Construction Utilities Sample Clauses

Construction Utilities. Contractor shall be responsible for the cost, supply and availability of electric power and distribution requirements for the performance of the Work at the Job Site. Contractor shall provide its own telephone, facsimile, radio, telex and other communication facilities at the Job Site as necessary for the performance of the Work. In addition, Contractor shall provide its own temporary lighting, water and sewer facilities at the Job Site.
AutoNDA by SimpleDocs
Construction Utilities. 4.3.5 Existing Utilities; Removal, Relocation and Protection.
Construction Utilities. The Contractor shall furnish all construction utilities and related equipment, materials, and supplies required for prosecution of the Work under these specifications but not incorporated in the completed Work. All construction utilities shall be of the proper type and size to adequately perform the Work. All construction utilities shall be regularly and systematically maintained throughout the Work to ensure proper and efficient operation. Construction utilities which are inadequate or improperly maintained shall be promptly modified, repaired, or removed from the site and replaced to the satisfaction of CPS Energy. All temporary construction utilities furnished by the Contractor shall remain the property of the Contractor and, when the construction is completed, all such temporary construction utilities shall be removed from the site and the area shall be restored to its original condition. All construction utility equipment furnished by the Contractor for use on the Work shall be of the type and size required to perform the Work in a safe and satisfactory manner. All equipment shall be in first-class condition when delivered to the jobsite and shall be maintained in this condition throughout the construction period. Any equipment which is not suitable or which is not in first-class operating condition shall immediately be repaired or replaced with acceptable equipment. CPS Energy will not furnish construction power.
Construction Utilities. Contractor shall be responsible for the cost, supply and availability of electric power and distribution requirements for the performance of the Work at the Job Site for the construction and up to Provisional Acceptance; provided, however, Contractor shall be responsible for the cost of any such items to the extent required in order to reperform any Tests. Contractor shall provide its own telephone, facsimile, radio and other communication facilities at the Job Site as necessary for the performance of the Work. If FPL determines that any Test performed or to be performed by Contractor will result in financial harm to FPL, Contractor will accommodate FPL’s reasonable requests to mitigate or alleviate such harm to FPL. In addition, Contractor shall provide, at its sole cost and expense, all chemicals for commissioning, start-up and testing and its own temporary lighting, water and sewer facilities at the Job Site.
Construction Utilities. Bayer shall supply certain utilities to the Leased Premises for EDNC's use in the construction of the EDNC Baytown Plant. Bayer shall invoice EDNC monthly for such construction utilities at Bayer's Net Distributed Cost.
Construction Utilities. 16 2.1.4 OWNER'S REPRESENTATIVE 16 2.1.5 OWNER'S GOVERNMENTAL APPROVALS 16 2.1.6 REGISTRATION AND FINANCING REQUIREMENTS 17 2.1.7 OPERATING PERSONNEL 17 2.1.8 CUSTOMS CLEARANCE 17 2.1.9 INTERCONNECTIONS TO THE UTILITY 18 2.1.10 RELEVANT INFORMATION FOR CONTRACTOR 18 2.1.11 SPARE PARTS 18 2.1.12 OTHER ITEMS OF OWNER SUPPLY 18 2.1.13 PAYMENT OBLIGATIONS TO CONTRACTOR 18 2.2 HAZARDOUS MATERIALS 18 2.3 ITEMS REQUIRED FOR CHECK-OUT, START-UP AND PERFORMANCE TESTING 18 2.4 COMPLIANCE WITH APPLICABLE LAWS 19 2.5 ENGAGEMENT OF OWNER'S ENGINEER 19 2.6 OWNER'S SITE WORKS 19 2.7 LETTER OF CREDIT 19 ARTICLE III. RESPONSIBILITIES OF CONTRACTOR 20 3.1 CONTRACTOR'S GENERAL OBLIGATION TO PROVIDE FACILITY 20 3.2 SPECIFIC OBLIGATIONS 20 3.2.1 HANDLING OF EQUIPMENT AND MATERIALS, ETC 20 3.2.2 QUALITY OF EQUIPMENT AND MATERIALS, ETC 21 3.2.3 CONSTRUCTION MEANS, METHODS, ETC 21 3.2.4 KEY PERSONNEL 21 3.2.5 MAINTENANCE OF JOB SITE 21 3.2.6 JOB SITE SAFETY 22 3.2.7 INTERCONNECTION TO THE UTILITY 22 3.2.8 SPECIAL TOOLS, SPARE PARTS RECOMMENDATIONS 22
Construction Utilities. Provide construction power and construction water and two telephone lines in the vicinity of the Job Site at no additional cost to the Contractor.
AutoNDA by SimpleDocs
Construction Utilities. 5.15.1 Electrical Contractor shall be responsible for construction power and payments until Substantial Completion. Owner will be responsible for permanent power facility and payments.
Construction Utilities. 2 2.7 Hazardous Wastes or Materials ...................................... 2
Construction Utilities. Owner shall make arrangements for the supply of, and shall supply at no cost to Contractor, all utilities (other than telephone services) required during construction, commissioning, startup, and Facility testing until Substantial Completion.
Time is Money Join Law Insider Premium to draft better contracts faster.