Common use of Estimated Cost Clause in Contracts

Estimated Cost. For the scope of services outlined within this proposal, we estimate a total cost of about $26,608.50. The breakdown of the estimated cost is as follows: Item Estimated Quantity Unit Unit Price Estimated Cost Field Activities: Visual pavement evaluation by senior engineer 4 hours $ 150.00 $ 600.00 Mobe/demobe of drill rig 1 Lump Sum $ 300.00 Drilling/sampling of 11 borings (2 at 100’ and 9 at 10’) 290 feet $ 18.00 $ 5,220.00 Locate/identify/mark borings by graduate engineer 3 hours $ 85.00 $ 255.00 Coring of existing pavement 11 each $ 80.00 $ 880.00 Field logging by qualified technician 32 hours $ 65.00 $ 2,080.00 Limited traffic control (cones, signs, technician as flagman during coring and drilling along the roadway) 1 Lump Sum $ 1,600.00 Grouting of roadway boreholes after drilling 290 feet $ 8.00 $ 2,320.00 Vehicle Charge 39 hours $ 7.50 $ 292.50 Sub-Total $ 13,547.50 Laboratory Testing: Atterberg Limits (ASTM D4318) 48 each $ 60.00 $ 2,880.00 % Pass No. 200 Sieve (ASTM D1140) 36 each $ 46.00 $ 1,656.00 Moisture Content (ASTM D2216) 90 each $ 9.00 $ 810.00 Unconfined Compression (ASTM D2166) 20 each $ 44.00 $ 880.00 Item Estimated Quantity Unit Unit Price Estimated Cost Standard Xxxxxxx Test (ASTM D698) 1 each $ 175.00 $ 175.00 California Bearing Ratio, 3-Point (ASTM D1883) 3 each $ 185.00 $ 555.00 Sub-Total $ 6,956.00 Engineering, coordination, supervision, analysis, and report preparation*: Senior engineer, P.E. 12 hours $ 150.00 $ 1,800.00 Graduate engineer/EIT 45 hours $ 85.00 $ 3,825.00 Clerical/Drafting Support 8 hours $ 60.00 $ 480.00 Sub-Total $ 6,105.00 TOTAL FOR THE GEOTECHNICAL INVESTIGATION $ 26,608.50

Appears in 2 contracts

Samples: Agreement for Professional Engineering Services, Agreement

AutoNDA by SimpleDocs

Estimated Cost. For the scope of services outlined within this proposal, we estimate a total cost of about $26,608.5016,967.00. The breakdown of the estimated cost is as follows: P a g e 3 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 2021 Item Estimated Quantity Unit Unit Price Estimated Cost Field Activities: Visual pavement evaluation by senior engineer 4 hours $ 150.00 $ 600.00 Mobe/demobe of drill rig 1 Lump Sum $ 300.00 Drilling/sampling of 11 8 borings (2 at 100’ and 9 at 10’) 290 to 20 feet 160 feet $ 18.00 $ 5,220.00 2,880.00 Locate/identify/mark xxxx borings by graduate engineer 3 2 hours $ 85.00 $ 255.00 170.00 Coring of existing pavement 11 8 each $ 80.00 $ 880.00 640.00 Field logging logging/supervising coring/drilling by qualified field technician 32 16 hours $ 65.00 $ 2,080.00 1,040.00 Limited traffic control (cones, signs, technician as flagman during coring and drilling along the roadwaydrilling) 1 Lump Sum $ 1,600.00 800.00 Grouting of roadway boreholes after drilling 290 160 feet $ 8.00 $ 2,320.00 1,280.00 Vehicle Charge 39 18 hours $ 7.50 $ 292.50 135.00 Sub-Total $ 13,547.50 7,245.00 Laboratory Testing: Atterberg Limits (ASTM D4318) 48 28 each $ 60.00 $ 2,880.00 1,680.00 % Pass No. 200 Sieve (ASTM D1140) 36 28 each $ 46.00 $ 1,656.00 1,288.00 Moisture Content (ASTM D2216) 90 64 each $ 9.00 $ 810.00 576.00 Unconfined Compression (ASTM D2166) 20 12 each $ 44.00 $ 880.00 Item Estimated Quantity Unit Unit Price Estimated Cost 528.00 Standard Xxxxxxx Test (ASTM D698) 1 each $ 175.00 $ 175.00 California Bearing Ratio, 3-Point (ASTM D1883) 3 each $ 185.00 $ 555.00 Sub-Total $ 6,956.00 4,802.00 Engineering, coordination, supervision, analysis, and report preparation*: Senior engineer, P.E. 12 10 hours $ 150.00 $ 1,800.00 1,500.00 Graduate engineer/EIT 45 36 hours $ 85.00 $ 3,825.00 3,060.00 Clerical/Drafting Support 8 6 hours $ 60.00 $ 480.00 360.00 Sub-Total $ 6,105.00 4,920.00 TOTAL FOR THE GEOTECHNICAL INVESTIGATION $ 26,608.5016,967.00 * includes desktop review of surface faults within the project area. P a g e 4 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 2021

Appears in 2 contracts

Samples: agendalink.co.fort-bend.tx.us:8085, agendalink.co.fort-bend.tx.us:8085

AutoNDA by SimpleDocs

Estimated Cost. For the scope of services outlined within this proposal, we estimate a total cost of about $26,608.5039,736.00. The breakdown of the estimated cost is as follows: Item Estimated Quantity Unit Unit Price Estimated Cost Field Activities: Visual pavement evaluation Initial site visit by senior engineer Senior engineer, P.E. 4 hours $ 150.00 $ 600.00 Mobe/demobe of drill rig 1 Lump Sum $ 300.00 Coring of existing pavement at 2 locations 2 each $ 80.00 $ 160.00 Drilling/sampling of 11 37 borings (2 at 100’ and 9 at 10’) 290 to 15 feet 555 feet $ 18.00 $ 5,220.00 9,990.00 Locate/identify/mark borings by graduate engineer 3 6 hours $ 85.00 $ 255.00 Coring of existing pavement 11 each $ 80.00 $ 880.00 510.00 Field logging of soil samples by qualified technician 32 48 hours $ 65.00 $ 2,080.00 3,120.00 Limited traffic control (cones, signs, technician as flagman during coring and drilling along the roadwayDallas Street and California Street) 1 Lump Sum $ 1,600.00 600.00 Grouting of roadway 2 boreholes after drilling 290 30 feet $ 8.00 9.00 $ 2,320.00 270.00 Vehicle Charge 39 60 hours $ 7.50 $ 292.50 450.00 Sub-Total $ 13,547.50 16,000.00 Laboratory Testing: Atterberg Limits (ASTM D4318) 48 80 each $ 60.00 $ 2,880.00 4,800.00 % Pass No. 200 Sieve (ASTM D1140) 36 48 each $ 46.00 $ 1,656.00 2,208.00 Moisture Content (ASTM D2216) 90 260 each $ 9.00 $ 810.00 2,340.00 Unconfined Compression (ASTM D2166) 20 32 each $ 44.00 $ 880.00 1,408.00 Standard Xxxxxxx Test (ASTM D698) 2 each $ 175.00 $ 350.00 California Bearing Ratio, 3-Points per set (ASTM D1883) 6 each $ 185.00 $ 1,110.00 Sub-Total $ 12,216.00 Item Estimated Quantity Unit Unit Price Estimated Cost Standard Xxxxxxx Test (ASTM D698) 1 each $ 175.00 $ 175.00 California Bearing Ratio, 3-Point (ASTM D1883) 3 each $ 185.00 $ 555.00 Sub-Total $ 6,956.00 Engineering, coordination, supervision, analysis, and report preparation*: Senior engineer, P.E. 12 28 hours $ 150.00 $ 1,800.00 4,200.00 Graduate engineer/EIT 45 engineer 72 hours $ 85.00 $ 3,825.00 Clerical/Drafting Support 8 6,120.00 Engineering Assistant 20 hours $ 60.00 $ 480.00 1,200.00 Sub-Total $ 6,105.00 11,520.00 TOTAL FOR THE GEOTECHNICAL INVESTIGATION $ 26,608.5039,736.00

Appears in 2 contracts

Samples: Agreement, Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.