Design-Builder’s Fee Sample Clauses

Design-Builder’s Fee. The Design-Builder's Fee for the performance of the Work, which shall be stated as a lump sum amount commensurate with the scope of the Component Change Order and paragraph 5 of the Contract.
AutoNDA by SimpleDocs
Design-Builder’s Fee. The proposed GMP Change Order shall include, as a separately identified item, the total Fee for Design-Builder's performance of the Work. The Fee shall be stated as a lump sum amount and shall be not more than the amount shown in Paragraph 5 of the Contract.
Design-Builder’s Fee. Design-Builder's Fee shall be the amount specified in Paragraph 5 of the Contract.
Design-Builder’s Fee. If the Preconstruction Phase Services are being rendered simultaneously with Construction Phase Services, each monthly invoice shall include a pro rata portion of the Design-Builder’s fee based on the preliminary progress schedule and the actual costs of the Construction Overhead Costs actually incurred. As the schedule is adjusted, each subsequent invoice will be adjusted to provide for the allocation of the Fee throughout the life of the Project.
Design-Builder’s Fee. 6.2.1 Design-Builder’s Fee shall be: %. The Fee will be established based on the percentage fee provided by Design-Builder in response to Owner’s request for proposals.
Design-Builder’s Fee. 5.4.1 Design-Builder’s Fee shall be: (Number written out) percent (X.XX%) of the Cost of the Work, as adjusted in accordance with Section 5.4.2 below.
Design-Builder’s Fee. Subject to the GMP Total, “Design-Builder's Fee” shall be [three and one-half percent (3.5%)] of the Cost of the Work, not including any Construction Contingency funds and not including insurance deductibles.
AutoNDA by SimpleDocs
Design-Builder’s Fee. 6.1.1 Design/Builder’s Fee shall be calculated as a percent of the Cost of the Work and not as a fixed fee. The Design/Builder’s Fee shall be of the Cost of the Work, as adjusted in accordance with Section 6.3 below. Following acceptance of the GMP by the Owner in accordance with Section 6.7, Design/Builder’s Fee will be finalized and converted to a lump sum fee.
Design-Builder’s Fee. If the CITY elects to implement a Guaranteed Maximum Price the following fees shall be applied to Costs of Work:
Design-Builder’s Fee. 6.2.1 Design-Builder’s Fee shall be a percentage. The percentage compensation shall be calculated by multiplying _________ percent (_____%) times the Cost of the Work, as defined below, and will be established upon approval of the GMP. Design-Builder’s Fee will be adjusted as follows for any changes in the Design Services or Construction Work:
Time is Money Join Law Insider Premium to draft better contracts faster.