Common use of Erosion Prevention and Control Clause in Contracts

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment Methods

Appears in 3 contracts

Samples: Service Timber Sale Contract, Service Timber Sale Contract, Service Timber Sale Contract

AutoNDA by SimpleDocs

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SAMPLE SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment Methods

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment Methods

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. Scarification – N/A Backblading Within recreation development sites and public use areas designated on Contract Area Map, Purchaser shall, at Forest Service request, backblade skid trails in lieu of cross ditching. SAMPLE Tillage In addition to meeting the requirements of B6.64, unless otherwise agreed in writing, tillage shall be required on the areas listed in the following table. Tillage shall be accomplished by equipment that will lift and fracture the soil by vertical and lateral shattering, leaving soil loosened through the full width and depth of the compacted layer with the topsoil remaining substantially in place rather than being inverted. Tillage depth is shown in the following table. Agreement in writing may be made to a lesser depth if rocks or other limiting site conditions are encountered. Tillage shall be limited to periods when soil dryness will result in crumbled soil, avoiding the formation of large clods. Contractor and Forest Service shall agree in writing on the timing of completion of such work to coordinate with desirable soil moisture conditions. Areas to Till Tillage Depth (Inches) Maximum Acres to Treat Landings N/A Tillage N/A Main Skid Roads and Tractor Roads designated by Forest Service N/A N/A Temporary Roads N/A N/A C6.7# - SLASH TREATMENT. (8/2006) Purchaser shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Purchaser shall be in accordance with the following slash plan and specifications, and the Sale Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Purchaser for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Purchaser's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Purchaser for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Purchaser shall jointly develop a schedule for completion of slash treatment on the various portions of Sale Area prior to Purchaser's Operations. Removing may be substituted for treatment of any other specified method. SAMPLE By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be treated by the other(s). See the slash treatment specification table below. SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment Methods

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 CT6.5 and B6.6 BT6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6Specifications Pursuant to CT6.6# - EROSION PREVENTION AND CONTROL. Erosion Prevention and Control Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. Scarification N/A Backblading N/A SAMPLE Tillage N/A SPECIFICATIONS PURSUANT TO C6.7In addition to meeting the requirements of BT6.64, unless otherwise agreed in writing, tillage shall be required on the areas listed in the following table. Tillage shall be accomplished by equipment that will lift and fracture the soil by vertical and lateral shattering, leaving soil loosened through the full width and depth of the compacted layer with the topsoil remaining substantially in place rather than being inverted. Tillage depth is shown in the following table. Agreement in writing may be made to a lesser depth if rocks or other limiting site conditions are encountered. Tillage shall be limited to periods when soil dryness will result in crumbled soil, avoiding the formation of large clods. Purchaser and Forest Service shall agree in writing on the timing of completion of such work to coordinate with desirable soil moisture conditions. Areas to Till Tillage Depth (Inches) Maximum Acres to Treat Main Skid Roads and Tractor Roads designated by Forest Service 16 5 Temporary Roads 16 4 CT6.7# - SLASH TREATMENT (8/2006) Purchaser shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Purchaser shall be in accordance with the following slash plan and specifications, and the Sale Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Purchaser for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Purchaser's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Purchaser for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Purchaser shall jointly develop a schedule for completion of slash treatment on the various portions of Sale Area prior to Purchaser's Operations. SAMPLE Removing may be substituted for treatment of any other specified method. By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be shown on Sale Area Map or listed in the following tables treated by the following symbols: Slash Treatment Methodsother(s). See the slash treatment specification table below.

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/200810/04) Erosion Unless otherwise agreed in writing, Purchaser shall complete erosion prevention and control workwork required in section B6.6, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 15 calendar days after completion of skidding and/or yarding operations related to for each landing are substantially completed or after Forest Service designation landing. Designation of on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 During periods of accelerated water runoff, especially during the spring runoff and periods of heavy rainfall, Purchaser shall inspect and open culverts and drainage structures, construct special cross ditches for road runoff, and take other reasonable measures needed to prevent soil erosion and siltation of streams. When operations are active outside the Normal Operating Season defined in A16, erosion control work will be kept current and will be completed as long thereafter as operations continue the work shall be done as promptly soon as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6C6.601# - EROSION PREVENTION AND CONTROLCONTROL SEEDING. Vegetative Soil Stabilization N/A Special Erosion Prevention Measures (3/07) Following completion of skidding and yarding operations in an area, Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion seed and fertilize all exposed areas of tractor roads, raw soil on skid trails, landings, cable yarding corridorsfirebreaks, tractor-end lined corridors slides, slumps, Temporary Roads and Temporary Road fills where necessary traveled ways of National Forest system roads scheduled for stabilization by Purchaser after operations. Special Provision C5.419# - SYSTEM ROAD STABILIZATION contains a list of the roads requiring seeding and fertilizing. Soil on areas to supplement other erosion prevention measures required elsewhere be seeded shall be left in this contracta roughened condition favorable to the retention and germination of the seed or as specified in Special Provision C6.633# - TEMPORARY ROAD, SKID TRAIL/SKID ROAD AND LANDING SCARIFICATION. In no event Seed and fertilizer shall Purchaser be required spread evenly at the rate of 23 pounds of seed and 200 pounds of fertilizer per acre. When fertilizer and seed are applied in separate operations, the second operation shall be carried out within 72 hours of the first. Application shall be during the period June 1 to treat more acres than that shown in June 30 and October 1 to October 31 and under the legend of Sale Area Mapabove specified conditions unless otherwise approved. The specific locations kinds and amounts of seed to be treated sown in terms of pure live seed (PLS) shall be designated on be: Species of Seed PLS Pounds per Acre Slender Wheat Grass “Highlander or Pryor” 3 Mt. Brome “Bromar” 4 Streambank Wheatgrass “Sodar” 4 Sheep fescue “Durar” (Festuca ovina) 5 White Dutch Clover or Aliske Clover (Tirfolium hybridum) 3 Annual Rye (Lolimu multiflorum) 4 TOTAL 23 Purchaser shall provide to the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment Methods:

Appears in 1 contract

Samples: www.fs.usda.gov

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization Where soil has been disturbed by Purchaser's Operations and the establishment of vegetation is needed to minimize erosion, Purchaser shall take appropriate measures normally used to establish an adequate cover of grass or other vegetation acceptable to Forest Service or take other agreed stabilization measures. Forest Service shall designate on the ground such disturbed areas annually as logging and Temporary Road construction are completed. Forest Service upon request shall provide advice as to soil preparation and the application of suitable seed mixtures, mulch and fertilizer and the timing of such work. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. Purchaser shall use the type of native seed mixtures, mulch, and fertilizer as listed below: Seed Mix Pounds/Acre Type of Mulch Fertilizer US Forest Service Botanist will supply a species list upon request. 10-15 lbs N/A N/A N/A 20 xxxxx straw(hay) per acre State of California Certified weed free straw (hay) N/A SAMPLE Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods In addition to meeting the requirements of B6.63 and B6.64, Purchaser shall be shown on Sale Area Map or listed in scarify the following tables by the following symbols: Slash Treatment Methodsareas; unless otherwise agreed:

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization Where soil has been disturbed by Purchaser's Operations and the establishment of vegetation is needed to minimize erosion, Purchaser shall take appropriate measures normally used to establish an adequate cover of grass or other vegetation acceptable to Forest Service or take other agreed stabilization measures. Forest Service shall designate on the ground such disturbed areas annually as logging and Temporary Road construction are completed. Forest Service upon request shall provide advice as to soil preparation and the application of suitable seed mixtures, mulch and fertilizer and the timing of such work. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. Purchaser shall use the type of native seed mixtures, mulch, and fertilizer as listed below: Seed Mix Pounds/Acre Type of Mulch Fertilizer Elymus glaucas 10-15 N/A N/A Bromus carinatus 10-15 N/A N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment Methods.

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. TABLE A Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser Contractor shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser Contractor be required to treat more acres than that shown in the legend of Sale Contract Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SAMPLE In addition to meeting the requirements of B6.64, unless otherwise agreed in writing, tillage shall be required on the areas listed in the following table. Tillage shall be accomplished by equipment that will lift and fracture the soil by vertical and lateral shattering, leaving soil loosened through the full width and depth of the compacted layer with the topsoil remaining substantially in place rather than being inverted. Tillage depth is shown in the following table. Agreement in writing may be made to a lesser depth if rocks or other limiting site conditions are encountered. Tillage shall be limited to periods when soil dryness will result in crumbled soil, avoiding the formation of large clods. Contractor and Forest Service shall agree in writing on the timing of completion of such work to coordinate with desirable soil moisture conditions. Areas to Till Tillage Depth (Inches) Maximum Acres to Treat Landings 24 32 Main Skid Roads and Tractor Roads designated by Forest Service 18 16 Temporary Roads 24 15 C6.7# - SLASH TREATMENT (12/2006) Contractor shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Contractor shall be in accordance with the following slash plan and specifications, and the Contract Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Contractor for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Contractor's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Contractor for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Contractor shall jointly develop a schedule for completion of slash treatment on the various portions of Project Area prior to Contractor's Operations. Removing may be substituted for treatment of any other specified method. By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be treated by the other(s). SAMPLE See the slash treatment specification table below. See Table A. SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/200608/2006) TABLE A Specified slash treatment methods shall be shown on Sale Contract Area Map or listed in the following tables by the following symbols: Slash Treatment MethodsMethods Symbol Method Definition DECK “Decking” large material Logging slash 3 inches or larger in large end d.o.b. and 10 feet or more in length shall be Decked for disposal by Forest Service by piling pieces parallel to each other. MACH "Machine Piling" Concentrations of Logging Slash, excluding scattered individual pieces, shall be Machine Piled by tractor equipped with brush rake for disposal by Forest Service.

Appears in 1 contract

Samples: Integrated Resource Timber Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Table A Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. Scarification N/A Backblading Backbladding N/A Tillage N/A Sale Name: Dragon MP Thin Page 160 Contract 2400-6, (6/06) C6.7# - SLASH TREATMENT (08/2006) Purchaser shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Purchaser shall be in accordance with the following slash plan and specifications, and the Sale Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Purchaser for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Purchaser's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Purchaser for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Purchaser shall jointly develop a schedule for completion of slash treatment on the various portions of Sale Area prior to Purchaser's Operations. Removing may be substituted for treatment of any other specified method. By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be treated by the other(s). See the slash treatment specification table below. See Table A. Sale Name: Dragon MP Thin Page 161 Contract 2400-6,(6/06) SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by using the following symbols: Slash Treatment MethodsMethods Symbol Method Definition MACH “Machine Piling” Concentrations of Logging Slash, excluding scattered individual pieces, shall be Machine Piled by tractor equipped with brush rake for disposal by Forest Service.

Appears in 1 contract

Samples: Service Timber Sale Contract

AutoNDA by SimpleDocs

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Table A Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading Erosion hazard mitigations, such as mulch, certified weed-free straw, and xxxxxxx will be utilized in areas where sufficient slash or wood chips or by agreement giving other treatment is unavailable to portion of tractor roadsadequately control erosion, particularly on skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres trails with a slope that is greater than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above20%. Soil Scarification. Scarification N/A Backblading Backbladding N/A Tillage N/A Sale Name: Hog Fire Salvage Page 159 Contract 2400-6, (6/06) C6.62# - SITE SPECIFIC WETLANDS PROTECTION MEASURES (07/2001) Measures needed to protect wetlands identified on the Sale Area Map or on the ground include: Equipment will not operate within wetland buffers as identified on the ground and on the Sale Area Map. Wetland buffers are identified on the ground with BLUE and WHITE striped flagging and one painted ORANGE dot at DBH facing into the unit as described in C2.35# Designation of Timber, Cutting Unit Boundaries, and Subdivision/Payment Unit Boundaries (06/2012). Unit boundaries located adjacent to identified wetlands will serve as the limits of the Wetlands Protection Buffer. Included timber shall be directionally felled away from wetland. C6.7# - SLASH TREATMENT (08/2006) Purchaser shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Purchaser shall be in accordance with the following slash plan and specifications, and the Sale Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Purchaser for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Purchaser's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Purchaser for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Purchaser shall jointly develop a schedule for completion of slash treatment on the various portions of Sale Area prior to Purchaser's Operations. Removing may be substituted for treatment of any other specified method. By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be treated by the other(s). See the slash treatment specification table below. See Table A. Sale Name: Hog Fire Salvage Page 160 Contract 2400-6,(6/06) SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by using the following symbols: Slash Treatment MethodsMethods Symbol Method Definition DECK "Decking" large material Logging Slash 14 inches or larger in large end d.o.b. and 10 feet or more in length shall be Decked for disposal by Forest Service by piling pieces parallel to each other. MACH “Machine Piling” Concentrations of Logging Slash, excluding scattered individual pieces, shall be Machine Piled by tractor equipped with brush rake for disposal by Forest Service.

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 CT6.5 and B6.6 BT6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6Specifications Pursuant to CT6.6# - EROSION PREVENTION AND CONTROL. Erosion Prevention and Control Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. Scarification N/A Backblading N/A Tillage N/A SPECIFICATIONS PURSUANT TO C6.7In addition to meeting the requirements of BT6.64, unless otherwise agreed in writing, tillage shall be required on the areas listed in the following table. SAMPLE Tillage shall be accomplished by equipment that will lift and fracture the soil by vertical and lateral shattering, leaving soil loosened through the full width and depth of the compacted layer with the topsoil remaining substantially in place rather than being inverted. Tillage depth is shown in the following table. Agreement in writing may be made to a lesser depth if rocks or other limiting site conditions are encountered. Tillage shall be limited to periods when soil dryness will result in crumbled soil, avoiding the formation of large clods. Purchaser and Forest Service shall agree in writing on the timing of completion of such work to coordinate with desirable soil moisture conditions. Areas to Till Tillage Depth (Inches) Maximum Acres to Treat Main Skid Roads and Tractor Roads designated by Forest Service 16 5 Temporary Roads 16 4 CT6.7# - SLASH TREATMENT (8/2006) Purchaser shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Purchaser shall be in accordance with the following slash plan and specifications, and the Sale Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Purchaser for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Purchaser's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Purchaser for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Purchaser shall jointly develop a schedule for completion of slash treatment on the various portions of Sale Area prior to Purchaser's Operations. SAMPLE Removing may be substituted for treatment of any other specified method. By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be treated by the other(s). See the slash treatment specification table below. Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment MethodsMethods Symbol Method Definition Buck-L “Bucking Large Logging Slash” Tops and limbs over 4 inches diameter outside bark (d.o.b.), not to be otherwise treated, shall be bucked into lengths not to exceed 6 feet, unless agreed otherwise. Buck-P "Bucking and Piling" Logging Slash smaller than N/A inches and larger than 4 inches in large end d.o.b. shall be bucked into lengths not to exceed N/A feet and left in place. Logging Slash 4 inches and smaller in large end d.o.b. shall be hand Piled within Required Disposal Strip for Forest Service disposal. Xxxx "Burying" Logging Slash shall be buried where agreed in borrow areas, pits, trenches, or other locations reasonably near the area of origin. Logging Slash shall be matted down in layers and shall be covered with at least 2 feet of rock and soil so that the final surface is sloped to drain and relatively smooth. Chip "Chipping" Chippable Logging Slash up to 4 inches in

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A In addition to meeting the requirements of B6.63 and B6.64, Purchaser shall scarify the following areas; unless otherwise agreed: (a) Traveled Way of National Forest System roads used by Purchaser and listed in the legend of Sale Area Map. (b) Roadbeds of any Temporary Roads used for log hauling by Purchaser. (c) Landings or portions thereof located outside Roadbed limits of National Forest System roads not designated for scarification. Scarification shall be to a depth of 6 inches, with intervals between striations not to exceed l2 inches, unless otherwise agreed. Backblading N/A Within recreation development sites and public use areas designated on Sale Area Map, Purchaser shall, at Forest Service request, backblade skid trails in lieu of cross ditching. Tillage N/A In addition to meeting the requirements of B6.64, unless otherwise agreed in writing, tillage shall be required on the areas listed in the following table. Tillage shall be accomplished by equipment that will lift and fracture the soil by vertical and lateral shattering, leaving soil loosened through the full width and depth of the compacted layer with the topsoil remaining substantially in place rather than being inverted. Tillage depth is shown in the following table. Agreement in writing may be made to a lesser depth if rocks or other limiting site conditions are encountered. SAMPLE Tillage shall be limited to periods when soil dryness will result in crumbled soil, avoiding the formation of large clods. Purchaser and Forest Service shall agree in writing on the timing of completion of such work to coordinate with desirable soil moisture conditions. Areas to Till Tillage Depth (Inches) Maximum Acres to Treat Landings 18” 24 Main Skid Roads and Tractor Roads designated by Forest Service 18” 8 Temporary Roads 18” 5 C6.7# - SLASH TREATMENT (12/2006) Contractor shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Contractor shall be in accordance with the following slash plan and specifications, and the Contract Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Contractor for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Contractor's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Contractor for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Contractor shall jointly develop a schedule for completion of slash treatment on the various portions of Project Area prior to Contractor's Operations. Removing may be substituted for treatment of any other specified method. SAMPLE By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be treated by the other(s). See the slash treatment specification table below. See Table A. SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods shall be shown on Sale Area Map or listed in the following tables by the following symbols: Slash Treatment MethodsSAMPLE

Appears in 1 contract

Samples: www.fs.usda.gov

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Purchaser's Operations due to causes beyond Purchaser's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Purchaser's Operations due to failure to perform required work shall be repaired by Purchaser. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Table A Vegetative Soil Stabilization N/A Special Erosion Prevention Measures Purchaser shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. Scarification N/A Backblading Backbladding N/A Tillage N/A SPECIFICATIONS PURSUANT TO Sale Name: Hog Fire Salvage Reoffer Page 157 Contract 2400-6, (6/06) C6.62# - SITE SPECIFIC WETLANDS PROTECTION MEASURES (07/2001) Measures needed to protect wetlands identified on the Sale Area Map or on the ground include: Equipment will not operate within wetland buffers as identified on the ground and on the Sale Area Map. Wetland buffers are identified on the ground with BLUE and WHITE striped flagging and one painted ORANGE dot at DBH facing into the unit as described in C2.35# Designation of Timber, Cutting Unit Boundaries, and Subdivision/Payment Unit Boundaries (06/2012). Unit boundaries located adjacent to identified wetlands will serve as the limits of the Wetlands Protection Buffer. Included timber shall be directionally felled away from wetland. C6.7# - SLASH TREATMENT (8/200608/2006) Purchaser shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Purchaser shall be in accordance with the following slash plan and specifications, and the Sale Area Map. All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Purchaser for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications. Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Purchaser's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Purchaser for treatment of Logging Slash are set forth below unless otherwise agreed in writing. Forest Service and Purchaser shall jointly develop a schedule for completion of slash treatment on the various portions of Sale Area prior to Purchaser's Operations. Removing may be substituted for treatment of any other specified method. By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be shown on Sale Area Map or listed in the following tables treated by the following symbols: Slash Treatment Methodsother(s). See the slash treatment specification table below. See Table A.

Appears in 1 contract

Samples: Service Timber Sale Contract

Erosion Prevention and Control. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by C6.5 and B6.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in PurchaserContractor's Operations due to causes beyond PurchaserContractor's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from PurchaserContractor's Operations due to failure to perform required work shall be repaired by PurchaserContractor. Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free. Additional erosion control requirements of this contract are listed in the following table. SAMPLE SPECIFICATIONS PURSUANT TO C6.6# - EROSION PREVENTION AND CONTROL. Vegetative Soil Stabilization Where soil has been disturbed by Contractor's Operations and the establishment of vegetation is needed to minimize erosion, Contractor shall take appropriate measures normally used to establish an adequate cover of grass or other vegetation acceptable to Forest Service or take other agreed stabilization measures. Forest Service shall designate on the ground such disturbed areas annually as logging and Temporary Road construction are completed. Forest Service upon request shall provide advice as to soil preparation and the application of suitable seed mixtures, mulch and fertilizer and the timing of such work. In no event shall Contractor be required to treat more acres than that shown in the legend of Contract Area Map. Contractor shall use the type of native seed mixtures, mulch, and fertilizer as listed below: Seed Mix Pounds/Acre Type of Mulch Fertilizer N/A * S A M P L E * Special Erosion Prevention Measures Purchaser Contractor shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Purchaser be required to treat more acres than that shown in the legend of Sale Contract Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above. Soil Scarification. N/A Backblading N/A Tillage N/A SPECIFICATIONS PURSUANT TO C6.7# - SLASH TREATMENT (8/2006) Specified slash treatment methods In addition to meeting the requirements of B6.63 and B6.64, Contractor shall be shown on Sale Area Map or listed in scarify the following tables by the following symbols: Slash Treatment Methodsareas, unless otherwise agreed:

Appears in 1 contract

Samples: www.fs.usda.gov