Diesel generator power backup Sample Clauses

Diesel generator power backup. Provision will be made for the installation of Diesel Generator (“DG”) for power backup to run the basic facilities in the Project. In addition to that, DG back up facility will also be made available for every apartment. The load may be provided for Rs. 30,000/- (Rupees Thirty Thousand only) per KVA plus applicable taxes. The Allottee will be required to pay DG usage charges on the basis of a suitable mechanism as shall be devised by the Promoter /the Association, as the case may be.
AutoNDA by SimpleDocs
Diesel generator power backup. Provision has been made for the installation of Diesel Generator (“DG”) for power backup to run the basic facilities at the Luxury Zone. In addition to that, DG back up facility is also being made available for every apartment. The allocated DG load and charges which will be payable by the Allottee on or before possession of their Apartment is included in the Total Price. In case the Allottee requires additional DG power load in their Apartment, they should indicate their requirement in the Application Form. The extra DG power load shall be allotted upon availability and in multiples of KW@Rs. /- per KW. The Allottees will be required to pay DG usage charges on the basis of a suitable mechanism as shall be devised by the Promoter /the Association, as the case may be.
Diesel generator power backup. Provision has been made for the installation of Diesel Generator (“DG”) for power backup to run the basic facilities at the Project. In addition to that, DG back up facility is also being made available for every apartment. The allocated DG load and charges which will be payable by the Allottee on or before possession of their Apartment is included in the Total Price. The Allottees will be required to pay DG usage charges on the basis of a suitable mechanism as shall be devised by the Promoter /the Association, as the case may be.
Diesel generator power backup. Provision will be made for the installation of Diesel Generator (“DG”) for power backup to run the basic facilities in Common Areas of the Project. In addition to that, DG back up facility will also be made available for every apartment, the minimum load that may be provided are as follows and charges of the same will be payable by all allottees including the Allottee herein on or before taking possession which shall be intimated to the Allottee in due course. Minimum DG Power Back up for Apartment OPTION A OPTION B (AC- 50%) OPTION C (AC- 75%) TYPE Minimum DG Back up required only for Light & Fan Only (80% Diversity) Minimum DG Back up required for Light (80% Diversity) + AC Load (50% Diversity) Minimum DG Back up required for Light (80% Diversity) + AC Load (75% Diversity) Only Light & Fan Light + Fan + AC Light + Fan + AC

Related to Diesel generator power backup

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Energy Resource Interconnection Service (ER Interconnection Service).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!