Developer Incentives for Avoiding Schematic ROW Parcels Sample Clauses

Developer Incentives for Avoiding Schematic ROW Parcels. 34 5.7.1 After the Effective Date, Developer will have the opportunity to benefit, 35 in the form of an additional payment from ADOT, from avoidance of parcels that 36 comprise the Schematic ROW, except for such parcels that Developer received credit 37 against the D&C Price as part of the Proposal. References below to “parcel” or “partial 38 parcel” mean those parcels and partial parcels within the boundaries of the Schematic 39 ROW. References to “avoidance,” “avoid” or “avoided” means that the parcel or partial 40 parcel will not be needed or used for the Project or for Temporary Construction 41 Easements.
AutoNDA by SimpleDocs
Developer Incentives for Avoiding Schematic ROW Parcels. 2 5.7.1 After the Effective Date, Developer will have the opportunity to benefit, 3 in the form of an additional payment from ADOT, from avoidance of parcels that comprise 4 the Schematic ROW, except for (a) such parcels that Developer received credit against 5 the D&C Price as part of the Proposal, and (b) any parcels avoided as a result of the 6 alternative design concepts and ROW plans associated with the alternative design 7 concepts set forth in Exhibit 2-1. References below to “parcel” or “partial parcel” mean 8 those parcels and partial parcels within the boundaries of the Schematic ROW.
Developer Incentives for Avoiding Schematic ROW Parcels. 2 5.7.1 After the Effective Date, Developer will have the opportunity to benefit, 3 in the form of an additional payment from ADOT, from avoidance of parcels that 4 comprise the Schematic ROW, except for such parcels that Developer received credit 5 against the D&C Price as part of the Proposal. References below to “parcel” or “partial 6 parcel” mean those parcels and partial parcels within the boundaries of the Schematic
Developer Incentives for Avoiding Schematic ROW Parcels. 5.7.1 After the Effective Date, Developer will have the opportunity to benefit, in the form of an additional payment from ADOT, from avoidance of parcels that comprise the Schematic ROW, except for such parcels that Developer received credit against the D&C Price as part of the Proposal. References below to “parcel” or “partial parcel” mean those parcels and partial parcels within the boundaries of the Schematic ROW. References to “avoidance,” “avoid” or “avoided” means that the parcel or partial parcel will not be needed or used for the Project or for Temporary Construction Easements.
Developer Incentives for Avoiding Schematic ROW Parcels. 23 5.7.1 After the Effective Date, Developer will have the opportunity to benefit, 24 in the form of an additional payment from ADOT, from the avoidance of parcels that 25 comprise the Schematic ROW. References below to “parcel” or “partial parcel” mean 26 those parcels and partial parcels within the boundaries of the Schematic ROW. 27 References to “avoidance”, “avoid” or “avoided” means that the parcel or partial parcel 28 will not be needed or used for the Project or for Temporary Construction Easements.

Related to Developer Incentives for Avoiding Schematic ROW Parcels

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Alternate Work Sites Employees may be assigned or authorized to report to work at an alternative work site(s) and be paid for the time worked.

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Program Objectives In performing its responsibilities with respect to the management and administration of the Program, each party shall be guided by the following Program objectives:

  • Supplemental JBoss Software Conditions Software Access and Software Maintenance for Supplemental JBoss Software is intended and available for Development Purposes only and for up to 25 users for each 16 Core Band Subscription of Red Hat JBoss Middleware Software that you purchased. If you deploy or use the Supplemental JBoss Software for Production Purposes or for more than 25 users, you agree to purchase the appropriate Software Subscriptions for each Unit that you deploy or use. Red Hat’s Open Source Assurance Program applies only to the Red Hat JBoss Middleware Software Subscription that you purchased (such as Red Hat JBoss Enterprise Application Platform in the example above) and does not apply to Supplemental JBoss Software. JBoss xPaaS Subscriptions (defined below) are not considered Supplemental JBoss Software. Each installation and use of JBoss xPaaS Subscriptions Software for either Development Purposes or Production Purposes is a Unit and requires a paid Software Subscription.

  • Program Objective The objectives of the Department’s grants are to:

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Modified Work/Return to Work Programs The Hospital and the Union recognize the purpose of modified work/return to work programs, is to provide fair and consistent practices for accommodating nurses who have been ill, injured or permanently disabled, to enable their early and safe return to work. The parties undertake to provide safe and meaningful employment for both permanently or temporarily disabled nurses based on the following principles: