DC Power Reduction Sample Clauses

DC Power Reduction. DC Power Reduction With Reservation allows CLEC to reserve a fuse or breaker position on the power board or battery distribution fuse board (BDFB) when reducing a secondary power feed to zero. CLEC will pay a monthly power maintenance charge to retain the existing power cabling and fuse position for future power augment requests or until such time as CLEC notifies Qwest it wishes to discontinue the option. DC Power Reduction Without Reservation allows CLEC to reduce the ordered amps on a primary or secondary feed to a minimum of twenty (20) amps.
AutoNDA by SimpleDocs
DC Power Reduction. DC Power Reduction With Reservation allows WSP to reserve a fuse or breaker position on the power board or battery distribution fuse board (BDFB) when reducing a secondary power feed to zero. WSP will pay a monthly power maintenance charge to retain the existing power cabling and fuse position for future power augment requests or until such time as WSP notifies Qwest it wishes to discontinue the option. DC Power Reduction Without Reservation allows WSP to reduce the ordered amps on a primary or secondary feed to a minimum of twenty (20) amps.

Related to DC Power Reduction

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Financial Reductions Notwithstanding any other provision of this Agreement, and at the discretion of the LHIN, the HSP may be subject to a financial reduction in any of the following circumstances:

  • MWBE Utilization Plan A. In accordance with 5 NYCRR § 142.4, Bidders are required to submit a completed Utilization Plan on Form MWBE 100 with their bid.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Legal Action; Utilization of Special Receivership Powers The Assuming Institution shall notify the Receiver in writing (such notice to be given in accordance with Article V below and to include all relevant details) prior to utilizing in any legal action any special legal power or right which the Assuming Institution derives as a result of having acquired an asset from the Receiver, and the Assuming Institution shall not utilize any such power unless the Receiver shall have consented in writing to the proposed usage. The Receiver shall have the right to direct such proposed usage by the Assuming Institution and the Assuming Institution shall comply in all respects with such direction. Upon request of the Receiver, the Assuming Institution will advise the Receiver as to the status of any such legal action. The Assuming Institution shall immediately notify the Receiver of any judgment in litigation involving any of the aforesaid special powers or rights.

  • Wage Increase 1. The minimum hourly wage amounts in the salary table in column I (job grades 1 up to and includ- ing 3) concern the statutory minimum wage and are adjusted in the event of an increase in the statutory minimum wage.

  • No Sub-Division Not to sub-divide the said Apartment and the Common Areas, under any circumstances.

  • Allocation of Senior Reduction Amount to the Reference Tranches On each Payment Date prior to the Termination Date, after allocation of the Tranche Write-down Amount or Tranche Write-up Amount, if any, for such Payment Date as described above, the Senior Reduction Amount will be allocated to reduce the Class Notional Amount of each Class of Reference Tranche in the following order of priority, in each case until its Class Notional Amount is reduced to zero:

  • STS-1 Loop STS-1 Loop is a high-capacity digital transmission path with SONET VT1.5 mapping that is dedicated for the use of the ordering customer for the purpose of provisioning local exchange and associated exchange access services. It is a two-point digital transmission path which provides for simultaneous two-way transmission of serial bipolar return-to-zero synchronous digital electrical signals at a transmission rate of 51.84 Mbps. It may provide transport for twenty-eight (28) DS1 channels, each of which provides the digital equivalent of twenty-four (24) analog voice grade channels. The interface to unbundled dedicated STS-1 transport is a metallic-based electrical interface.

  • Staff Reduction In the event the District adopts a reduced educational program by reason of financial necessity, including but not limited to, levy failure and/or decreased State or Federal support, certificated employees who will be retained to implement the District’s reduced or modified program and those certificated employees who will be non-renewed from employment or adversely affected in contract status shall be identified by the provisions contained in this Article. If the District is only reducing provisional employees, the following procedures do not need to be implemented.

Time is Money Join Law Insider Premium to draft better contracts faster.