Dam Safety. (a) The provisions of this section apply only to RUS financed electric system facilities.
AutoNDA by SimpleDocs
Dam Safety. (a) Without limitation to the generality of sub-paragraph (1) (c) above, if it is determined that a proposed Subproject under Component 1 (a) or irrigation investment under Component 2 (b) would involve:
Dam Safety. 1. In order to ensure the proper management and safety of Bagré Dam and of the operations and maintenance of the power station associated with said dam, the Recipient:
Dam Safety. The Borrower shall take all action required on its behalf to enable UHE to comply with the provisions stipulated in paragraph 2, Section B, of Schedule 2 to the Project Agreement regarding the establishment and operation of the Dam Safety Center, the design and carrying out of works under Part B of the Project, and the implementation of plans and continuation of safety inspections of the dams.
Dam Safety. 7. (a) Each Project Implementing Entity shall have in place, or cause to have in place, independent dam safety experts (“Dam Safety Experts”), with qualifications and experience, satisfactory to the Bank. The Dam Safety Experts shall be responsible for monitoring and evaluating the safety of the First-year Subproject Related Dams and providing to the Bank by each December 31, beginning on December 31, 2007, an annual report of said monitoring and evaluation, prepared under terms of reference satisfactory to the Bank, together with any recommendations for remedial works being carried out or to be carried out.
Dam Safety. 5. In the event that any irrigation scheme under the Project draws from an existing dam or a dam under construction or rehabilitation (including Shilianghe dam and Xiaotashen dam in Jiangsu, Fengshuiling dam in Anhui, and Gutou dam in Shandong), the concerned Project Province shall apply, or cause to be applied, in the implementation of the schemes, the provisions of the Dam Safety Report, acceptable to the Bank, and:
AutoNDA by SimpleDocs
Dam Safety. In order to ensure the proper design and construction of the Xiaolangdi Dam, YRWHDC shall continue to employ throughout the period of Project implementation, a panel of independent experts whose qualifications, experience and terms of reference shall be acceptable to the Bank, to be responsible for undertaking reviews, at least once every year, or more often, if so required, of (1) the designs and technical specifications of goods and works required for said dam and (2) the construction undertaken in respect of said dam, and for advising on technical issues that may arise during its construction. YRWHDC shall prepare, under guidelines acceptable to the Bank, and furnish to the Bank, promptly upon the completion of each said review, a report setting forth the findings and recommendations of said panel, together with any revisions to the designs, technical specifications or construction indicated by said findings. YRWHDC shall afford the Bank a reasonable opportunity to exchange views with YRWHDC on each such report, and shall thereafter implement the recommendations and introduce the revisions set forth in said report, taking into account the views of the Bank on the matter.
Dam Safety. 1. The Borrower, through MEWM, shall: (a) not later than September 15, 2004, establish and thereafter maintain an independent Dam Safety Panel within CONSIB which shall be responsible for undertaking periodic reviews of the designs and technical specifications and advising on dam safety issues; and (b) provide dam safety reports prepared by the Dam Safety Panel to the Bank for review and comments.
Dam Safety. In order to ensure the safety of each dam included in the Project which is planned to reach ten (10) meters in height or more or to create a reservoir with a gross storage volume of 2,500,000 cubic meters or more, or which the Association determines possesses unusual design features, involves difficult geological conditions or is situated so as to cause significant damage in the event of a failure of the dam to operate properly (a Designated Dam), Shanxi shall take the following actions: