Existing Facility Surveys Sample Clauses

Existing Facility Surveys. Architect shall research, assemble, review and supplement information for Projects involving alterations and additions to existing facilities or determining new space usage in conjunction with a new building program and including:
AutoNDA by SimpleDocs
Existing Facility Surveys. 9.1.4 Master Scheduling (Summary level, major deliverables, project milestone)
Existing Facility Surveys. Integrated Scheduling Testing and Balancing Laboratory Testing (Soils, Materials, Environmental, Welding, Steel Construction) Exhaust Stack Testing Vibration Analysis Radio Frequency Interference Testing
Existing Facility Surveys. Architect-Engineer shall research, assemble, review and supplement information for Projects involving alterations and additions to existing facilities or determining new space usage in conjunction with a new building program and including: Field Observation; Review of existing design data; Review of available existing structural drawings and provide recommendation for seismic conditions from plans; Review and field observations of existing mechanical systems and provide written recommendations; Review and field observation of existing electrical systems to include low voltage and fire life safety, and provide written recommendation to the District; Provide written report and advise District of additional investigations or information reasonably required to prepare the Construction Documents; and Review of existing drawings for inaccuracies absent Architect-Engineer's knowledge of any inaccuracy or incompleteness, Architect-Engineer shall be entitled to rely upon the accuracy and completeness thereof. Architect-Engineer shall describe and advise District of additional investigations or information reasonably required to prepare the Construction Documents. Estimate of Construction Cost: Based upon the programming phase services performed, review initial budget estimates by applying parametric costs, unit costs, and other standard cost data to space and facilities requirements. Consider foreseeable Project costs, including construction, utilities connections, off-Site improvements, seismic upgrades, landscaping, accessibility requirements, temporary relocation requirements, permits, fees, furniture, and movable and installed equipment. Report to District regarding variances between the Architect-Engineers’ current Estimate of Construction Cost and the initial budget estimates contained in District’s Program budget or Facilities Master Plan.

Related to Existing Facility Surveys

  • Existing Facilities Each of the Existing Facilities shall be repaid in full and terminated and all collateral security therefor shall be released, and the Administrative Agent shall have received pay-off letters in form and substance satisfactory to it evidencing such repayment, termination and release.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Additional Facilities If the CAISO determines that it requires Operational Control over additional transmission lines and associated facilities not then constituting part of the CAISO Controlled Grid in order to fulfill its responsibilities in relation to the CAISO Controlled Grid then the CAISO shall apply to FERC pursuant to Section 203 of the Federal Power Act, and shall make all other regulatory filings necessary to obtain approval for such change of control and shall serve a copy of all such applications on the affected Participating TO and the owner of such lines and facilities (if other than the Participating TO). In the event that a Party invokes the dispute resolution provisions identified in Section 15 with respect to the transfer of Operational Control over a facility, such facility shall not be transferred while the dispute resolution process is pending except pursuant to Section 4.5.2.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Equipment and Facilities For On-Site Courses, you will supply the facility and equipment as set forth at xxx.xxxxxx.xxx/xxxxxxxx/xxxxxxxxx/xxxxxxxxxxxx.xxxx. If Red Hat agrees to provide the training facilities and hardware, you will be liable for any loss or destruction of this equipment and hardware used in connection with the Training.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.