Editor’s Note Sample Clauses

Editor’s Note. Project Manager confirm with institution on the media and quantities for record documents.
AutoNDA by SimpleDocs
Editor’s Note. Project Manager please select appropriate services to be added to or subtracted from this list. Also, refer to Art. 14.2.8 and 14.4 and select any appropriate services which should be added to this list as a Basic Service. (i.e. a laboratory consultant for a Lab building or acoustical engineer for a Performance Facility) a. Architectural Services b. Landscape Architectural Services c. Civil Engineering Services
Editor’s Note. Project Manager edit as appropriate.
Editor’s Note. Parts of the premises where the tenant does not have a right to occupy exclusively may be identified in a special term.
Editor’s Note. Since 1980, the program and budget of the Union have been biennial.
Editor’s Note. Project Manager please review the list of Special Consultant Services for inclusion in this Article and edit accordingly. Owner provided services: Surveying Services Geotechnical Services Code Check Plan Check Forensic Consultant Construction Auditing Consultant Existing Facility Surveys Integrated Scheduling Testing and Balancing Hazardous Materials Surveying and Abatement Laboratory Testing (Soils, Materials, Environmental, Welding, Steel Construction) Project Commissioning Wind Tunnel/Air Quality Analysis Exhaust Stack Testing Vibration Analysis Radio Frequency Interference Testing
Editor’s Note. Project Manager confirm with institution if reproducible copy is required and delete this requirement if possible. If used with above paragraph include only the bullets below. Upon completion of the project, the Project Architect shall revise the drawings and specifications, to incorporate all Addenda, all Change Orders for the Work and any modifications recorded by the Contractor on the As-Built Drawings maintained at the job site. The Project Architect shall label the revised drawings and specifications as “Record Drawings” and “Record Specifications” and shall deliver copies to the Owner for record purposes, as follows: Reproducible Mylar Film Prints “Record Drawings” – blueline “Record Specifications” – diskettes Editor’s Note: LIFE SAFETY ENGINEERING CONSULTANT: OPTIONAL FOR UT AUSTIN PROJECTS – MAY ALSO BE INCLUDING AS A BASIC SERVICE
AutoNDA by SimpleDocs
Editor’s Note. The 30-month time limit, as in force from April 1, 2002, does not apply in respect of any designated Office which has notified the International Bureau of incompatibility with the national law applied by that Office. The 20-month time limit, as in force until March 31, 2002, continues to apply after that date in respect of any such designated Office for as long as Article 22(1), as modified, continues not to be compatible with the applicable national law. Information received by the International Bureau concerning any such incompatibility is published in the Gazette and on the WIPO website at: xxx.xxxx.xxx/xxx/xx/xxxxx/xxxxxxxxxxxx/xxx_xxxxxx.xxxx.
Editor’s Note. Project Manager please review the list of Special Consultant Services for inclusion in this Article and edit accordingly. Owner provided services: • Surveying ServicesGeotechnical Services • Code Check • Plan Check • Forensic Consultant • Construction Auditing Consultant • Existing Facility Surveys • Integrated Scheduling • Testing and Balancing • Hazardous Materials Surveying and Abatement • Laboratory Testing (Soils, Materials, Environmental, Welding, Steel Construction) • Project Commissioning • Wind Tunnel/Air Quality Analysis • Exhaust Stack Testing • Vibration AnalysisRadio Frequency Interference Testing
Editor’s Note. Table of Contents and Editor's Notes are added for the convenience of the reader; they do not appear in the signed text of the Treaty.
Time is Money Join Law Insider Premium to draft better contracts faster.