Definition of Building Where Lift Required Sample Clauses

Definition of Building Where Lift Required. 1.1 A passenger/materials lift shall be provided on a building which shall, when complete, consist of more than six (6) storey levels excluding the roof, parapets and basement levels (if any), but including the ground floor. (Refer to Sub Clause 2.1 herein.)
AutoNDA by SimpleDocs

Related to Definition of Building Where Lift Required

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the NYISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Facilities Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • When Lift Required The passenger/materials lift shall be in operation from the date of commencement of formwork erection above the floor level of the fifth storey when counted from the lowest adjacent street level. Floor level means that stage of construction which, in the completed building, would constitute the walking surface of each particular floor level.

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • General Conditions Applicable to Option to Build If the Interconnection Customer assumes responsibility for the design, procurement and construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades,

  • Definition of Overtime Overtime means those hours worked in excess of normal hours of work as per Article 8.1 (Normal Work Week).

  • CONDITION OF PREMISES Tenant acknowledges that neither Landlord nor any agent of Landlord has made any representation or warranty with respect to the condition of the Premises, the Building or the Project, or with respect to the suitability of the Premises, the Building or the Project for the conduct of Tenant’s business. Tenant acknowledges that (a) it is fully familiar with the condition of the Premises and agrees to take the same in its condition “as is” as of the Execution Date, and (b) Landlord shall have no obligation to alter, repair or otherwise prepare the Premises for Tenant’s occupancy or to pay for or construct any improvements to the Premises, except with respect to payment of the TI Allowance and the Furniture Allowance. Notwithstanding the foregoing, Landlord shall deliver possession of the Premises to Tenant (m) in broom clean condition and (n) with the existing base building heating, ventilating and air conditioning system and the existing base building electrical, lighting and plumbing systems, in each case serving the Premises (collectively, the “Existing Building Systems”) in good working order (“Landlord’s Delivery Obligation”). Tenant’s taking of possession of the Premises shall, except as otherwise agreed to in writing by Landlord and Tenant, conclusively establish that the Premises, the Building and the Project were at such time in good, sanitary and satisfactory condition and repair and that Landlord’s Delivery Obligation was satisfied; provided that, if Landlord fails to satisfy Landlord’s Delivery Obligation (a “Delivery Shortfall”), then Tenant may, as its sole and exclusive remedy, deliver notice of such failure to Landlord detailing the nature of such failure (a “Shortfall Notice”); provided, further, that any Shortfall Notice must be received by Landlord no later than the date (the “Shortfall Notice Deadline”) that is ninety (90) days after the Execution Date. In the event that Landlord receives a Shortfall Notice on or before the Shortfall Notice Deadline, and provided that, (r) the Delivery Shortfall was not caused by (or did not arise from) (i) the misuse, misconduct, damage, destruction, negligence and/or any other action or omission of Tenant, Tenant’s contractors or subcontractors, or any of their respective employees, agents or invitees, (ii) Tenant’s failure to properly repair or maintain the Premises as required by this Lease, (iii) any modifications, Alterations or improvements constructed by or on behalf of Tenant (including the Tenant Improvements) or (iv) any other event, circumstance or other factor arising or occurring after the Term Commencement Date and (s) Landlord agrees that the Delivery Shortfall referenced in such Shortfall Notice exists, then Landlord shall, at Landlord’s expense (and not as an Operating Expense), promptly remedy the Delivery Shortfall. Notwithstanding anything to the contrary in this Lease, Landlord shall not have any obligations or liabilities in connection with (y) a Delivery Shortfall except to the extent such Delivery Shortfall is identified by Tenant in a Shortfall Notice delivered to Landlord on or before the Shortfall Notice Deadline and such Delivery Shortfall gives rise to an obligation of Landlord to remedy such Delivery Shortfall under the immediately preceding sentence and/or (z) any failure of the Existing Building Systems to be in good working order arising from or in connection with (i) the misuse, misconduct, damage, destruction, negligence and/or any other action or omission of Tenant, Tenant’s contractors or subcontractors, or any of their respective employees, agents or invitees, (ii) Tenant’s failure to properly repair or maintain the Premises as required by this Lease, (iii) any modifications, Alterations or improvements constructed by or on behalf of Tenant (including the Tenant Improvements) or (iv) any other event, circumstance or other factor arising or occurring after the Term Commencement Date, and in any such case, no Delivery Shortfall shall be deemed to have occurred as a result thereof.

  • SPECIAL CONDITIONS ARTICLE I.1 - SUBJECT I.1.1. The subject of the Contract is [short description of subject].