Defective NFPS Agency Maintenance Sample Clauses

Defective NFPS Agency Maintenance. As further provided in Section 34 (Deliverables) and Section 10 (Training Services), the SI shall provide to the NFPS Agencies (i) full, adequate and correct training, and (ii) complete operating manuals, maintenance manuals, electrical and electronic schematics, mechanical diagrams, Software Documentation and other Documentation related to maintenance of the NFPS (collectively, "SI Maintenance Instructions"). The NFPS Agencies will operate and maintain those components of the NFPS Hardware and NFPS Software under their control in accordance with the SI Maintenance Instructions. The SI's System Warranty and Support Obligations shall not apply to the extent the Failure at issue was caused by an NFPS Agency's material failure to materially comply with the SI Maintenance Instructions.
AutoNDA by SimpleDocs

Related to Defective NFPS Agency Maintenance

  • Emergency Maintenance LightEdge reserves the right to perform emergency Service maintenance as needed outside the Scheduled Maintenance window, in which case LightEdge will make a reasonable effort to notify the Customer if feasible under the circumstances. Any such maintenance will be considered an “Emergency Maintenance”. All Service SLAs will apply during Emergency Maintenance.

  • CONTRACTOR RESPONSIBILITY FOR SYSTEM AGENCY’S TERMINATION COSTS If the System Agency terminates the Contract for cause, the Contractor shall be responsible to the System Agency for all costs incurred by the System Agency and the State of Texas to replace the Contractor. These costs include, but are not limited to, the costs of procuring a substitute vendor and the cost of any claim or litigation attributable to Contractor’s failure to perform any Work in accordance with the terms of the Contract.

  • Custodial/Maintenance Custodian, Buildings/Grounds Maintenance 20.5 Nutrition Services: Kitchen Manager, Kitchen Assistant ARTICLE IV – LEAVES Leave may only be taken in 30 minute increments. Except for emergency situations, unit members must complete the absence request form which includes obtaining their administrator’s written approval prior to taking leave. In emergency situations, the unit member is required to contact their administrator as far in advance of their scheduled work as possible.

  • Responsibility for Quality of Materials and Installation Contractor acknowledges that he has full, total, and complete responsibility for providing materials, labor, and all other items necessary for providing the level of quality specified in the Contract Documents. He agrees that this responsibility is indivisible, non-delegable, non- transferable, and not diminished by any inspections provided by the Design Professional or his consulting engineers, nor by any inspections provided by the Owner. In recognition of this, Contractor will prepare for submission and review by the Design Professional, a written program describing the efforts that will be taken to insure the proper quality level is achieved. The program shall be submitted prior to the issuance of a Proceed Order.

  • PERFORMING AGENCY RESPONSIBILITY FOR SYSTEM AGENCY’S TERMINATION COSTS If the System Agency terminates the Contract for cause, the Performing Agency shall be responsible to the System Agency for all costs incurred by the System Agency and the State of Texas to replace the Performing Agency. These costs include, but are not limited to, the costs of procuring a substitute vendor and the cost of any claim or litigation attributable to Performing Agency’s failure to perform any Work in accordance with the terms of the Contract.

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Rectification of Safety Hazard 60.12 Where, because of the existence of a safety hazard, a site has been stopped for a defined period of time and Employees sent off site by agreement between Site Managers and any combination of Union Official/s, Health and Safety Committee, those people who remain on site to do rectification work will be paid at the rate of double time for all such work.

  • Glass Or Safety Glazing Material a. We cover:

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

Time is Money Join Law Insider Premium to draft better contracts faster.