Design Limits Sample Clauses

Design Limits. 7.1 The Company shall install such equipment that shall allow the Company to supply to generate and supply power to the JPS Grid in accordance with the applicable power factor parameters set out in the Generation Code.
AutoNDA by SimpleDocs
Design Limits. F8.1 Developer shall have equipment that will allow it to supply its reactive power (MVARS ) requirements and simultaneously supply capacity and energy to the Utility’s Grid with a power factor of 0.9 lagging.
Design Limits. The operating characteristics of the Facility shall be consistent with the Design Limits set forth in Appendix A unless otherwise mutually agreed by the Parties. Any such agreed upon change must be in writing, signed by both Parties. If the OEM provides written direction for operations that requires a change to the Design Limits, the Parties will negotiate in good faith to modify the Design Limits accordingly.
Design Limits.  RE Supplier shall have equipment that will allow it to supply its reactive power (MVAR’s) requirements and simultaneously supply capacity and energy to the BL&P’s Grid with a power factor of 0.9 lagging.
Design Limits. Developer shall have equipment that will allow it to supply its Reactive Power (MVAR’s) requirements and simultaneously supply capacity and energy to the Utility’s Grid with a power factor of 0.80 lagging. • The Facility shall be able to operate at frequencies between 57.7 and 63 hertz, outside which the Developer shall separate the Facility from the Utility’s Grid. • The voltage at the Interconnection Point shall be maintained at 13,800 volts +/- 5%. Voltage fluctuations may be noticeable as visual lighting variations (flicker) and can damage or disrupt the operation of electronic equipment. IEEE Standard 519 and IEC 61000-3 provide definitions and limits on acceptable levels of voltage fluctuation. Loads or system connections to the Utility’s Grid shall comply with the limits in these standards. • Power quality Design considerations should include applicable standards including, but not limited to IEEE Standards 142, 519, 1100 1159, 1547, and ANSI C84.1. Harmonic distortion has to be compliant with IEC 00000-0-00. • Reactive Power Each entity shall provide for its own Reactive Power requirements, at both leading and lagging Power Factors unless otherwise specified by parties. Utility might require Developer to minimize exchange of Reactive Power with Utility’s system, especially under peak load conditions. This can be accomplished by installing equipment to allow matching of internal supply and demand of Reactive Power. •Developer shall advise Utility of any operating constraints and limits, which may from time to time, apply to the Facility.
Design Limits. The Design Limits for the Dedicated Unit shall be the following:

Related to Design Limits

  • Base Building Work Landlord shall construct the Base Building Work as further set forth on Exhibit 10.03, attached.

  • Additional Work If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.

  • Tenant Improvement Plans Any work proposed by Tenant (the “Tenant Improvements”) shall be subject to Landlord’s reasonable prior approval and shall be subject to the other terms and conditions of this Exhibit C; provided that it will be reasonable for Landlord to withhold its approval or consent (as and when applicable under this Exhibit C) if Landlord’s Mortgagee has not consented to the matter that is the subject of such approval or consent. All architectural, engineering and other design fees shall be paid by Tenant. Tenant shall use its architect, engineers and other design professionals, all of whom shall comply with any applicable licensing or governmental requirements of the City of Seattle and the State of Washington; Tenant’s architect shall be approved by Landlord (“Tenant’s Architect”), which approval shall not be unreasonably withheld, conditioned or delayed. Landlord shall also be entitled to receive a copy of the agreement between Tenant and Tenant’s Architect (the “Architect Agreement”). Tenant shall cause Tenant’s Architect to prepare a draft space plan (the “Space Plan”) for the Tenant Improvements and shall submit the proposed Space Plan to Landlord for the latter’s approval (not to be unreasonably withheld) in a time period to allow Tenant to timely complete its Tenant Improvements under this Lease. Landlord shall deliver to Tenant any written objections, questions or comments of Landlord with regard to the Space Plan within ten (10) business days of receipt; Landlord’s consent thereto shall be deemed given if not denied in writing within said ten (10) business day period. If Landlord denies its approval, it shall specify the reasons for doing so in detail. Tenant shall cause the Space Plan to be revised to address such written comments and shall resubmit said Space Plan to Landlord for approval. Such process shall continue until Landlord has approved the Space Plan. Tenant’s Architect shall then prepare working drawings and specifications for the Tenant Improvements, including architectural, structural, plumbing, mechanical, electrical, and fire protection drawings as required, suitable for permit application (the “Working Drawings”) and shall submit the proposed Working Drawings to Landlord for the latter’s approval in a time period to allow Tenant to timely complete its Tenant Improvements under this Lease. The Space Plan and Working Drawings shall be subject to Landlord’s approval, which Landlord agrees shall not be unreasonably withheld, conditioned, or delayed. Landlord shall not be deemed to have acted unreasonably if it withholds its approval thereof because, in Landlord’s reasonable opinion, the work, as described in any such item: (i) is likely to adversely affect Building Systems, the structure of the Building or the safety of the Building and/or their occupants; (ii) might impair Landlord’s ability to furnish services to Tenant or other tenants in the Building; (iii) would materially increase the cost of operating the Building; (iv) would violate any governmental laws, rules or ordinances (or interpretations thereof); (v) contains or uses hazardous or toxic materials or substances; (vi) would negatively affect the appearance of the Building; (vii) is reasonably likely to adversely affect another tenant’s premises; or (viii) is prohibited by any ground lease affecting the Building or any mortgage, trust deed or other instrument encumbering the Building. Landlord shall deliver to Tenant any written objections, questions or comments of Landlord with regard to the Working Drawings, within ten (10) business days of Landlord’s receipt of the Working Drawings; Landlord’s consent thereto shall be deemed given if not denied in writing within said ten (10) business day period. If Landlord denies its approval, it shall specify the reasons for doing so in detail. Tenant shall cause the Working Drawings to be revised to address such written comments and shall resubmit said Working Drawings to Landlord for approval. Landlord may, when approving the Tenant Improvement Plans, elect to require Tenant to remove any Non-Standard Improvements which are made to the Premises. If Landlord so elects, Tenant shall, at its own cost, restore the Premises to the condition designated by Landlord in its election, before the last day of the Term. Such process shall continue until both parties have approved the Working Drawings. Landlord’s approval of the Space Plan and/or the Working Drawings shall not be deemed any representation or warranty that the same comply with applicable codes.

  • Utility Additions Lessor reserves the right to install new or additional utility facilities throughout the Office Building Project for the benefit of Lessor or Lessee, or any other lessee of the Office Building Project, including, but not by way of limitation, such utilities as plumbing, electrical systems, communication systems, and fire protection and detection systems, so long as such installations do not unreasonably interfere with Lessee's use of the Premises.

  • Excess Utility Use Landlord shall not be required to furnish electrical power that exceeds Tenant’s floor proportionate share of the electrical capacity of the Building floor on which the Premises are located made available for general tenant usage. If Tenant’s requirements for or consumption of electricity exceed the electricity to be provided by Landlord as described in Section 7.1, Landlord shall, at Tenant’s expense, make reasonable efforts to supply such service through the then-existing feeders and risers serving the Building and the Premises, provided the additional use of such feeders and risers caused by Tenant’s excess electrical requirements do not adversely affect Landlord’s ability to provide reasonable electrical service to the balance of the Building (as determined by Landlord in the exercise of its reasonable discretion); and Tenant shall pay to Landlord the cost of such service within 30 days after Landlord has delivered to Tenant an invoice therefor. Landlord may determine the amount of such additional consumption and potential consumption by any verifiable method, including installation of a separate meter in the Premises installed, maintained, and read by Landlord, at Tenant’s expense. Tenant shall not install any electrical equipment requiring special wiring or requiring voltage in excess of 110 volts unless approved in advance by Landlord, which approval shall not be unreasonably withheld. Tenant shall not install any electrical equipment requiring voltage in excess of the prorata capacity available to Tenant as of the date of this Lease unless approved in advance by Landlord, which approval may be withheld in Landlord’s sole discretion. The use of electricity in the Premises shall not exceed the capacity of existing feeders and risers to or wiring in the Premises. Any risers or wiring required to meet Tenant’s excess electrical requirements shall, upon Tenant’s written request, be installed by Landlord, at Tenant’s cost, if, in Landlord’s judgment, the same are necessary and shall not cause permanent damage to the Building or the Premises, cause or create a dangerous or hazardous condition, entail excessive or unreasonable alterations, repairs, or expenses, adversely affect Landlord’s ability to provide reasonable service to the balance of the Building, or interfere with or disturb other tenants of the Building. If Tenant (a) uses machines or equipment in the Premises or (b) operates within the Premises at a density, either of which (1) affects the temperature otherwise maintained by the air conditioning system or (2) otherwise overloads any utility, Landlord may install supplemental air conditioning units or other supplemental equipment in the Premises, and the cost thereof, including the cost of design, installation, operation, use, and maintenance, in each case plus an administrative fee of 15% of such cost, shall be paid by Tenant to Landlord within 30 days after Landlord has delivered to Tenant an invoice therefor. To the extent practicable, and subject to Landlord’s prior written consent, not to be unreasonably withheld, conditioned or delayed, Tenant shall have the right to elect, at Tenant’s sole cost and expense, to separately submeter electricity consumption in the entire Premises or any portion thereof. If Tenant elects, and Landlord approves, separately submetering the any portion of the Premises, Landlord and Tenant shall enter into an amendment to this Lease revising Tenant’s obligations for the payment of Electrical Costs, including separately submetered electricity usage, common area electricity usage, and any portions of the Premises not covered by the separate submeter(s).

  • Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, Title 24 calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow all of Tenant’s Agents to bid on the work and to obtain all applicable permits (collectively, the ‘‘Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned, or delayed. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings, Landlord shall not unreasonably withhold, condition, or delay its approval of the Final Working Drawings. Landlord shall approve or reasonably EXHIBIT A disapprove of the Final Working Drawings within ten (10) business days after Landlord’s receipt thereof. If Landlord reasonably withholds its approval, Landlord shall provide Tenant with the specific reasons therefor.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Maintenance Repairs Utility Installations Trade Fixtures and Alterations 7.1 Lessee's Obligations.

Time is Money Join Law Insider Premium to draft better contracts faster.