EMA REVIEW SCORING Sample Clauses

EMA REVIEW SCORING. 5.1 The Authority shall provide to the Franchisee, no later than ten (10) days following the EMA Review Meeting, a duly completed EMA Review Scorecard setting out the Franchisee's performance in each of the EMA Criteria for the EMA Performance Period.
AutoNDA by SimpleDocs

Related to EMA REVIEW SCORING

  • Review Stages The Project Architect shall submit documents to the Owner for review at completion of the Schematic Design Phase, Design Development Phase and at the following stages of completion of the Construction Documents Phase as follows: 50%, 75%, 100%

  • Log Reviews All systems processing and/or storing PHI COUNTY discloses to 11 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 12 must have a routine procedure in place to review system logs for unauthorized access.

  • Project Review A. Programmatic Allowances

  • Design Review At appropriate stages of design, documented reviews of the design results shall be planned and conducted. Participants at each Design Review shall include representatives of all functions concerned with the design stage being reviewed, as well as other specialist personnel, as required. Records of such reviews shall be maintained. Any computer software used to perform alternative calculations or verify clearances through the use of scale models or computer-aided design and drafting (CADD) techniques shall be validated before the use of the application, with validation documented in accordance with Section 2.2.15. In addition, at each submittal to IFA for review, Developer shall provide hand calculations that validate any calculations performed by computer software.

  • Validation Review In the event OIG has reason to believe that: (a) Good Shepherd’s Claims Review fails to conform to the requirements of this CIA; or (b) the IRO’s findings or Claims Review results are inaccurate, OIG may, at its sole discretion, conduct its own review to determine whether the Claims Review complied with the requirements of the CIA and/or the findings or Claims Review results are inaccurate (Validation Review). Good Shepherd shall pay for the reasonable cost of any such review performed by OIG or any of its designated agents. Any Validation Review of Reports submitted as part of Good Shepherd’s final Annual Report shall be initiated no later than one year after Good Shepherd’s final submission (as described in Section II) is received by OIG. Prior to initiating a Validation Review, OIG shall notify Good Shepherd of its intent to do so and provide a written explanation of why OIG believes such a review is necessary. To resolve any concerns raised by OIG, Good Shepherd may request a meeting with OIG to: (a) discuss the results of any Claims Review submissions or findings; (b) present any additional information to clarify the results of the Claims Review or to correct the inaccuracy of the Claims Review; and/or (c) propose alternatives to the proposed Validation Review. Good Shepherd agrees to provide any additional information as may be requested by OIG under this Section III.D.3 in an expedited manner. OIG will attempt in good faith to resolve any Claims Review issues with Good Shepherd prior to conducting a Validation Review. However, the final determination as to whether or not to proceed with a Validation Review shall be made at the sole discretion of OIG.

  • Review Protocol A narrative description of how the Claims Review was conducted and what was evaluated.

  • Systems Review The Construction Administrator will conduct reviews of proposed roof, structural, mechanical, electrical, plumbing, conveyance, sprinkler, telecommunications, and life safety systems, and will consider initial cost, availability, impact on the overall program, comfort and convenience, long-term maintenance and operating costs, and impacts on schedule.

  • ADB’s Review of Procurement Decisions 9. All contracts procured under international competitive bidding procedures and contracts for consulting services shall be subject to prior review by ADB, unless otherwise agreed between the Borrower and ADB and set forth in the Procurement Plan. SCHEDULE 5

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • Readiness Review Includes all plans to be implemented in one or more Service Areas on the anticipated Operational Start Date. At a minimum, the HMO shall, for each HMO Program:

Time is Money Join Law Insider Premium to draft better contracts faster.