Electrical Work Methods Sample Clauses

Electrical Work Methods. 1. Jumpers of any type shall not be used to keep transformers, Risers or transformer banks, energized for the purpose of changing potted porcelain cutouts. Refer to most current version of National Grid Electric Operation Procedure (EOP) D001 “Porcelain Fuse Cutout - Open Type.” Potted porcelain cutouts must be changed out when work is being completed on a pole even if this is not planed in the scope of the work provided. Properly rated and inspected slings, chains or tongs will be utilized to move poles and equipment. Winch lines must not be wrapped around poles or looped around transformers ears to lift without a sling or chain.
AutoNDA by SimpleDocs

Related to Electrical Work Methods

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Standard Work Week The standard work week shall be thirty-five (35) hours and is composed of five (5) consecutive standard work days.

  • Standard Workweek Except as noted below the standard workweek for full-time employees consists of five (5) consecutive eight (8) hour days, Monday through Friday each week. Non-overtime hours and starting and quitting times for such employees shall be the same throughout the standard workweek. The standard workweek does not apply to the following:

  • Building Services Labor Law Article 9 applies to Contracts for building service work over $1,500 with a public agency, that: (i) involve the care or maintenance of an existing building, or (ii) involve the transportation of office furniture or equipment to or from such building, or (iii) involve the transportation and delivery of fossil fuel to such building, and (iv) the principal purpose of which is to furnish services through use of building service employees.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

  • Installations 2.1. This test shall be conducted with either the complete REESS or with a related REESS subsystem(s) including the cells and their electrical connections. If the manufacturer chooses to test with related subsystem(s), the manufacturer shall demonstrate that the test result can reasonably represent the performance of the complete REESS with respect to its safety performance under the same conditions. If the electronic management unit for the REESS is not integrated in the casing enclosing the cells, then the electronic management unit may be omitted from installation on the Tested-Device if so requested by the manufacturer.

  • Electrical Installations 3.1 Wiring and accessories for lighting of Common Areas.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Janitorial Services Tenant will not employ any person for the purpose of cleaning the Premises or permit any person to enter the Building for such purpose other than Landlord's janitorial service, except with Landlord's prior written consent. Tenant will not necessitate, and will be liable for the cost of, any undue amount of janitorial labor by reason of Tenant's carelessness in or indifference to the preservation of good order and cleanliness in the Premises. Janitorial service will not be furnished to areas in the Premises on nights when such areas are occupied after 9:30 p.m., unless such service is extended by written agreement to a later hour in specifically designated areas of the Premises.

Time is Money Join Law Insider Premium to draft better contracts faster.