Description of Large Generating Facility Sample Clauses

Description of Large Generating Facility. The Generating Facility is an existing cogeneration facility located at the Xxxx X Xxxxxxx International Airport, located in Queens, New York. The electrical portion of the Generating Facility is composed of two gas-fired GE LM6000 turbines (with jet fuel as a backup fuel), a steam turbine and associated equipment and accessories. The maximum power production capacity is approximately 120 MW.
AutoNDA by SimpleDocs
Description of Large Generating Facility. The Generating Facility is an existing gas-fired combustion turbines/combined cycle facility located in the City of Linden, New Jersey on the property within Xxxxxxxx 66’s Bayway Refinery. The Generating Facility is composed of five gas turbine units (GE MS-7001 EA) and associated waste heat recovery steam generators arranged in combined cycle with three admission/extraction steam turbines. The maximum power production capacity is approximately 800 MWs. Description of Point of Interconnection and Point of Ownership Change The large Generating Facility is connected to a substation owned by the Developer and located in Linden, New Jersey. Two 345kV fluid filled pipe type transmission cables connect the Linden substation to the Goethals Substation, owned by the Connecting Transmission Owner and located in New York City. The 345kV transmission cables run from the New Jersey side of the Xxxxxx Kill to the New York side of the Kill. The Point of Interconnection (“POI”) of the Large Generating Facility is in the Xxxxxx Kill, at the legal boundary between the State of New Jersey and the State of New York. The POI is also the point of ownership change (“POC”) between the facilities owned by the Developer and facilities owned by the Connecting Transmission Owner.
Description of Large Generating Facility. The Generating Facility is an existing gas-fired combustion turbines/combined cycle facility located in the City of Linden, New Jersey on the property within Xxxxxxxx 66’s Bayway Refinery. The Generating Facility is composed of five gas turbine units (GE MS-7001 EA) and associated waste heat recovery steam generators arranged in combined cycle with three admission/extraction steam turbines. The maximum power production capacity is approximately 800 MWs.

Related to Description of Large Generating Facility

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Use of State Facilities Resources and Equipment a. Meeting Space and Facilities. The Employer’s campuses and facilities may be used by the Union to hold meetings subject to the University’s policy and availability of the space. The Employer may provide private space for stewards and/or Union representatives to meet in confidence with those they represent on a space available basis. Staff representatives may reserve and utilize meeting rooms in accordance with University policy and procedure. Such requests will be subject to availability and all applicable fees.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Network Facilities At the time of termination, the Transmission Provider and the Interconnected Entities shall keep in place any portion of the Interconnection Facilities that the Transmission Provider deems necessary for the safety, integrity and/or reliability of the Transmission System. Otherwise, Transmission Provider may, in its discretion, within 30 days following termination of Interconnection Service, require the removal of all or any part of the Interconnection Facilities.

  • Attachment Facilities Not applicable, because there are no CTOAFs for the Merchant Transmission Facility that are covered by this Agreement.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Use of State Facilities Where there is available appropriate meeting space in buildings owned or leased by the State, MSEA-SEIU shall be allowed reasonable use of such space at reasonable times for specific meetings, including space suitable for meetings in private between MSEA-SEIU staff representatives or stewards and employees in the investigation and processing of grievances. In addition, in buildings owned or leased by the State that have video conferencing facilities, MSEA-SEIU may be allowed reasonable use of those facilities. Advance arrangements for the use of State facilities shall be made with the department or agency concerned. MSEA-SEIU shall reimburse the State for any additional expense incurred in allowing use of such space. No other employee organization, except such as have been certified or recognized as the bargaining agent for other State employees, shall have the right to meeting space in State facilities for purposes pertaining to terms and conditions of employment of employees. The use of State facilities for meetings shall be in non-work areas or where work is not in progress. Other than meetings in private between MSEA- SEIU staff representatives or stewards and employees in the investigation and processing of grievances, all meetings in State facilities shall be during the off- duty time of employees attending and, in all instances, attendance shall be voluntary. Arrangements for any meetings in State facilities will be made so as to avoid interference with the department's or agency's operations or violation of the department's or agency's security.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Laundry Facilities SF State University assumes no responsibility in the use of laundry equipment or for lost items.

Time is Money Join Law Insider Premium to draft better contracts faster.