Design and Drawings Sample Clauses

Design and Drawings. (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer.
AutoNDA by SimpleDocs
Design and Drawings. Before actual fabrication is started, detailed working drawings should be furnished by the Contractor to'the Superintending Engineer….., Department, Corporation of Chennai for approval where section specified in the drawings are not readily available the use of alternative sections for fabrications will be considered and the alternate sections will be allowed to the firm payment to the Contractor will be based on the total weight of steel work done.
Design and Drawings. (i) Design and Drawings shall be developed in conformity with the Specifications and Draft Contract AgreementPage 63 of 150 Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-717A in Ranipool-Pakyong section from Design CH: 2.00 to CH: 6.00 (Km 3.100 to Km 7.200 of NH-717A) in the State of Sikkim on EPC Mode Feb. 2021 Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer. (ii) The Contractor shall appoint a proof check consultant (the “Proof Consultant”) after proposing to the Authority a panel of three (3) names of qualified and experienced firms from whom the Authority may choose one (1) to be the Proof Consultant. Provided, however, that if the panel is not acceptable to the Authority and the reasons for the same are furnished to the Contractor, the Contractor shall propose to the Authority a revised panel of three (3) names from the firms empanelled as proof consultants by the [Ministry of Road Transport and Highways] for obtaining the consent of the Authority. The Contractor shall also obtain the consent of the Authority for two (2) key personnel of the Proof Consultant who shall have adequate experience and qualifications in highways and bridges respectively. The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision, with reasons, to the Contractor, and if no such decision is conveyed within the said period, the Contractor may proceed with engaging of the Proof Consultant. (iii) The Proof Consultant shall: (a) evolve a systems approach with the Design Director so as to minimise the time required for final designs and construction drawings; and (b) proof check the detailed calculations, drawings and designs, which have been approved by the Design Director. (iv) In respect of the Contractor’s obligations with respect to the design and Drawings of the Project Highway as set forth in Schedule-I, the following shall apply: (h) The Contractor shall ensure that only controlled copies of drawings reviewed & approved by Authority Engineer is released to site. If the unapproved drawings are found to be released to site, a non refundable penalty of Rs 1,00,000/- shall be levied to the contractor for each incidence. (a) The Contractor shall prepare and submit, with re...
Design and Drawings. In respect of the Contractor’s obligations with respect to the Design and Drawings of the LTTD Plant Project, the following shall apply:
Design and Drawings. 1.26.1 The Lessee shall, subject to the Minimum Development Requirements prescribed for the Project in the Lease cum Development Agreement, at its cost, charges and expenses cause drawings [“Drawings”] to be prepared showing the proposed up- gradation / development / new construction in all Phases applicable for the Project including Phase III as specified in Schedule III: Phase-wise Minimum Development Requirements and submit copies of the drawings to DOT and / or any other official / agency designated by DOT for the purpose of monitoring; Provided that, the Lessee shall in any event, be solely responsible for the adequacy of the Drawings.
Design and Drawings. 10.2.1 Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. The Design Phase shall immediately commence upon issuance of LOA to the Contractor. Contractor’s submittals during Design Phase for the Scope of Works shall include the following stages;-
Design and Drawings. 10.2.1 Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. 10.2.2 Deleted 10.2.3 Deleted
AutoNDA by SimpleDocs
Design and Drawings. (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the km 25.552 to km 27.500 of NH-37A (New NH-715) in the State of Assam on EPC Mode Aug. 2020 Authority’s Engineer.
Design and Drawings. Design and drawings shall be developed in conformity with the specifications and standards set out in the contract. Such design shall have to meet the approval requirement of the designated authority of State Government and shall be responsible for obtaining final approval from the approving authority. In the event, the Concessionaire requires any relaxation in design standards due to certain restrictions in any section, the alternative design criteria for such section shall be provided for review of the Independent Engineer. In respect of the Concessionaire’s obligations with respect to the design and Drawings of work, the following shall apply:
Design and Drawings. (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation NH-202 for Package-I (Design Chainage 283+000 Km to 325+440 Km) in the State of Nagaland on EPC mode under NH (O)-NE” JAN 2022 in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer.