DESIGN PROCEDURES Sample Clauses

DESIGN PROCEDURES. The Contractor is responsible for the design of all temporary works required for the construction of the permanent works. This will be in accordance with the Employers Agents written Instruction. PROVINCE OF THE EASTERN CAPE DEPARTMENT OF TRANSPORT TENDER NO. SCMU10 21/22-0033 A-F FRAME WORK AGREEMENT FOR REPAIRS TO ROAD SIGNS AND ROAD MARKINGS ON PROVINCIAL ROADS IN THE EASTERN CAPE FOR A PERIOD OF 36 MONTHS – SIX PROJECTS C3.3 : PROCUREMENT )
AutoNDA by SimpleDocs
DESIGN PROCEDURES. SEEHOA aims to maintain a high standard of landscape design. The following procedure for the design and creation of gardens must be strictly adhered to. This will safeguard the interests of the homeowners and entrench the above principles.
DESIGN PROCEDURES. The Contractor is responsible for the design of all temporary works required for the construction of the permanent works. This includes, inter alia, temporary access roads, trench shoring, dewatering and temporary support systems. PROVINCE OF THE EASTERN CAPE DEPARTMENT OF TRANSPORT TENDER NO. SCMU10-19/20-0036D FRAMEWORK AGREEMENTS FOR AD HOC ROUTINE MAINTENANCE WORKS TO VARIOUS PROVINCIAL ROADS IN THE OR TAMBO DISTRICT OVER A PERIOD OF 3 YEARS (TWO PER LMA – 10 APPOINTMENTS) C3.3 : PROCUREMENT
DESIGN PROCEDURES. Asphalt mixes to be designed in co-ordination with an approved (by the Employer’s Agent) specialist professional asphalt design engineer and laboratory and submitted to the Employer’s Agent for approval. The design laboratory and specialist asphalt design engineer shall be paid under a Provisional Sum item provided in the Bill of Quantities. Fundamental design principals and methods (see applicable XXXXXX, and other applicable institutions, manuals and guidelines) to be utilized to ensure optimal mixes in accordance with the specified performance criteria.
DESIGN PROCEDURES. For all Superpave and 4.75 mm mixes, ensure conformance with the Superpave System for Volumetric Design (AASHTO T 312 and AASHTO R30), as adapted in SOP-2. Ensure Superpave mixes are designed at a design gyration number (Ndes) of 65 gyrations and initial gyration number (Nini) of 6 gyrations. Ensure 4.75 mm mixes, (Ndes) are designed at 50 gyrations, and (Nini) at 6 gyrations. Open-graded mix designs will be designed by the Department in accordance with GDT 114. In all cases, the procedure for measuring Maximum Specific Gravity (Gmm) is AASHTO T 209. In addition to gradation and volumetric analysis, ensure mix designs include the following performance tests, as applicable.
DESIGN PROCEDURES. Manual 1 of the TDGs and the Concessionaire Development Standards govern the procedures and requirements regarding design, including design process and schedule, submittal requirements, review and approval process, design modifications, and project coordination. As soon as practical, Concessionaire shall attend a pre-design meeting with the Airport’s concessions management team. Thereafter, on or before the Preliminary Design Due Date, Concessionaire shall prepare and submit for the City’s review the preliminary design package (“DRC Package”). The DRC Package consists of three (3) photo quality renderings that clearly depict the proposed design concept in context with the surrounding area. The renderings depict the space approximately six feet (6’) beyond the demising walls and include merchandising on the shelves and people in the space. In addition, one material sample board, floor plan, and reflected ceiling plan are necessary to provide a complete understanding of the space. An electronic copy of the fully complete plans and specifications for all work, facilities, improvements, and a schedule of the time required to complete same shall be submitted to the Designated Project Manager for review and written approval. A copy of the plans and specifications shall be separately submitted to the City's Building Inspection Division and Fire Department. Prior to submission of DRC Package, Concessionaire should carefully review the Tenant Design Guidelines and DIA Concession Design Standards. The City reserves the right to promptly reject any submission that is not in material compliance with the foregoing. The City shall have two weeks to review and return comments or approve the DRC Package and notify Concessionaire of such approval. Any additional time taken by the City in excess of the two week DRC Package approval time shall be added to certain dates as provided in Section 6.02 of the Concession Agreement. The City shall have two weeks to review each DRC Package submitted or resubmitted by Concessionaire.. Once DRC Package is approved, Concessionaire may move forward with the design for the Concession Space in accordance with the TDGs. The design shall include all Concessionaire finish requirements, including lighting, power, plumbing, HVAC distribution from the main air supply, HVAC controls for the tie in to the base building system, supplemental HVAC if needed, life safety systems, interior finishes, all furnishings, fixtures, trade fixtures, equipment,...
AutoNDA by SimpleDocs
DESIGN PROCEDURES. All designs and modifications thereto shall be communicated in writing and the contractor and engineer shall maintain master lists to record and track all transactions. C3.3 PROCUREMENT
DESIGN PROCEDURES. Refer to Manual 1 of the DIA Tenant Development Guidelines for procedures and requirements regarding design, including but not limited to design process and schedule, submittal requirements, review and approval process, design modifications and project coordination. Approval of the Manager of Aviation extends to and includes consideration of architectural, structural, mechanical, electrical, specialty systems, site, signage, landscaping and aesthetic matters, and DIA reserves the right to reject any design submitted and to require Tenant to resubmit designs and layout proposals until they meet with the approval of the Manager of Aviation. No substantial changes or alterations shall be made in said drawings or specifications after approval by the Manager of Aviation, and no alterations or improvements shall be made to or upon the Tenant's site without prior approval. Tenant CADD Submittal Requirements: All issue for construction and project record drawings shall be provided by the Tenant to DIA in AutoCAD Rel. 2007 .dwg file format in accordance with DIA CADD standards set forth in Design Standards Manual 1. All design drawings submitted by the Tenant to the DIA shall be provided in the latest release of AutoCAD format in accordance with the DIA's Design Standards Manual. Concession CADD Submittal Requirements: AutoCAD 2007 .dwg format CADD files that match the Tenant’s hardcopy drawings must be submitted via: CD/ROM or DVD/ROM in MS-Windows format. All drawings must represent precision input and follow industry standard CADD practices. The drawings must reflect true design dimensioning and must NOT be graphic representations of the design. All site, civil and utility drawings MUST be produced using units in feet and the DIA Grid Coordinate System. The DIA Project Manager must approve submittal and may require adherence to the requirements set forth in DIA design standards. In addition to the above, Tenant is responsible for coordination with the Denver Building Inspection Division, Zoning, Fire Department, Wastewater Management, Consumer Protection, Health and Hospitals, etc. as may be required to comply with submittal, review and approval requirements in order to obtain all required permits. Prior to the issuance of a Notice to Proceed with Improvements from the Manager of Aviation, the Tenant shall obtain and pay for all approvals, licenses and permits required for the Improvements. Whenever a conflict arises between state or local law, ordinances or reg...

Related to DESIGN PROCEDURES

  • Application Procedures a) An employee applies for a listing on the system-wide registry through the employee’s Human Resources Department by completing the form in Appendix B.

  • Induction Procedures a) The parties to this Agreement acknowledge that it is in the interests of the industry that all new employees and employers on a building project understand their obligations to this Agreement and are introduced to their jobs in a manner which will help them work safely and efficiently.

  • SAFETY PROCEDURES The Contractor shall:

  • Procurement procedures 11.1 The Recipient must secure the best value for money and shall act in a fair, open and non-discriminatory manner in all purchases of goods and services.

  • ESCALATION PROCEDURES 48.1 The Standard Practices outlines the escalation process which may be invoked at any point in the Service Ordering, Provisioning, and Maintenance processes to facilitate rapid and timely resolution of disputes.

  • Notification Procedures To address non-compliance, the receiving Competent Authority would notify the providing Competent Authority pursuant to Article 5 of the IGA. The notification procedures would differ depending upon whether the receiving Competent Authority seeks to address administrative or other minor errors or significant non-compliance.

  • Evaluation Procedures 7.2.1 Evaluation procedures designed to fairly and adequately assess performance of full- time faculty employees shall be established and reviewed annually by the Vice President, after consultation with appropriate faculty groups at divisional/departmental meetings for their recommendations.

  • Election Procedures Each holder of record of shares of Company Common Stock (“Holder”) shall have the right, subject to the limitations set forth in this Article II, to submit an election in accordance with the following procedures:

  • AML/KYC Procedures “AML/KYC Procedures” means the customer due diligence (CDD) procedures of a Reporting Financial Institution pursuant to the anti-money laundering or similar requirements of the jurisdiction concerned to which such Reporting Financial Institution is subject.

  • Selection Procedures In selecting the Loan Assets to be Pledged pursuant to this Agreement, no selection procedures were employed which are intended to be adverse to the interests of the Lenders.