Design Reports. The design reports are as specified in Appendix 1, as attached and forming part of this Schedule, and shall be amended or supplemented, by the Contractor as required in accordance with Schedule 18 (Technical Requirements) and Schedule 5 (Design and Plan Certification Process and Review Procedure). The detailed reports consist of:
Design Reports. (1) Other Reports: Prepare the following engineering reports/analyses as directed by the MUNICIPALITY: • Pavement Design Report as set forth in the MANUAL • Stormwater Spreadsheets • Design Study Report • Transportation Management Plan, Type 2 • Soil Report
Design Reports. The design reports for each School are as specified in Appendix 1, as attached and forming part of this Schedule, and shall be amended or supplemented, by the Contractor as required in accordance with Schedule 5 (Design and Plan Certification Process and Review Procedure).
Design Reports. A. Contract 1 –
Design Reports a. Architect/ATP (By Scope) Report: Purpose is to communicate to the architect the key information that initiates site investigation report, space plan and construction documents. Report is generated available on the Web Site and can be printed to a hard copy. All key information for a single project along with special instructions, contacts, etc.
Design Reports. The following Design reports shall be submitted:
Design Reports. (1) Other Reports: Prepare the following engineering reports/analyses as directed by the MUNICIPALITY: Abbreviated Pavement Design Report as set forth in the MANUAL Abbreviated Design Study Report Structure Survey/Hydraulic Report Transportation Management Plan, Type 1 Geotechnical Report B. ENVIRONMENTAL DOCUMENTATION Execute a disclosure statement as required by 40 CFR 1506.5(c). Prepare a Categorical Exclusion Checklist (CEC) Environmental document for the PROJECT as specified in the MANUAL and Chapter TRANS 400, Wisconsin Administrative Code. Furnish the required number to the MUNICIPALITY for approval. Prepare an environmental document that evaluates reasonable alternatives to the PROJECT and consider other reasonable actions or activities that may achieve the same or similar goals of the proposed highway PROJECT, including other or additional transportation alternatives and intermodal opportunities and the alternative of taking no action. Evaluate alternative courses of action based upon a balanced consideration of the environment, public comments, and the need for safe and efficient transportation consistent with local, state, and national environmental goals. Prepare environmental documents that are concise and emphasize significant environmental issues and plausible alternatives. Comply with requirements specified in the MANUAL and TRANS 400, Wisconsin Administrative Code. In the event of a conflict between the MANUAL and TRANS 400, Wisconsin Administrative Code, the administrative rule supersedes.