Excavation, Site Preparation, Sewer and Watermain Sample Clauses

Excavation, Site Preparation, Sewer and Watermain a) Site preparation shall mean the excavating of ground to sub-grade level and shall not include pile driving, drilling, boring, dock work, tunnel work or underground services.
AutoNDA by SimpleDocs
Excavation, Site Preparation, Sewer and Watermain. (a) Site preparation shall mean the excavating of ground to sub-grade level and shall not include pile driving, drilling, boring, dock work, tunnel work or underground The standard work week shall be fifty (50) hours from Monday to Friday inclusive. The standard work day shall not be more than ten (10) hours per day at straight time between and The Employer may require employees to perform work in excess of their regularly assigned hours and employees shall be given as much advance notice as possible. time worked by an employee before and after his regular shift on Monday to Friday inclusive except as provided in the HOURS OF WORK clause and all hours worked on Saturday and Sunday, shall be paid for at the rate of double time, (except as provided in the Schedules attached hereto). Double time shall continue for hours worked until the employee has eight (8) consecutive hours off.

Related to Excavation, Site Preparation, Sewer and Watermain

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • FABRICATION Making up data or results and recording or reporting them.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.