District Review of Design Materials Sample Clauses

District Review of Design Materials. 4.4.1 The Design/Builder shall be entitled to proceed with all or a part of the construction phase of the Project upon the District’s review of the design and construction documents, and any subsequent submittals or shop drawings, for conformance with the Contract Documents. If the District modifies or otherwise changes in a material way the Scope of Work called for in the construction documents, subsequent submittals or shop drawings, after such review for conformity, the Design/Builder shall be entitled to a Change Order in accordance with Article 8, Changes in the Work, of this Agreement. In no event shall a Change Order be issued to the extent such modification is due to the fault or neglect of the Design/Builder, or in the event the original submittals were not accompanied by annotations showing nonconformance with the Contract Documents, if any.
AutoNDA by SimpleDocs

Related to District Review of Design Materials

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Release of Design Plan The Engineer (1) will not release any roadway design plan created or collected under this contract except to its subproviders as necessary to complete the contract; (2) shall include a provision in all subcontracts which acknowledges the State’s ownership of the design plan and prohibits its use for any use other than the project identified in this contract; and (3) is responsible for any improper use of the design plan by its employees, officers, or subproviders, including costs, damages, or other liability resulting from improper use. Neither the Engineer nor any subprovider may charge a fee for the portion of the design plan created by the State.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Research Design The data generated by excavations at the prehistoric site(s) will be used to examine at least three topics: (1) chronology; (2) technology; and (3) subsistence practices. Insights into changing patterns of community organization may also be granted, as may insights into changes in social organization. The data recovered will then be compared to data from other regional sites.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Program Design The County Human Resources Department will operate a Catastrophic Leave Bank which is designed to assist any County employee who has exhausted all paid accruals due to a serious or catastrophic illness, injury, or condition of the employee or family member. The program establishes and maintains a Countywide bank wherein any employee who wishes to contribute may authorize that a portion of his/her accrued vacation, compensatory time, holiday compensatory time or floating holiday be deducted from those account(s) and credited to the Catastrophic Leave Bank. Employees may donate hours either to a specific eligible employee or to the bank. Upon approval, credits from the Catastrophic Leave Bank may be transferred to a requesting employee's sick leave account so that employee may remain in paid status for a longer period of time, thus partially ameliorating the financial impact of the illness, injury, or condition. Catastrophic illness or injury is defined as a critical medical condition, a long-term major physical impairment or disability which manifests itself during employment.