Detailed Design Phase Sample Clauses

Detailed Design Phase. The goal of this task is to use the data from Task 2 and develop final drawings and complete permitting for the project. The Recipient shall: • Prepare a System Detailed Design Report to document and describe the overall technical design of the system, its operating parameters and expected performance once it is fully deployed and commissioned. o Develop final equipment specifications. o Complete site survey and soils analysis (if required). o Develop a bill of materials. o Develop final construction drawings for permitting such as piping, electrical, and civil. o Meet with the County and City and submit applications for building permits. o Define and design the grid integration strategy including interconnection of the system components with the utility distribution system. Products: • System Detailed Design Report (D301) TASK 4: SAFETY PLAN The goal of this task is to develop a safety plan and operator training program to ensure that the hydrogen system is designed and operated safely. The Recipient shall: • Prepare a Safety and Training Report that will summarize and document the approaches that will be implemented for this project, as well as key lessons learned, best practice guidance and recommendations for streamlining future hydrogen project deployment. • Identify and apply best practice for design, operation and training that will be developed through stakeholder engagement and in accordance with the United States Department of Energy’s Hydrogen Safety Panel’s Safety Planning for Hydrogen and Fuel Cell Projects. • Conduct a preliminary survey and engage stakeholders. • Develop a safety approach and review with stakeholders. • Implement the safety approach and train operators based on the best practice identified. Products: • Safety and Training Report (D401)
AutoNDA by SimpleDocs
Detailed Design Phase. 14.2.2 The mitigation measures, which are proposed in the EIA to mitigate the landscape and visual impacts, should be embodied into the detailed engineering design, landscape design drawings and contract documents. The Detailed Design should be checked during design stage and before tender stage by a Registered Landscape Architect to ensure that the measures are fully incorporated. Potential conflicts with civil engineering, geotechnical, structural, lighting, signage, drainage and underground utilities and operational requirements should resolved as early as practical. Monitoring of design works against the recommendations of the landscape and visual impact assessments within the EIA should be undertaken when the designs are produced to ensure that they fulfill the intentions of mitigation measures.
Detailed Design Phase. 6.7.21 The Consultants shall, for each Section of works, carry out amongst other tasks the detailed design including the preparation of all necessary design drawings and tender documents as part of the Services under the Detailed Design Phase.
Detailed Design Phase. Services Over a period of approximately eight (8) weeks (longer for renovations), HOF shall perform the following Design Services (Upon CLIENT approval of new Investment Estimate as set forth in Exhibit B): ● Select each item according to design direction, Exhibit B Investment, and floor plan(s). ● Procure written quotes from all trades and vendors. ● Complete selections in accordance with approved inspiration boards and initial selections. ● Finalize the approved floor plan(s) with actual selections. ● Draw relevant elevations of the space. ● Complete any custom piece drawings as needed. ● Presentation preparation to communicate the design. ● Confirm the actual numbers against the Exhibit B Investment. The above Services will culminate in HOF presenting the following deliverables to the CLIENT: A Detailed Design Presentation where HOF will showcase for the CLIENT the summary of the design components, which include: ● Inspiration board(s) ● Floor plan(s), elevation(s), and relevant custom drawings ● Propose each item for CLIENT approval, with all details to confirm orders and the coordinating samples
Detailed Design Phase. Transition and Transformation
Detailed Design Phase. 1. Establish the scope of additional soil investigations, special surveys and tests required for design. Arrange for such work to be done. OWNER shall contract directly with the party performing the soil investigation, special survey and/or tests.
Detailed Design Phase. (Contractor’s Responsibility) • Contractor to arrange and perform a final HAZOP Review in accordance with Gippsland Water Procedure of the final detailed design of the proposed works. • The detailed design HAZOP Review may include relevant contractor, supplier, sub- contractor and designer risk assessments and design verification. • The contractor shall prepare a HAZOP Review Report for inclusion as part of the final design documents. • The contractor shall update the final design documentation to implement the outcomes of the HAZOP Review Report
AutoNDA by SimpleDocs
Detailed Design Phase. 363 The Consultants shall prepare detailed drawings based on the accepted preliminary design submittal, including all agreed upon revisions according to the following numbers and submit them to the Contracting Authority for final review: Deliverable #5: Provide a detailed design submittal that includes the following: Volume I: Updated environmental impact assessment and simulations done at the preliminary design step, detailing environmental impact calculations: energy, GHG, water and waste, calculated for the entire life cycle of the building (construction, use and decomissioning) Volume II: Drawings (architectural, structural, mechanical, and electrical) each set of discipline drawings should be separated from each other & Book of Details for the mentioned divisions. The colour scheme and concept (professionally rendered 3D images) Volume III: Bills of Quantities: (excel sheet) of the priced BOQ. Price analysis report according to the actual labour and materials cost. Volume IV: General and Particular Specifications Volume V: Proposed Construction Program for the project. Volume VI: Booklet of the engineering calculations. The engineering calculation booklet shall at least include the following:
Detailed Design Phase 

Related to Detailed Design Phase

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the "Final Working Drawings" (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work and to obtain all applicable permits (collectively, the "Final Working Drawings") and shall submit the same to Landlord for Landlord's approval. Tenant shall supply Landlord with two (2) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall immediately revise the Final Working Drawings in accordance with such review and any disapproval of Landlord in connection therewith.

  • Repairs and Maintenance It is the responsibility of the Tenant(s) to notify the Landlord immediately of any needed repair or unsafe condition existing around or in the Premises including but not limited to cracks in the foundation, cracks in plaster, moisture in walls and ceiling, buckling sheetrock or siding, or any leaks. If Xxxxxx(s) fails to immediately notify Landlord of visible problems, which result in damage to the unit, then Tenant(s) becomes liable for cost of resultant damage. All repairs necessary to maintain premises shall be done by or under the direction of the Landlord, at the Landlord’s expense, except those caused by negligence or acts of Tenant(s), Tenant’s agents, or invitees, which repairs shall be made at the sole cost of the Tenant(s). Such repairs shall be made to conform to the original condition of the Premises at the time the Tenant(s) took possession. Although the Landlord repairs normal wear and tear items, the adage “you broke it you pay to fix it” applies to the Tenant(s) and it applies during tenancy as well as at the end of tenancy. In addition, if a Tenant(s) calls for maintenance for which no such maintenance is needed (false call), Tenant(s) will be charged for the service call. Any repairs, including labor, material, and parts used, which are the responsibility of the Tenant(s), must be pre-approved in writing by the Landlord. Landlord shall be the sole judge as to what repairs are necessary. Landlord shall have no obligation to repair any defective condition, nor shall any defense or remedy be available to the Tenant(s), where the defective condition complained of was caused by the Tenant, Xxxxxx’s family, invitee, licensee, or other person acting under the control or direction of the Tenant(s), or where the Tenant unreasonably fails to notify the Landlord of the condition or allow the Landlord access to the Premises for purposes of the repair. Before exercising any of the remedies in accordance with the Landlord-Tenant Act, Tenant(s) must be current in rent. Tenant(s) shall be responsible for all broken glass. Tenant(s) shall not paint, re-wallpaper, or otherwise redecorate or make alterations to the Premises without the written consent of the Landlord. If written consent is given, such alterations shall be at the expense of the Tenant(s) and shall become part of the Premises and the Owner’s property upon termination of this Lease and tenancy. Tenant(s) shall not permit any act or thing deemed hazardous by Landlord due to potential risk of fire or which will increase the rate of insurance on said Premises. In case the Premises or surrounding areas shall be damaged by fire, rain, wind, or other cause beyond the control of the Landlord or the Tenant, then the Premises or surrounding areas shall be repaired within a reasonable time at the expense of the Landlord; and in case the damage is so extensive as to render the Premises unfit for human habitation, the rent shall cease until such time as the Premises will be put in repair. In case of total destruction, the rent shall be paid until the time of such destruction and from thenceforth this Lease Agreement shall cease and come to an end. In the event, the damage is caused by the act of the Tenant(s), or someone in or on the Premises by reason of Tenant’s permission or consent, there shall be no reduction of rent and Tenant(s) shall be liable for all costs of repair. Should Landlord notify Tenant(s) of intent to clean, replace carpets or paint the Premises, moving furniture and wall hangings shall be the duty and expense of the Tenant(s). Tenant(s) understands there will be no rent reductions, adjustments, or other compensation due to repairs or interruptions of service except as provided by law.

Time is Money Join Law Insider Premium to draft better contracts faster.