Environmental Commitments. The Final IA EIS describes the impacts of the Federal action on the Colorado River, such as changes in flow and reservoir storage. The Final IA EIS also summarizes and incorporates by reference analyses of off-river impacts that would result from actions taken by the QSA participating agencies as a result of implementing the QSA. This is because the changes in water deliveries agreed to by the Secretary in the Water Delivery Agreement will enable the QSA to be fully implemented. It is important to recognize that while the EIS describes the off-river impacts of actions taken by the QSA participating agencies, it does not ‘‘federalize’’ those actions, nor does it create a requirement for supplemental NEPA compliance for those actions. The Department recognizes that the non-Federal actions carried out by the participating California agencies pursuant to the QSA will need to comply with the California Environmental Quality Act (CEQA), California Endangered Species Act, and other State and local requirements. Toward that end, the California participating agencies prepared a Programmatic Environmental Impact Report (PEIR) for the QSA (Implementation of the Colorado River Quantification Settlement Agreement, June 2002), CVWD prepared a PEIR for the Coachella Valley Water Management Plan (Coachella Valley Water Management Plan and State Water Project Entitlement Transfer PEIR, October 2002), and an EIR/EIS was prepared for the IID Water Conservation and Transfer Project, October 2002, pursuant to these State and local requirements.12 The following environmental commitments are those relating to the proposed Federal action affecting water diversions and reservoir storage. Based on the impact analysis, mitigation measures were determined not to be necessary, and none are proposed, for land use, recreation, agricultural resources, socioeconomics, environmental justice, or transboundary impacts. Implementation of environmental commitments from the CEQA documents relating to actions taken by the QSA parties is the exclusive responsibility of those California parties.
AutoNDA by SimpleDocs
Environmental Commitments. Any work in a wetland area within INDOT’s right of way or in borrow/waste areas is prohibited unless specifically allowed in the US Army Corps of Engineers or IDEM permit. (Required) If any archaeological artifacts or human remains are uncovered during construction, federal law and regulations (16 USC 470, et seq.; 36 CFR 800.11, et al.) and State Law (IC 14-21-1) require that work must stop immediately and that the discovery must be reported to the Division of Historic Preservation and Archaeology in the Indiana Department of Natural Resources within 2 business days. INDOT’s Cultural Resources Section in Environmental Services shall also be notified. (Required) If any potential hazardous materials are discovered the IDEM Spill Line should be notified with details of the discovery within 24 hours. INDOT Environmental Services, Hazardous Materials Unit should then be contacted to organize the proper handling of the material to be in accordance with the IDEM guidelines. (Required) Permits may be required for this project. It will be the responsibility of the designer to submit plans to ES to process permits. (Required) If unexpected karst features are discovered during construction, work shall cease immediately in the affected area and ES will be contacted. ES will coordinate with USFWS to determine appropriate protective measures. (Call ES Xxxxxx Xxxx – 317-232-0240) (INDOT – Required) Erosion control measures will be taken as if this project had a Rule 5 Erosion Control Permit. (Required) Categorical Exclusion Level 1Form Project: LA Code 3097, Parcel 16 – Excess Land Des No: 926136A Categorical Exclusion Level Thresholds Xxxxx 0 Xxxxx 0 Xxxxx 0 Xxxxx 0 Xxxxxxxxxxx Xxxx ≤ 2 > 2 > 10 Right of way1 < 0.5 acres < 10 acres ≥ 10 acres ≥ 10 acres Length of added through lane None < 1 miles ≥ 1 mile ≥ 1 mile Permanent Traffic pattern alteration None None Yes Yes New alignment None None < 0 xxxx ≥ 0 xxxx0 Xxxxxxxx < 0.1 acres < 1 acre < 1 acre ≥ 1 acre Stream Impacts ≤ 300 linear feet of stream impacts, no work beyond 75 feet from pavement > 300 linear feet impacts, or work beyond 75 feet from pavement N/A N/A Section 4(f)* None None None Any impacts Section 6(f) None None Any impacts Any impacts Section 106No Historic Properties Affected” or falls within guidelines of Minor Projects PA “No Adverse Effect” or “Adverse Effect” N/A If ACHP involved Noise Analysis Required No No Yes3 Yes3 Threatened/Endangered Species* “Not likely to Adversely Affect”, or Falls wit...
Environmental Commitments. List each environmental commitment made for the project, indicating the entity responsible for ensuring successful implementation. CLASSIFICATION DETERMINATION The proposed action qualifies for a Programmatic Categorical Exclusion. The proposed action does not qualify for a Programmatic Categorical Exclusion. Prepared by: Name: Title: Date Approval Recommended By: Section Chief NHDOT Bureau of Environment Date Approved by: Administrator NHDOT Bureau of Environment Date For use by the Approver of this Programmatic Categorical Exclusion The proposed action includes construction in floodplains. Pursuant to Executive Order 11988, this project includes use of the Programmatic Flood Plains Finding for Categorical Exclusions dated April 21, 2003. The proposed action includes construction in wetlands. Pursuant to Executive Order 11990, and US Department of Transportation Order 5660.1A, this project includes use of the Programmatic Wetlands Finding for Categorical Exclusions dated September 13, 2001. The proposed action includes a de minimis Section 4(f) finding. The proposed action includes a programmatic Section 4(f) evaluation. State of New Hampshire – Department of Transportation
Environmental Commitments. The following Provisions summarize the requirements, in addition to those required elsewhere in the Contract, imposed upon the Contracting Agency by the various documents referenced in the Special Provision Permits and Licenses. Throughout the work, the Contractor shall comply with the following requirements: (August 3, 2009) A mixing zone is established within which the turbidity standard is waived during actual in-water work. The mixing zone is established to only temporarily allow exceeding the turbidity criteria (such as a few hours or days) and is not authorization to exceed the turbidity standard for the entire duration of the construction. The mixing zone shall not exceed *** 300 *** feet downstream from the construction area. (February 25, 2013) Any temporary fills placed must be removed in their entirety and the affected areas returned to their pre-construction elevation. (August 3, 2009) The Contractor shall dispose of all creosoted timber, creosote piling and associated debris as shown in the Plans in accordance with current federal, state, and local regulations and provisions, and following Best Management Practices. Disposal shall be made in a landfill which meets the liner and leachate standards of the Minimum Functional Standards, Chapter 173-304 WAC. The Contractor shall provide receipts from the disposal facility to the Project Engineer. If the material is transported to a transfer station, the Contractor shall obtain documentation indicating that final disposal will comply with the standards referenced above. (August 3, 2009)
Environmental Commitments. Consultant shall address this category of the CATEX if any environmental commitments are needed to avoid, minimize or mitigate any potential impacts to the environment.
Environmental Commitments. To limit potential environmental impacts from development of the School Facilities, the City will determine the timing, sequence, and implementation of the Environmental Commitments.
Environmental Commitments. 3.1 Green Certifications Developer shall comply with the Washington DC Green Building Act of 2006 and obtain at least certified status for buildings development within the Development, when Developer deems it financially feasible, under the Leadership in Energy and Environmental Design Green Building Rating System for New Commercial and Major Renovations (LEED-NC) (Version 2.1) In COMMISSION addition, Developer shall investigate the feasibility of constructing a building within the Development that achieves a higher LEED level than the certified level (i.e., silver, gold or platinum level).
AutoNDA by SimpleDocs
Environmental Commitments. Any additional future use of Project water for M&I purposes beyond the 3,000 af addressed by this EA, including any Minor Uses water totaling greater than the 2,000 af as described in the Contract and any Third-Party Contracts for greater than the initial 1,000 af as described in the Contract, will require additional NEPA and 1920 Act compliance. The District will not take any actions through the Contract which are not in conformance with the NEPA document as determined by Reclamation for the Contract without additional NEPA compliance. Also, any water uses proposed outside of the service area would be subject to additional NEPA and 1920 Act Compliance. If a water lease involves construction of a new diversion facility and/or improvements to an existing diversion facility on the Pine River, there would be potential impacts to historic resources. Those proposed undertakings, once identified, would undergo standard cultural resources review under applicable laws and policies. Since the area(s) of potential impact are rather small, it is anticipated impacts will be avoided or minimized in the event that historic properties are identified. The review would be limited to the diversion facility itself because, as stated earlier, neither distribution of water nor approval of water use is a part of the Proposed Alternative.
Environmental Commitments. As part of the Settlement Agreement, ------------------------- Seller has made certain environmental commitments regarding the operation of the Facilities. Such commitments are described in Attachment 6 of the Settlement Agreement, and a copy is attached hereto as Schedule 11.3 (the ------------- "Environmental Commitments"). Buyer agrees to comply with such Environmental Commitments in accordance with their terms, to the extent applicable to the Facilities. Buyer acknowledges that the performance of the Environmental Commitments is a condition of the Settlement Agreement. The Parties agree that Buyer's obligation with respect to the Environmental Commitments shall survive the Closing, and shall be specifically enforceable by Seller to the extent that such Environmental Commitments have not been superseded by other laws and so long as such Environmental Commitments remain enforceable against Seller or Buyer by relevant Governmental Authorities.
Environmental Commitments. 1. This project is located in a public drinking water source. In order to minimize the potential for a release in this sensitive area do not perform equipment fueling within the project limits. If refueling of immobile equipment is necessary within these limits, provide secondary containment with enough capacity to completely contain and collect all potential liquid wastes in the event of a spill. Do not perform maintenance activities associated with any viscous material that has potential to contaminate the groundwater. All equipment or liquid containers shall be regularly checked for leaks prior to entering the restricted areas. The contractor shall develop a Spill Prevention Control and Countermeasure Plan (SPCC) if refueling or maintenance will be performed within the project limits. If any refueling or maintenance will be performed outside of the project limits, the area shall be assessed for potential groundwater contamination and be indicated on the Spill Prevention Control and Countermeasures Plan. The Contractor shall immediately take steps to mitigate any event, such as a spill of fuels, oils, or chemicals. Any such spill or event shall be reported immediately to the emergency contact listed below for each drinking water source. If the spill is a reportable amount, the Contractor should contact Xxxxx County Emergency Management (419-592-4876) and Ohio EPA Environmental Response and Revitalization (000-000-0000 or 800-282-9378) for cleanup of the spill.