INTENT OF CONTRACT DOCUMENTS 1.1. It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe Work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the Laws or Regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, Law or Regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein.
Hours of Work and Scheduling Provisions (b) In the event an Employee is scheduled to work on the evening or night Shift(s) on the day(s) or the night Shift commencing on the day(s) on which the Employee is called as a juror or witness in matters arising out of the Employee’s employment with the Employer, the Employee shall be granted a leave of absence for those scheduled Shift(s).
ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below.
WORK PRODUCT/PRE-EXISTING WORK PRODUCT OF CONTRACTOR Any and all work product resulting from this Contract is commissioned by the County of Marin as a work for hire. The County of Marin shall be considered, for all purposes, the author of the work product and shall have all rights of authorship to the work, including, but not limited to, the exclusive right to use, publish, reproduce, copy and make derivative use of, the work product or otherwise grant others limited rights to use the work product. To the extent Contractor incorporates into the work product any pre-existing work product owned by Contractor, Contractor hereby acknowledges and agrees that ownership of such work product shall be transferred to the County of Marin.
Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate, and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter check socket enclosure. The Connecting Transmission Owner shall: provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; perform all terminations; and supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.