises; and (ii) Tenant has delivered to Landlord and Landlord has approved, in Landlord’s reasonable discretion, all of the following: (A) invoices, paid receipts and/or related evidence reasonably acceptable to Landlord establishing that Tenant has paid an amount equal to that portion of the Tenant Allowance requested by Tenant to third parties in connection with the Tenant Improvements in the applicable Building; (B) executed unconditional final mechanics’ lien releases, in statutory form, from Tenant’s contractor and all subcontractors, laborers, materialmen and suppliers used by Tenant with respect to all work in and to the Premises located in the applicable Building; (C) a certificate from Tenant’s architect or space planner, in a form reasonably acceptable to Landlord, certifying that the construction of the Tenant Improvements in the applicable Building has been substantially completed and meets all applicable building codes; (D) a copy of the certificate of occupancy (or similar governmental authorization) for the applicable Building; (E) “as-built” drawings for the Tenant Improvements in the applicable Building, signed by either Tenant’s architect, space planner or contractor, and electronic CAD files from Tenant’s Contractor and all subcontractors; and (F) a final punch list signed off by both Tenant and Landlord and/or their architects. Thereafter, Landlord shall deliver, within fifteen (15) days following Tenant’s delivery of the materials and information required for disbursement thereof in the preceding sentence, a check payable to Tenant in the amount of that portion of the Tenant Allowance requested by Tenant and paid to third parties in connection with the Tenant Improvements for the applicable Building (which amount shall not exceed the portion of the Tenant Allowance provided for such Building as specified in the Basic Lease Information). Landlord’s payment of any portion of the Tenant Allowance shall not be deemed Landlord’s approval any of the Tenant Improvements absent Landlord’s prior approval pursuant to this Work Letter. Landlord’s obligation to disburse the Tenant Allowance for each Building under this Paragraph 9(b) shall expire six (6) months after the Delivery Date for the applicable Building, subject to extension due to Force Majeure, such that Landlord shall not be obligated to provide to Tenant any undisbursed portion of the Tenant Allowance for a Building unless Tenant has delivered to Landlord all documents required above within nine (9) months after the Delivery Date of such Building.

  • Construction Allowance Landlord shall provide to Tenant a construction allowance not to exceed $45.00 per rentable square foot in the Premises (the “Construction Allowance”) to be applied toward the Total Construction Costs, as adjusted for any changes to the Tenant’s Work. No advance of the Construction Allowance shall be made by Landlord until Tenant has first paid to the contractor from its own funds (and provided reasonable evidence thereof to Landlord) the anticipated Excess Amount. Thereafter, Landlord shall pay to Tenant the Construction Allowance, to be applied solely toward the remaining Total Construction Costs and not in reimbursement of the Excess Amount paid by Tenant, in multiple disbursements (but not more than once in any calendar month) following the receipt by Landlord of the following items: (i) a request for payment, (ii) final, unconditional or partial lien waivers, as the case may be, from all persons performing work or supplying or fabricating materials for the Tenant’s Work, fully executed, acknowledged and in recordable form, (iii) copies of all invoices and proof of payment of same, and (iv) the Architect’s certification that the Tenant’s Work for which reimbursement has been requested has been finally completed, including (with respect to the last application for payment only) any punch-list items, on the appropriate AIA form or another form approved by Landlord, and, with respect to the disbursement of the last 10% of the Construction Allowance: (1) the permanent certificate of occupancy issued for the Premises, (2) Tenant’s occupancy of the Premises, (3) delivery of the “as-built” plans for the Tenant’s Work as constructed (and as set forth above) to Landlord’s construction representative (set forth below), and (4) an estoppel certificate confirming such factual matters as Landlord or Landlord’s Mortgagee may reasonably request (collectively, a “Completed Application for Payment”). Landlord shall pay the amount requested in the applicable Completed Application for Payment to Tenant within 30 days following Tenant’s submission of the Completed Application for Payment. If, however, the Completed Application for Payment is incomplete or incorrect, Landlord’s payment of such request shall be deferred until 30 days following Landlord’s receipt of the corrected Completed Application for Payment. Notwithstanding anything to the contrary contained in this Exhibit, Landlord shall not be obligated to make any disbursement of the Construction Allowance during the pendency of any of the following: (A) Landlord has received written notice of any unpaid claims relating to any portion of the Tenant’s Work or materials in connection therewith, other than claims which will be paid in full from such disbursement, (B) there is an unbonded lien outstanding against the Project or the Premises or Tenant’s interest therein by reason of work done, or claimed to have been done, or materials supplied or specifically fabricated, claimed to have been supplied or specifically fabricated, to or for Tenant or the Premises, (C) the conditions to the advance of the Construction Allowance are not satisfied, or (D) an Event of Default by Tenant exists. If the Total Construction Costs for the Premises are less than the Construction Allowance, then Tenant shall not be entitled to receive payment or credit for such difference and Landlord shall retain the same. The Construction Allowance must be used (that is, the Tenant’s Work must be fully complete and the Construction Allowance disbursed) within twenty-four (24) months following the Commencement Date or shall be deemed forfeited with no further obligation by Landlord with respect thereto, time being of the essence with respect thereto. The Construction Allowance may be used in Tenant’s discretion for Tenant’s Work with no stipulation from Landlord as to how much of the Construction Allowance is allocated within the various spaces in the Premises.

  • Expansion Premises In addition to the Original Premises, commencing on the Expansion Premises Commencement Date (as defined below), Landlord leases to Tenant, and Tenant leases from Landlord, the Expansion Premises.

Time is Money Join Law Insider Premium to draft better contracts faster.