Decommissioning Phase Sample Clauses

Decommissioning Phase. The Decommissioning Phase shall commence no later than two weeks prior to the termination of this lease agreement.
AutoNDA by SimpleDocs
Decommissioning Phase. Decommissioning activities can be conceptually summarized as follows: removal of fuel from reactor and transfer of fuel and associated wastes to interim or long- term storage; decontamination of plant; flush purging of equipment and systems; removal of surface decontamination of facilities or equipment; dismantling and removal of equipment and systems; demolition of building; and site restoration.
Decommissioning Phase. The portion of the Term during which Lessee will undertake the decommissioning activities described in Section 3.2.4.
Decommissioning Phase. ▪ The Project components are expected to function in perfect condition until after year 2050. Routine checks and maintenance activities should be undertaken to maintain the facilities. If any failure takes place, specific measurements will be taken. However the project facilities are expected to stay operational for as long as the structure is in a good condition to provide water supply and sanitation services for the Project area.

Related to Decommissioning Phase

  • Decommissioning The expenditure for Decommissioning will be estimated on the basis of technical studies undertaken by the Contractor, to be agreed by the National Petroleum Agency, as part of each Field Development Program and revised as necessary.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Construction Phase Part 1 –