Construction Sequence Sample Clauses

Construction Sequence. The Engineer shall consider the requirements for construction staging and traffic control throughout the development of schematic design to ensure that the proposed design can be constructed. The Engineer shall provide construction phasing assumptions to the State as requested.
AutoNDA by SimpleDocs
Construction Sequence. (7-1-95) (Rev. 8-21-12) 560 SP1 R34R Pave each section of roadway begun in a continuous operation. Do not begin work on another section of roadway unless satisfactory progress is being made toward completion of intersections and all other required incidental work by satisfactorily furnishing additional paving equipment and personnel, except for milling and patching operations.
Construction Sequence. The Engineer shall consider the requirements for construction staging and traffic control throughout the development of schematic design to ensure that the proposed design can be constructed. The Engineer shall provide written documentation of construction phasing assumptions to the State at each schematic and PS&E milestone, or by request. DocuSign Envelope ID: 3834C76D-F898-4EF5-A280-35D1D4DA0CBD Design Exceptions. The Engineer shall identify design exceptions and waivers, and shall document the necessity for each design exception or waiver for approval. Traffic Data and Projections.
Construction Sequence c. The Engineer shall consider the requirements for construction and traffic control DocuSign Envelope ID: 0EF7DD01-5DEF-492D-AF48-72F6373D49D2 DocuSign Envelope ID: 973D3771-56AD-4A37-8E90-25E408E93E1A throughout the development of schematic design so that the proposed design can be constructed.
Construction Sequence. Replace paragraphs (i), (ii) and (iii) with the following: “In all cases where kerbing and/or channelling adjoin the bituminous surface of the road, the kerbing and/or channelling may only be constructed after the bituminous surface has been completed. Before commencing with the kerbing and/or channelling, the surfacing and the base, shall be accurately cut to line with a mechanical saw to a minimum depth of 75mm. After excavation the concrete shall then be cast against the cut surface without formwork. All material outside the cut line must be carefully removed to the required thickness of concrete without damaging the edge before commencing with the casting of the concrete. No payment shall be made for repair work as instructed by the engineer to damage caused by the cutting/excavating process of surfacing and base layers. Any concrete spilt onto the surfacing shall immediately be removed and cleaned. Where so required by the engineer, the contractor shall, without any additional compensation, paint emulsion over the stained surface. Add the following sub clause:
Construction Sequence. (Rev. 7-07-2016) 560 SP1 R34R (REV.) The Contractor shall construct the project according to the following sequence:
Construction Sequence. The Engineer shall consider the requirements for construction staging and traffic control throughout the development of schematic design modification to ensure that the proposed design modification can be constructed in the areas between US 90 and the Xxxxxx River and the vicinity of the Xxxx 0000/Xxx Xxxxxxxx Intersection. The Engineer shall provide construction phasing assumptions to the State as requested.
AutoNDA by SimpleDocs
Construction Sequence. As Amendment #6 is a predecessor amendment to pending Amendment #7, Amendment #7 will include a detailed construction sequence description that incorporates this Amendment #6 scope of work. Milestone Completion Dates Amendment #6 is essential to achieve the milestone completion dates outlined in Amendment #7 (future / pending). Therefore, there are no “direct” milestone completion dates associated with this Amendment #6. << END OF DOCUMENT >>
Construction Sequence. (7-1-95) (Rev. 8-21-12) 560 SP1 R34R Pave each section of roadway begun in a continuous operation. Do not begin work on another section of roadway unless satisfactory progress is being made toward completion of intersections and all other required incidental work by satisfactorily furnishing additional paving equipment and personnel, except for milling and patching operations. POLYPROPYLENE CULVERT PIPE: (8-20-19) 305,310 SP3 R35 Revise the 2018 Standard Specifications as follows: Page 3-5, Article 305-1 DESCRIPTION, lines 12-14, replace with the following: Where shown in the plans, the Contractor may use reinforced concrete pipe, aluminum alloy pipe, aluminized corrugated steel pipe, HDPE pipe, Polypropylene Pipe, or PVC pipe in accordance with the following requirements. Page 3-5, Article 305-2 MATERIALS, add the following after line 16: Item Section Polypropylene Pipe 1032-9 Page 3-6, Article 310-2 MATERIALS, add the following after line 9: Item Section Polypropylene Pipe 1032-9 Page 3-6, Article 310-4 SIDE DRAIN PIPE, lines 24-25, replace the first sentence of the second paragraph with the following: Where shown in the plans, side drain pipe may be Class II reinforced concrete pipe, aluminized corrugated steel pipe, corrugated aluminum alloy pipe, polypropylene pipe, HDPE pipe or PVC pipe. Page 3-7, Article 310-5 PIPE END SECTIONS, lines 2-4, replace the second sentence with the following: Both corrugated steel and concrete pipe end sections will work on concrete pipe, corrugated steel pipe, polypropylene pipe, and HDPE smooth lined corrugated plastic pipe. Page 3-7, Article 310-6 MEASUREMENT AND PAYMENT, add the following after line 14: Pay Item Pay Unit ″ Polypropylene Pipe Linear Foot Page 10-60, add Article 1032-9:
Construction Sequence. Main water lines, sewer lines, storm sewers, and roadways shall be constructed in an orderly sequence as the addition is developed and built upon, weather conditions permitting, so that there will be no gaps left in street paving, curbs, gutters and other off-site improvements. Streets shall not be paved until all water lines, storm sewers, and property water and sewer services are in place and the trenches thereof properly backfilled and compacted in accordance with City requirements. The Owner shall receive the approval from the Public Works Director, City Engineer or designated authority for any and all phases of construction. The construction shall be completed in accordance with City approved plans. Owner shall provide, through his/her engineer, all completion documents concerning the subdivision construction, including but not limited to: as- constructed drawings; Certificates of Completion, and completed “punch list” items as accepted by the Public Works Director and City Engineer, prior to issuance of Certificate of Occupancy for any building in the Addition.
Time is Money Join Law Insider Premium to draft better contracts faster.