Design Costs Sample Clauses

Design Costs. Reasonable costs, other than Labor Costs and Preconstruction Overhead Costs as set forth in this Article, incurred by Design Builder to perform the design services in Section 2, Part 2 for Work directly associated with the Project, normally performed off-site, and resulting in the completion of the Construction Documents, based upon Actual Cost not exceeding in the aggregate the amounts in the Design Builder’s proposal and Completed Cost Matrix, shown as Exhibit E.
AutoNDA by SimpleDocs
Design Costs. Cost of design incurred in connection with a change. Costs to be enumerated using rates for labor as set forth in the rate sheet attached as Exhibit E – Schedule 9.2.8e.
Design Costs. Following the Effective Date of this Agreement and within ten (10) working days of the completion of the Design Budget, the parties will deposit their respective allocations into an escrow account, pursuant to separate escrow instructions to be prepared by Vintage’s Project Manager with approval of the City’s Construction Manager.
Design Costs. Landlord shall be responsible for the cost of design and engineering of the Landlord's Work, to the extent necessary to prepare Landlord's Work Plans sufficient for permitting. Tenant shall be responsible for design and engineering costs resulting from (i) any Tenant details or Tenant's program requirements, other than details necessary to prepare plans sufficient to obtain permits for the Scope of Work described herein; (ii) any Tenant-requested changes or further clarifications to any plans; (iii) any Additional Work; and (iv) any work outside the scope of Landlord's Work, including without limitation plans for design of Tenant's furnishings, equipment, electrical, communications, and computer systems, and integration and connection of the same to Landlord's Work. Tenant shall engage and pay for its own architect, pursuant to Section 2.1 of Exhibit D, for any plans described in clauses (iii) or (iv). SCHEDULE C-1 -------------------------------------------------------------------------------- XXXXX CONSTRUCTION OREGON, INC. Project: Medicalogic Tenant Improvement Architect: ZGF Location: Hillsboro, Oregon Estimator: X. Xxxxxx -------------------------------------------------------------------------------- Description Quantity* Unit Loading Dock Excavation 1 ls Wall Footings 95 lf Dock Ramp Walls 475 sf Dock Leveler Pit 1 ls Dock Ramp Slab 600 sf Guardrails 80 lf Overhead Door - 12' x 9' 1 ea Hollow Metal Doors 1 pr Dock Leveler/Bumpers/Seal 1 ls Area Drain 1 ea Storm Drain Lateral 100 lf Casework (See Allowance per lease) Doors & Relites Prefinished 8'-6" Oak Drs/Timely Frms/HW 79 ea Prefinished 8'-6" Oak Drs/Timely Frms/HW/Pr 3 ea Relites 2' x 8'-6" 25 ea Larger Relites 160 sf Accordian Door and Support 79 xx Xxxxx Gypboard at Exterior Walls 8,766 sf Pluming Chase 952 sf Toilet Room Walls w/ Sound Insulation 6,636 sf Full Height Walls 10,262 sf Office Walls 17,154 sf Column Wraps 73 ea Fascia at Lobby Opening 54 lf Architectural Railing System 85 lf Ceilings Gypboard Ceilings at Toilets/Showers/Kitchen 2,556 sf Ceiling Coves at Toilet Rooms 200 lf Acoustical Ceilings - 2 x 4 Second Look 66,039 sf Sound Insulation on Ceiling @ Office Walls 15,248 sf Painting & Wallcovering Paint Walls - Enamel 64,931 sf Paint Walls & Ceilings - Epoxy 2,556 sf Floorcovering Ceramic Tile Floors at Toilets/Showers 2,332 sf Ceramic Tile Base 444 lf Ceramic Tile Wet Wall 1,776 sf Page 1 of 2 -------------------------------------------------------------------------------- XXXX...
Design Costs. The Design-Builder shall provide design services for the Project as detailed in the Project Proposal. The cost of designing the permitted drawing set shall be included within the purchase of the equipment package, up to a maximum of [set amount of hours] as specified in the Project Proposal.
Design Costs. The County shall be responsible for all costs related to the engineering and design for the County Projects. The Silver Spur Project will include the construction of an east-bound right turn lane, a west-bound left turn lane, an acceleration lane for 000000 XX Xxxxxx XXX Georgetown vehicles turning left from Silver Spur Blvd., and the installation of solar-powered beacons, and illumination and warning signs for intersection safety. The Sun City Project will include the restriping of the median west of the Xxxxxx/Sun City Blvd. intersection to provide for an acceleration lane for vehicles turning left from Sun City Blvd. onto eastbound Xxxxxx Xxxxxx Blvd. and the installation of solar-powered beacons for intersection safety.
Design Costs. 7.7.1 Contractor’s actual payment to Engineer pursuant to Contractor’s contract with Engineer for Engineer’s work on the Project, subject to the separate Guaranteed Maximum Price specified for the work and services provided by the Engineer and specified in Exhibit D. No amount paid by or payable to the Engineer other than the fixed or cost reimbursement price of its subcontract shall be included in the Cost of the Work, unless otherwise approved in writing by Owner.
AutoNDA by SimpleDocs
Design Costs. The School District shall pay the Construction Manager for all design services to complete the project, including, but not limited to the services described in Section 4.2.5 A, paragraphs 1 through 11, inclusive, of this Contract, a fee in the amount of XXX.
Design Costs. All costs associated with the design, engineering, review, and permitting necessary for the development of the Project.
Design Costs. Within 30 days after receipt of an invoice from the City, the District will deliver to the City a check payable to the City for its share of the design costs based upon the percentages specified in Section 3.01 hereinabove. This payment is subject to adjustment as specified in Section 3.03.
Time is Money Join Law Insider Premium to draft better contracts faster.