Design and Permitting Sample Clauses

Design and Permitting. Seller shall determine the proposed location, design, configuration and capacities of the Facility as it deems appropriate, subject only to the requirements of this Agreement and all applicable Requirements of Law. Seller, at its expense, shall timely take all steps necessary to obtain all Permits required to construct, maintain or operate the Facility and for the production, sale and delivery of Energy and Environmental Attributes in accordance with the requirements of this Agreement and all applicable Requirements of Law. Seller shall represent the Facility as necessary in all meetings with and proceedings before all Governmental Authorities.
AutoNDA by SimpleDocs
Design and Permitting. The Developer shall design and permit the Roadway Improvements in accordance with the terms of this Agreement. The Roadway Improvements shall be designed consistent, as applicable, with the PD&E Study and with the design criteria of the County and FDOT (for S.R. 56) for roads in the applicable class (i.e., urban, suburban, rural, collector, arterial, etc.). The construction contractors to be used by the Developer to complete the Roadway Improvements shall be contractors of good standing and licensed to practice in Pasco County and shall be selected by the Developer based on Developer’s selection criteria.
Design and Permitting. Concessionaire shall be responsible, at its sole cost and expense, for the costs of design and permitting of all improvements within the Premises and shall not commence any work with respect to an Approved Project until all governmental permits and approvals with respect to the Approved Project have been obtained. At no cost or liability to City, City shall reasonably cooperate with Concessionaire’s efforts to obtain such permits and approvals, which cooperation shall include, without limitation, the execution of such instruments as may be required by governmental authorities in order for Concessionaire to apply for and obtain such permits and approvals.
Design and Permitting. Deliverables: The Grantee will complete the design of a stormwater collection and treatment facility and obtain all necessary permits for construction of the project.
Design and Permitting. Xxxxxxx designed the Gage, and the plans and specifications are attached as EXHIBIT F (“Plans and Specs”). The Partiesreview of the Plans and Specs is solely for their own benefit and creates no benefit, right or obligation in any other party or third party.
Design and Permitting. Deliverables: The Grantee will complete the design of the XxXxxxx Ranch Extension Water Quality Restoration – Area 4 project and obtain all necessary permits for construction of the project.
Design and Permitting. Maplewood Cemetery Design, permitting, additional as-built surveying, and Record drawings/certification of one stormwater management device (SWM) at Beechwood Cemetery.
AutoNDA by SimpleDocs
Design and Permitting. Progress for this reporting period: • Identify any delays or problems encountered:
Design and Permitting. Professional services required for engineering and design, obtaining environmental permits and other authorizations and the preparation of plans and specifications for erosions control projects. This item specifically excludes permit application fees or any other fees paid to the State of Florida. Performance standard: All deliverables, reports, and monitoring results will be circulated to the DEPARTMENT for review and comment. When comments are received from the DEPARTMENT affirming that the deliverable is acceptable, payment will be authorized.
Design and Permitting. The goal of this task is to: (1) employ engineering analyses to develop a standardized and repeatable AM final design that will be used to build, install, operate, and evaluate the performance of the AM, and (2) obtain the permits necessary for construction and operation. Once the AM design has been finalized, final “one-line” electrical drawings will be created for NBVC staff to approve and assist in the AM’s installation and operation. The Recipient shall: • Work with NBVC to determine and document non-confidential portion of all the activities performed under this Task that can be included in submittals and publications of this Agreement. • Provide Site Readiness Verification Documents (e.g. copy of contract, any form of agreement, or memorandum of understanding, as applicable). • Conduct system design activities and coordinate these activities with the NBVC Host Site Contact. • Complete AM system engineering design documents including, but not limited to, plans, specifications of AM equipment, components, and configuration, safety, reliability, failure mode & effects, fire protection, emergency response communications backbone, concept of operations document, engineer’s opinion of probable cost. Also, this effort will prepare a preliminary design that uses commercial equipment and is tractable and repeatable. • Inform the CAM in Monthly Progress Reports (Subtask 1.5) which design phases are completed and which applicable permits identified in Task 1.8 are ready to be obtained. • Obtain all required permits and provide Copies of Permits to the CAM (consistent with Task 1.8). • Conduct a cybersecurity assessment and develop Cybersecurity Plan that also defines how the cybersecurity will be addressed over the long-term operation of the microgrid. The NBVC may require no wireless, no internet access and no communication links to be part of or embedded into the AM. The NBVC may require all “firm-xxxx” updates to any portion of the AM equipment to be performed via an on-site process using NBVC personnel. • Develop grid integration strategy including interconnection with utility distribution system feeders and distribution operation center. • Complete SCE Interconnection Application and inform the CAM.