Disable Phase Sample Clauses

Disable Phase. The Mode-1 Disabled phase shall be entered when a frame relay virtual connection to a peer is released. A frame relay virtual connection is released when a signal for PVC inactive is obtained via link management Procedures (e.g. Q.933 Annex A), or a signal for SVC release is obtained via Q.933 call control procedures. N10). If Xxx Xxxxx is exceeded on a handshake completion timer expiry, return to the Disabled state and notify the management entity.
AutoNDA by SimpleDocs

Related to Disable Phase

  • Substantial Completion Date Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 2022.

  • Final Completion Date Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by September 30, 2022.

  • WORK DAY/WORK YEAR 20.4 Program Description Student Days Teacher Days Operational Hours State Preschool Part Day Program 175-180 186 6 First 5 Preschool Part Day Program 175-180 186 6 State Full Day Preschool Program 242-244 230 10 – 10.5 General Child Care/School Age Program 242-244 230 10 – 10.5 Parent Pay Preschool/Child Care Program In accordance with the K-12 teacher work calendar In accordance with the K-12 teacher work calendar 10 Head Start 128 186 3.5

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • Substantial Completion “Substantial Completion” means the stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but, in the Owner’s opinion, the Work has progressed to the point such that all parts of the Work under consideration are fully operational and usable for intended purposes, as evidenced by a Certificate of Substantial Completion approved by the Owner. If a Certificate of Occupancy is required by public authorities having jurisdiction over the Work, said certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall notify Owner’s Designated Representative (sometimes referred to as the “ODR”) and request a determination as to whether the Work or designated portion thereof is substantially complete. If the ODR does not consider the Work substantially complete, the ODR will notify the Contractor giving reasons therefore. Failure on the Owner’s part to list a reason does not alter the responsibility of the Contractor to complete all Work in accordance with the terms of this Agreement. After satisfactorily completing items identified by Owner’s Designated Representative, the Contractor shall then submit another request for the ODR to determine Substantial Completion. If The ODR considers the Work substantially complete, The ODR will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final completion and final payment, shall establish the time within which the Contractor shall finish the punch list, and shall establish responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the Contractor to complete all Work in accordance with the terms and conditions of this Agreement. The certificate of Substantial Completion shall be signed by the Owner and the Contractor to evidence acceptance of the responsibilities assigned to them in such certificate. Substantial Completion (as defined in this agreement) for all stages of the Work shall be achieved on or before the following Substantial Completion date: DATE FOR SUBSTANTIAL COMPLETION: TBD Under no circumstances will the time for Substantial Completion exceed this date without a written amendment to this Agreement. THE TIMES SET FORTH IN THE CONSTRUCTION DOCUMENTS ARE AN ESSENTIAL ELEMENT OF THE AGREEMENT. TIME LIMITS STATED IN THE CONTRACT DOCUMENTS ARE OF THE ESSENCE OF THIS AGREEMENT.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • Continuous, Intermittent, and Reduced Work Schedule Leave All leave granted under this Article shall normally be for a continuous period of time for each incident. An employee shall be permitted to take intermittent leave or work on a reduced schedule to take care of a family member with a serious health condition or for his/her own serious health condition when it is medically necessary. Management may require the employee to transfer temporarily to an available alternative position with equivalent compensation for which the employee is qualified that accommodates recurring periods of leave better than the employee’s regular position. Employees who elect a part-time schedule shall receive prorated compensated time off benefits in accordance with Section 4.110 of the Los Angeles Administrative Code during the duration of their part-time schedule. In accordance with the California Family Rights Act (CFRA), leave for the birth, adoption or xxxxxx care placement of a child of an employee (“bonding” leave) does not have to be taken in one continuous period of time. Under CFRA, the basic minimum duration of bonding leave is two weeks, and on any two occasions an employee is entitled to such bonding leave for a time period of not less than one day but less than two weeks’ duration. Any other form of intermittent leave, or work on a reduced schedule, for the purpose of bonding leave shall only be permitted at the discretion of Management. Bonding leave must be concluded within one year of the birth or placement of the child.

  • Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.

  • Normal Work Day The normal work day shall be eight (8) hours and the normal work week shall be forty (40) hours, Monday through Friday, provided however that nothing herein shall be construed as guaranteeing any EMPLOYEE eight (8) hours of work per day or forty (40) hours per week. A single shift shall consist of eight (8) hours of continuous employment, except for unpaid lunch period, between the hours of 7:00 a.m. and 6:00 p.m.

  • Examination of work before covering up In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Time is Money Join Law Insider Premium to draft better contracts faster.