Cost Control System Sample Clauses

Cost Control System. The Design-Builder shall use a system of cost control for the Work in a format consistent with the GMP Drawings & Specifications and approved by the Department, which shall include, without limitation, regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes. Design-Builder shall identify variances between actual and estimated costs and report the variances to the Department, the Architect and the Program Manager at regular intervals.
AutoNDA by SimpleDocs
Cost Control System. The Contractor shall use a system of cost control for the Work in a format consistent with the GMP Drawings & Specifications and approved by the Department, which shall include, without limitation, regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes. The Contractor shall identify variances between actual and estimated costs and report the variances to the Department and the Program Manager at regular intervals.
Cost Control System. The Contractor shall maintain accurate records of the Cost of the Work. Where Work is being performed on a time and materials bases or to be funding through an allowance in the Lump Sum Price, the Contractor shall identify variances between actual and estimated costs and report the variances to the Department and the Project Manager at regular intervals.
Cost Control System. The Design-Builder shall maintain accurate records of the Cost of the Work and shall identify variances between actual and estimated costs and report the variances to the Department and the Program Manager at regular intervals.
Cost Control System. Construction Manager shall provide sufficient timely (monthly) data and detail to permit the Construction Team to control and adjust the Project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the Guaranteed Maximum Price.
Cost Control System. CM shall develop and monitor an effective system of Project cost control, which system shall be disclosed to and reviewed and approved by Owner and Owner's Representative. In connection with the management of the Cost Control System, CM shall develop cash flow reports and forecasts as reasonably requested or required by Owner or Owner's Representative.
Cost Control System. Design Builder shall provide sufficient timely (monthly) data and detail to permit the Construction Team to control and adjust the Project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the Guaranteed Maximum Price.
AutoNDA by SimpleDocs
Cost Control System 

Related to Cost Control System

  • Cost Control The budget established by the OWNER for the construction of the Project and CONSULTANT fee shall be considered as absolute. The CONSULTANT shall advise OWNER in writing of the following: