Control Room. For new substation, substation control room shall be provided to house substation work stations for station level control (SAS) alongwith its peripheral and recording equipment, AC & DC distribution boards, DC batteries & associated battery chargers, Fire Protection panels, Telecommunication panels & other panels as per requirements. Air conditioning shall be provided in the building as functional requirements. Main cable trenches from the control room shall have adequate space provision for laying of cables from control room for all the future bays also. At existing substations, the adequacy of size of control room shall be ascertained and the same shall be augmented as per requirement.
AutoNDA by SimpleDocs
Control Room. A location where the line control, signalling control and traction current control (on some lines) functions are carried out in an integrated manner.
Control Room. Integrates all internal and external security communications networks within a secure room. Activities conducted within the control room have a critical impact on the institution's orderly and secure operation.
Control Room. In addition to installing the Equipment, the Project SPV shall set up a control room with CCMS to monitor and operate the Greenfield Public Street Lighting System in the space provided by the Authority pursuant to Clause 2.2(c)(i). The Project SPV shall set up the control room within thirty (30) Days of execution of the Amendment Agreement. The control room shall be used solely for the purposes of monitoring and operating the Greenfield Public Street Lighting System. The Project SPV shall at its own cost be responsible for upkeep and maintenance of the control room during the Term.
Control Room. 37.1 A Venue must provide a central control room, for Venue security and police to oversee Match security and monitor ingress and egress. It must have monitors for a television surveillance system ensuring an overall view of the inside of the Venue as well as equipped with communication facilities.
Control Room. A high level control room, located over part of the substation, houses the control console which controls, and indicates on a mimic diagram, the functioning of all the pumps and syphon-breaker valves. It also houses the gate winch controls, the filling valve controls, lighting controls and serves as a communication centre with public address, telephone and radio communications. The control room is in a position to provide monitoring and control of access to the pumproom.
Control Room. No person may operate a control room1 or the equipment therein without Management approval.
AutoNDA by SimpleDocs
Control Room. The control room lighting shall consist of general area, control panel, emergency, and exit lighting. Control room general area lighting and control panel lighting shall be provided by fluorescent light fixtures that with care taken to minimize reflected glare. Incandescent light fixtures for emergency lighting shall be recessed down lights. The emergency light fixtures shall be normally "off" and shall be automatically turned "on" upon loss of the plant reliable service. The emergency lighting shall be powered from the 125volt dc station battery.
Control Room. At minimum, the building should provide a two-hour fire resistance (typically concrete block with brick facing, minimal wired glass windows and fire-rated doors). Due to proximity to neighboring units and depending on the insurance company's position, some level of blast resistance may be required. Once building construction is agreed upon, the following fire protection should be provided:
Control Room. Contractor will design and construct the Facilities with a single central control room (CCR). Primary operator interface with process controls and safety instrumented systems is to be in the CCR. Engineering work stations for maintenance of process control and safety instrumented systems will be in the same building as the CCR.