Design Standard Sample Clauses

Design Standard. The System Upgrade Facilities and related facilities to be constructed by TrAILCo (or by Penelec on behalf of TrAILCo), with the exception of the 345 kV Line Loop work, will be designed to meet the following requirements:  FirstEnergy Transmission Planning Criteria  FirstEnergy Requirements for Transmission Connected Facilities  FirstEnergy Transmission System Protection Practices  FirstEnergy Substation Design Standards Manual  Power Circuit Breakers 23 kV through 500 kV (“FE-BKR-1”)  Open Rack Power Capacitors (“FE-CAP-1”)  Liquid Immersed Substation Power & GSU Transformers (“FE-TR-1”) Effective Date: 8/8/2015 - Docket #: ER15-2398-000 - Page 00 XXXXXXXX X – MILESTONES In accordance with Article 5.1 of this Agreement, the following milestone dates shall apply to the designated performance:
AutoNDA by SimpleDocs
Design Standard. The design and construction of the Approved Project will meet or exceed Lehi City standards.
Design Standard. The pedestrian sidewalks and access, landscaping and hardscape features shall be consistent with the Concept Plan the details of which shall be determined during the permitting process for each phase of development.
Design Standard. The design and construction of the Approved Project will meet or exceed Spanish Fork City and AASHTO standards.
Design Standard. The design and construction of the Approved Project will meet or exceed City of Orem design standards.
Design Standard. The heating, ventilation and air conditioning system furnished by Landlord shall be capable of furnishing (i) air conditioning to maintain 76NF. dry bulb and 55 relative humidity with outside conditions of 91NF. dry bulb and 76NF. wet bulb, based upon an occupancy of each area or room of not more than one person per 150 rentable square feet, and a combined lighting and standard electrical load not to exceed 4 xxxxx per rentable square foot; (ii) ventilation introduced at a minimum rate of 0.133 C.F.M. per square foot; and (iii) heating to maintain 72NF. dry bulb when the outside temperature is 14NF. dry bulb and the prevailing wind velocity does not exceed 17 miles per hour. Landlord shall provide HVAC service during Working Hours without any additional charge therefor. Accordingly, Landlord acknowledges and agrees that the submeter(s) which measure Tenant’s Electric Usage will not measure any electricity that is used in order to provide such HVAC services (excluding any supplemental HVAC services) to the Demised Premises.
Design Standard. The design and construction of the Approved Project will meet or exceed Santaquin City and UDOT standards accordingly.
AutoNDA by SimpleDocs

Related to Design Standard

  • Design At no cost to SCE, Seller shall be responsible for:

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • HVAC A. Heating, ventilating and air conditioning equipment will be provided with sufficient capacity to accommodate a maximum population density of one (1) person per one hundred fifty (150) square feet of useable floor area served, and a combined lighting and standard electrical load of 3.0 xxxxx per square foot of useable floor area. In the event Tenant introduces into the Premises personnel or equipment which overloads the system’s ability to adequately perform its proper functions, Landlord shall so notify Tenant in writing and supplementary system(s) may be required and installed by Landlord at Tenant’s expense, if within fifteen (15) days Tenant has not modified its use so as not to cause such overload. Operating criteria of the basic system shall not be less than the following:

Time is Money Join Law Insider Premium to draft better contracts faster.