Drilling and Sampling Sample Clauses

Drilling and Sampling. 1.1.2.1 Drilling and Sampling with 3-inch, Thin-Walled Tube Sampler, Continuous to 10.0 ft, 5.0-ft Intervals Thereafter........................................................................................ $ 22.00/foot 1.1.2.2 Continuous Drilling and Sampling with 3-inch, Thin-Walled Tube Sampler or Split-Spoon Sampler .............................................................................................................. $ 39.00/foot 1.1.3 Standard Penetration Tests ......................................................................................... $ 27.00/each 1.1.4 TxDOT Cone Penetration Tests.................................................................................. $ 34.00/each
AutoNDA by SimpleDocs
Drilling and Sampling. 1.1.2.1 Drilling and sampling with 3‐inch, thin‐walled tube sampler, continuous to 10.0 ft, 5.0 ft intervals thereafter foot $ 22.00
Drilling and Sampling. 6.1.1 Contractor shall be responsible for blasthole drilling and Owner shall approve the drill and/or sampling system being utilized for sampling.
Drilling and Sampling. This category of service includes subsurface investigations, including drilling and digging test pits. Obtain disturbed and undisturbed samples. Perform field tests such as SPT, Cone Penetration, vane shear, etc. Install and monitor geotechnical monitoring instrumentations, such as piezometer, inclinometer, etc.

Related to Drilling and Sampling

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Environmental, Health and Safety i. Environment, Health and Safety Performance. Seller acknowledges and accepts full and sole responsibility to maintain an environment, health and safety management system ("EMS") appropriate for its business throughout the performance of this Contract. Buyer expects that Seller’s EMS shall promote health and safety, environmental stewardship, and pollution prevention by appropriate source reduction strategies. Seller shall convey the requirement of this clause to its suppliers. Seller shall not deliver goods that contain asbestos mineral fibers.

  • Health and Safety C8.1 The Contractor shall promptly notify the Authority of any health and safety hazards which may arise in connection with the performance of the Contract. The Authority shall promptly notify the Contractor of any health and safety hazards which may exist or arise at the Authority’s Premises and which may affect the Contractor in the performance of the Contract.

  • Environmental, Health and Safety Matters (a) The Company has complied and is in compliance with all Environmental, Health, and Safety Requirements.

  • Production Work The Company may use Outside Entities to perform production work outside the plant and its environs provided the Company demonstrates that it is utilizing plant equipment to the maximum extent consistent with equipment capability and customer requirements and the Company is making necessary capital investments to remain competitive in the steel business and is in compliance with Article Eleven, Section B (Investment Commitment).

  • Environmental, Health and Safety Laws There does not exist any violation by the Borrower or any Subsidiary of any applicable federal, state or local law, rule or regulation or order of any government, governmental department, board, agency or other instrumentality relating to environmental, pollution, health or safety matters which will or threatens to impose a material liability on the Borrower or a Subsidiary or which would require a material expenditure by the Borrower or such Subsidiary to cure. Neither the Borrower nor any Subsidiary has received any notice to the effect that any part of its operations or properties is not in material compliance with any such law, rule, regulation or order or notice that it or its property is the subject of any governmental investigation evaluating whether any remedial action is needed to respond to any release of any toxic or hazardous waste or substance into the environment, the consequences of which non-compliance or remedial action could constitute an Adverse Event.

  • Tests 7.7.1 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any portion of the Work to be inspected, tested or approved, the Contractor shall give the Architect timely notice of its readiness so the Architect may observe such inspection, testing or approval. The Contractor shall bear all costs of such inspections, tests or approvals conducted by public authorities.