Construction Works involves the Marine Travel Routes Sample Clauses

Construction Works involves the Marine Travel Routes. The work scope of this Contract does not include marine construction or vessel operation related to construction works. With reference to AECOM letter “Environmental Permit No. EP-353/2009/I EP Condition 2.8 – Marine Travel Route Plan” (Ref: HKBCF/(VCP)(HY/2013/03)/ M45/100(0013)/B300436) dated on 4 August 2015, it was confirmed that all materials would be delivered from land and no marine transportation required. However, referring to Engineer’s Representative instruction (AECOM), (Ref: HKBCF/(VCP)(HY/2013/03) /C15/450(0001)/B301226) dated on 16 October 2015(Appendix B), CHEC is required to dispose the excavated marine sediment generated at designated disposal sites within Hong Kong as allocated by the Marine Fill Committee. Dumping permit has been applied under the Dumping at Sea Ordinance issued by EPD for the marine disposal works. With reference to submission of Variation to Environmental Permit (6th Submission – Version 2.4) (Ref: CHEC300/OUT/2016/01/04.06/003897) dated on 5 January 2016, floating concrete batching plant will be used for providing concrete supply to construction on HKBCF. Raw material for concrete production will be delivered to the floating concrete batching plant from mainland by pelican barge. After reviewing of the construction programme, the oversize precast segment will be transported from mainland by dry cargo barge. Also, temporary asphalt mixing facility will be used for providing asphalt supply to construction on HKBCF. Raw material for asphalt production will be delivered from mainland by pelican barge. With reference to AECOM letter (Ref: HKBCF/(VCP)(HY/2013/03)/ C15/440()/B314281) dated on 8 May 2017 (Appendix B), CHEC was requested to deliver surplus filling material from HKBCF project to the TM-CLKL project by marine access. With reference to Airport Authority Hong Kong’s Consent letter (Ref: PSU/3206/O/205) dated on 12 June 2017 (Appendix C), CHEC was approved to deliver surplus filling material from HKBCF project to the Airport Authority Hong Kong’s Three Runway Project by marine access, the disposal location at Three Runway Project is only sand blanket filling area which presented in Figure 1 and Figure 3. 中國港灣工程有限公司 Regular Marine Travel Routes Plan China Harbour Engineering Co., Ltd. Contract No.: HY/2013/03
AutoNDA by SimpleDocs

Related to Construction Works involves the Marine Travel Routes

  • Travelling, Transport and Fares (a) An employee required and authorised to use their own motor vehicle in the course of their duties will be paid not less than the allowance set out in item 21 in Table 2.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Approved Services; Additional Services Registry Operator shall be entitled to provide the Registry Services described in clauses (a) and (b) of the first paragraph of Section 2.1 in the Specification 6 attached hereto (“Specification 6”) and such other Registry Services set forth on Exhibit A (collectively, the “Approved Services”). If Registry Operator desires to provide any Registry Service that is not an Approved Service or is a material modification to an Approved Service (each, an “Additional Service”), Registry Operator shall submit a request for approval of such Additional Service pursuant to the Registry Services Evaluation Policy at xxxx://xxx.xxxxx.xxx/en/registries/rsep/rsep.html, as such policy may be amended from time to time in accordance with the bylaws of ICANN (as amended from time to time, the “ICANN Bylaws”) applicable to Consensus Policies (the “RSEP”). Registry Operator may offer Additional Services only with the written approval of ICANN, and, upon any such approval, such Additional Services shall be deemed Registry Services under this Agreement. In its reasonable discretion, ICANN may require an amendment to this Agreement reflecting the provision of any Additional Service which is approved pursuant to the RSEP, which amendment shall be in a form reasonably acceptable to the parties.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • Developer and Connecting Transmission Owner agree to report to each other in writing as soon as practical all accidents or occurrences resulting in injuries to any person, including death, and any property damage arising out of this Agreement.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Professional Improvement Leave A teacher may be granted leave to be used for the teacher's professional improvement. Professional improvement days may be approved by the superintendent and used for the purpose of:

Time is Money Join Law Insider Premium to draft better contracts faster.