Curing and Protection. The Contractor shall take adequate measures to ensure that the concrete shall be kept damp continuously for a minimum of three (3) days after casting or for such other time as the Engineer may direct. After removal of this covering (layer of sacking, canvas, Hessian, straw mats or similar absorbent material or a layer of sand), the concrete shall then be sprayed with water for minimum period of a further fourteen (14) days. All concrete liable to be affected by running water or wave action shall be adequately protected from damage during the setting period and all temporary protection works shall be to the satisfaction of the Engineer.
AutoNDA by SimpleDocs
Curing and Protection. Add Paragraph 3.7.B to read as follows: B Seal all joints in slab-on-grade and structural platform. END OF SECTION 03300 SECTION 03350 CONCRETE FINISHING The provisions of the DART Standard Specification Section 03350, “Concrete Finishing”, shall apply to the Work as modified herein.
Curing and Protection. Protect the finished subgrade against drying for 72 hours after compaction by spraying with water to maintain a continuous moist condition. The Contractor may apply an asphalt prime coat immediately after trimming instead of keeping the finished surface moist with water. If this option is chosen, apply SS-1H or CSS-1H at the rate of 0.22 gallons per square yard to achieve a minimum of 0.13 gallons per square yard residue. Multiple light applications may be necessary to obtain the specified rate of application without run-off. Avoid placing construction loads or operating equipment until the treated subgrade has cured and can withstand the loads without damaging the subgrade. If the subgrade deforms under the construction loads and cannot return back to its original condition, or if it deflects more than 1 inch, allow the subgrade additional curing time before operating equipment on the subgrade. Repair any damaged subgrade. Cover the finished treated subgrade with surfacing before it is subjected to freezing. If the finished treated subgrade is subjected to freezing, the Engineer will determine when the subgrade needs to be reworked. KDOT will not pay for the replacement and refinishing of the treated subgrade if the material loses the required stability, density or finish before the next course is placed.
Curing and Protection. A. Curing: All newly placed concrete shall be cured by one or more of the following methods:
Curing and Protection. Care must be taken that no concrete is allowed to become prematurely dry and the fresh concrete must be carefully protected within two hours of placing from rain, sun and wind by means of hessian sacking, polythene sheeting, or other approved means. This protective layer and the concrete itself must be kept continuously wet for at least seven days after the concrete has been placed. The Contractor will be required to provide complete coverage of all fresh concrete for a period of 7 days. Hessian or polythene sheeting shall be in the maximum widths obtainable and shall be secured against wind. The Contractor will not be permitted to use old cement bags, hessian or other material in small pieces. Concrete in foundations and other underground work shall be protected from admixture with falling earth during and after placing. Traffic or loading must not be allowed on the concrete until the concrete is sufficiently matured, and in no case shall traffic or loading be of such magnitude as to cause deflection or other movement in the formwork or damage to the concrete members. Where directed by the Engineer props may be required to be left in position under slabs and other members for greater periods than those specified hereafter.
Curing and Protection. A. General: Start initial curing as soon as free water has disappeared from the concrete surface after placing and finishing. Keep concrete continuously moist for seven days minimum after placement.
Curing and Protection. 3.10.1. Comply with requirements of ACI 308. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.
AutoNDA by SimpleDocs

Related to Curing and Protection

  • Safety and Protection 8.18.1 The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. The Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to:

  • ENVIRONMENT, SAFETY AND HEALTH PROTECTION (a) Seller shall perform this Agreement in a manner that ensures adequate protection for workers, the public, and the environment, and shall be accountable for actions of itself and its lower-tier subcontractors, agents and employees. Seller shall exercise a degree of care commensurate with the work and the associated hazards. Seller shall ensure that management of environment, safety and health (ES&H) functions and activities is an integral and visible part of Seller’s work planning and execution process. In the event that Xxxxxx fails to comply with this Agreement, Company may, without prejudice to any other legal or contractual rights, issue an order stopping all or any part of the work; thereafter a start order for resumption of work may be issued at Company’s discretion. Seller shall make no claim for an extension of time or for compensation or damages by reason of or in connection with such work stoppage. In addition, Company may require, in writing, that Seller remove from the work any employee the Company deems unsafe, incompetent, careless, or otherwise objectionable.

  • Employment Protection A regular employee who is displaced from their job because of technological change will be considered to be laid off according to Article 13 (Layoff and Recall).

  • Job Protection 15.9.1 Subject to 15.10 below, an employee returning from parental leave is entitled to resume work in the same position or a similar position to the one they occupied at the time of commencing parental leave. A similar position means a position:

  • AMERICANS WITH DISABILITIES ACT (ADA) COMPLIANCE No Contractor, or Contractor’s agent, shall engage in any discriminatory practice against individuals with disabilities as defined in the ADA, including but not limited to: employment, accessibility to goods and services, reasonable accommodations, and effective communications.

  • AMERICANS WITH DISABILITIES ACT (ADA) Contractor must comply with the ADA, which provides comprehensive civil rights protection to individuals with disabilities in the areas of employment, public accommodations, state and local government services, and telecommunications.

  • Employment Protection Provisions 9.1.1 ‘Restructuring’ is given the same definition as in section 69OI of the Employment Relations Act 2000 and includes:

  • Americans with Disabilities Act Compliance a. When the Project scope includes work on sidewalks, curb ramps, or pedestrian- activated signals or triggers an obligation to address curb ramps or pedestrian signals, the Parties shall:

  • Occupational Safety and Health Acts Contractor(s) who perform any work under this contract shall fully comply with the provisions of the Federal Occupational Safety and Health Act of 1970 and any amendments thereto and regulations pursuant to the act. Any Contractor who fails to do so may be terminated for cause as set forth below.

  • Foot Protection The Employer reserves the right to require the wearing of foot protection by employees. In such cases, the Employer will provide a safety device or, if the Employer requires the employee to purchase approved safety shoes, the Employer will pay an allowance, not to exceed the established contract price approved by the State Purchasing Division, during January of each year.