Emission control equipment Sample Clauses

Emission control equipment. 5.1.1.1. The components liable to affect, where appropriate, the emission of gaseous and particulate pollutants from diesel and gas engines shall be so designed, constructed, assembled and installed as to enable the engine, in normal use, to comply with the provisions of this Regulation.
AutoNDA by SimpleDocs
Emission control equipment. 6/1/1999 12/29/2008 [Insert FR page number where document be- gins]. 252:100–23–6 ........... Fugitive dust controls ................. 6/1/1999 12/29/2008 [Insert FR page number where document be- gins].
Emission control equipment. Black Hills will comply with existing EPA rules and any future regulations validly adopted by an authority with appropriate jurisdiction, including regulations that have been or may be adopted by the Southern Ute Indian Tribe.

Related to Emission control equipment

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • School Equipment The Association shall have the right to use audio-visual and/or duplicating equipment provided all costs incurred therewith are paid for by the Association. Association use of school equipment shall not interfere with school use. The building principal must approve any Association use that involves a cost.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Additional Equipment Additional Equipment may from time to time be added as the subject matter of this Agreement as agreed on by the parties. Any additional property will be added in an amendment describing the property, the monthly rental, security deposit, and stipulated loss value of the additional Equipment. All amendments must be in writing and signed by both parties. Other than by this amendment procedure, this Agreement may not be amended, modified, or altered in any manner except in writing signed by both parties.

  • Safe Equipment The City shall furnish and maintain in the best possible working condition, within the limits of its financial capability, the necessary tools, facilities, vehicles, supplies, and equipment required for members to safely carry out their duties. Members are responsible for reporting unsafe conditions or practices, for avoiding negligence, and for properly using and caring for tools, facilities, vehicles, supplies, and equipment provided by the City.

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • Safety Equipment Should the employment duties of an employee in the bargaining unit require use of any equipment or gear to insure the safety of the employee or others, the District agrees to furnish such equipment or gear.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • Special Equipment The Employer agrees to provide specialty tools, emergency supplies/equipment, testing equipment and safety equipment as needed to perform required duties as determined and authorized by the Chief or designee. The emergency supplies/equipment will include appropriate survival provisions and equipment for each permanent Maintenance Mechanic 4 and the Law Enforcement Communications Systems Supervisor when they are performing duties that would require such provisions and equipment. When necessary, the employer will replenish used or expired survival provisions and damaged and unusable equipment. All supplies and equipment will be returned to the employer when the employee is no longer performing the duties that would require the survival provisions and/or equipment.

Time is Money Join Law Insider Premium to draft better contracts faster.