Common use of Construction Documents Clause in Contracts

Construction Documents. Tenant shall cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days of receipt thereof, and the Tenant shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten (10) Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlord.

Appears in 4 contracts

Samples: Lease (Precision Biosciences Inc), Lease (Precision Biosciences Inc), Lease (Precision Biosciences Inc)

AutoNDA by SimpleDocs

Construction Documents. Tenant shall cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days of receipt thereof, and the Tenant shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten five (105) Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days Business Days after delivery of such Tenant Change to Landlord.

Appears in 3 contracts

Samples: Lease (Precision Biosciences Inc), Lease (Precision Biosciences Inc), Lease (Precision Biosciences Inc)

Construction Documents. Tenant On or before the date set forth in Attachment 4, Landlord shall use commercially reasonable efforts to cause Landlord’s design/build contractor to cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days of receipt thereof, and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten (10) five Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and the Tenant, with the understanding the Construction Documents shall be approved no later than the date set forth for such approval on Attachment 4. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to Tenant’s approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request order to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlord. The Over-Allowance Amount shall be adjusted for any Tenant Change as further contemplated by Section 5.4, below.

Appears in 2 contracts

Samples: Lease (Jounce Therapeutics, Inc.), Lease (Jounce Therapeutics, Inc.)

Construction Documents. Tenant shall cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days business days of receipt thereof, and the Tenant shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten (10) Business Days business days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws applicable laws existing on the date of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Tenant Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlord.

Appears in 2 contracts

Samples: Lease Agreement (Liquidia Technologies Inc), Lease Agreement (Liquidia Technologies Inc)

Construction Documents. Tenant shall cause On or before the date set forth in Attachment 2, provided that the Final Space Plan is approved by the date set forth in Attachment 2, the Architect to complete final Construction Documents will prepare draft construction documents consistent with the Final Space Plan Plan, which draft construction documents and a preliminary budget for the cost of performing the work shown on the draft construction documents shall submit the same be submitted to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any comments or requested changes to the draft construction documents within five (5) Business Days of receipt thereof, and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified draft construction documents within ten five (105) Business Days of its receipt of any requested changes from Tenant or Landlord. In no event may Tenant require any changes to the draft construction documents that are inconsistent with the Final Space Plan, except to the extent such changes are a part of any value engineering performed by Tenant in accordance with Section 3.4 hereof. Such process of submittal and response within the time frame frames specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such draft construction documents, and the Construction Documents draft construction documents shall be considered final once approved by the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent , with the Final Space Plan. The Construction Documents understanding that the draft construction documents shall comply with Applicable Laws existing on be approved no later than the date set forth for such approval on Attachment 2. Once Landlord and Tenant approve the draft construction documents, the draft construction documents shall be considered to be final construction documents (the “Approved Construction Documents”). Time is of the essence of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to LandlordSection 2.3.

Appears in 1 contract

Samples: First Amendment to Lease (Vor Biopharma Inc.)

Construction Documents. Tenant On or before the date set forth in Attachment 2, Landlord shall use commercially reasonable efforts to cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days of receipt thereof, and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten five (105) Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and the Tenant, with the understanding the Construction Documents shall be approved by both parties no later than the date set forth for such approval on Attachment 2. In no event may EXHIBIT D either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to Tenant’s approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request order to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days Business Days after delivery of such Tenant Change to Landlord. The Over-Allowance Amount shall be adjusted for any Tenant Change as further contemplated by Section 5.4, below.

Appears in 1 contract

Samples: Heat Biologics, Inc.

Construction Documents. Tenant shall cause On or before the date set forth in Attachment 2, provided that the Final Space Plan is approved by the date set forth in Attachment 2, the Architect to complete final Construction Documents will prepare draft construction documents consistent with the Final Space Plan which draft construction documents and a preliminary budget for the cost of performing the work shown on the draft construction documents shall submit the same be submitted to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any comments or requested changes to the draft construction documents within five (5) Business Days of receipt thereof, and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified draft construction documents within ten five (105) Business Days of its receipt of any requested changes from Tenant or Landlord. In no event may Tenant require any changes to the draft construction documents that are inconsistent with the Final Space Plan, except to the extent such changes are a part of any value engineering performed by Tenant in accordance with Section 3.4 hereof. Such process of submittal and response within the time frame frames specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such draft construction documents, and the Construction Documents draft construction documents shall be considered final once approved by the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent , with the Final Space Plan. The Construction Documents understanding that the draft construction documents shall comply with Applicable Laws existing on be approved no later than the date set forth for such approval on Attachment 2. Once Landlord and Tenant approve the draft construction documents, the draft construction documents shall be considered to be final construction documents (the “Approved Construction Documents”). Time is of the essence of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to LandlordSection 2.3.

Appears in 1 contract

Samples: Lease Agreement (Vor Biopharma Inc.)

Construction Documents. Tenant On or before the date set forth in Attachment 2, Landlord shall use commercially reasonable efforts to cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days of receipt thereof, and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten five (105) Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and the Tenant, with the understanding the Construction Documents shall be approved by both parties no later than the date set forth for such approval on Attachment 2. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be EXHIBIT D enacted prior to Tenant’s approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request order to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days Business Days after delivery of such Tenant Change to Landlord. The Over-Allowance Amount shall be adjusted for any Tenant Change as further contemplated by Section 5.4, below.

Appears in 1 contract

Samples: Keystone Technology Park Lease (Heat Biologics, Inc.)

Construction Documents. Tenant shall promptly cause the Architect Space Planner and the Engineers to complete final the architectural and engineering drawings for the Premises, and the Space Planner shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing Construction Documents consistent with in a form which is complete to allow subcontractors to bid on the work and to obtain all applicable permits (collectively, the “Final Space Plan Construction Documents”) and shall submit the same to Landlord and Tenant for their Landlord’s approval. Landlord and Tenant shall review and provide any changes to the construction documents supply Landlord with two (2) copies signed by Tenant of such Final Construction Documents. Landlord shall, within five (5) Business Days of receipt thereof, and the Tenant shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten (10) Business Days of its business days after Landlord’s receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in Final Construction Documents, either (i) approve the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documentsFinal Construction Documents, and (ii) approve the Final Construction Documents shall subject to specified conditions to be considered final once approved satisfied by Tenant prior to submitting the Landlord Approved Construction Documents for permits as set forth below, if the Final Construction Documents are inconsistent with the Final Space Plan, or (iii) disapprove and return the Tenant. In no event may either Final Construction Documents to Tenant or Landlord require any changes that with requested revisions if the Final Construction Documents are inconsistent with the Final Space Plan. The If Landlord disapproves the Final Construction Documents, Tenant may resubmit the Final Construction Documents to Landlord at any time, and Landlord shall approve or disapprove of the resubmitted Final Construction Documents, based upon the criteria set forth in this Section 2.2.3 within three (3) business days after Landlord receives such resubmitted Final Construction Documents. Once approved by Landlord as set forth above, the Final Construction Documents shall comply with Applicable Laws existing on be referred to as the date of this Tenant Work Letter “Approved Working Documents,” and which may such Final Construction Documents shall be enacted so approved by Landlord prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of completed the Final Construction Documents. Subject Documents Tenant shall cause the Space Planner to submit the Approved Construction Documents to the provisions of Sections 3.1 appropriate municipal authorities for all architectural and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord structural permits (the Tenant ChangePermits”), request provided that (a) the Space Planner shall provide Landlord with a change copy of the package that it intends to submit prior to such submission, and (b) if there are Building modifications required to obtain the Permits, then Tenant shall obtain Landlord’s prior written consent to any such Building modifications. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any certificate of occupancy (or other documentation or approval allowing Tenant to legally occupy the Premises) for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in performing ministerial acts reasonably necessary to enable Tenant to obtain any such certificate of occupancy (or other documentation or approval allowing Tenant to legally occupy the Premises). No changes, modifications or alterations in the Tenant Improvements shown on Approved Construction Documents may be made without the Construction Documentsprior written consent of Landlord, which Landlord approval shall consent may not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlorddelayed.

Appears in 1 contract

Samples: Lease Agreement (Rockley Photonics Holdings LTD)

AutoNDA by SimpleDocs

Construction Documents. Tenant shall cause Tenant’s design/build contractor to cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days of receipt thereof, and the Tenant shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten (10) five Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlord.

Appears in 1 contract

Samples: Lease (Braeburn Pharmaceuticals, Inc.)

Construction Documents. Tenant On or before the date set forth in Attachment 4, Landlord shall use commercially reasonable efforts to cause Landlord’s design/build contractor to cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days business days of receipt thereof, and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten five (105) Business Days business days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and Tenant, with the Tenantunderstanding the Construction Documents shall be approved no later than the date set forth for such approval on Attachment 4. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to Tenant’s approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request order to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlord. The Over-Allowance Amount shall be adjusted for any Tenant Change as further contemplated by Section 5.4, below.

Appears in 1 contract

Samples: Lease (Organovo Holdings, Inc.)

Construction Documents. Tenant On or before the date set forth in Attachment 5, Landlord shall use commercially reasonable efforts to cause Landlord’s design/build contractor to cause the Architect to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to the construction documents within five (5) Business Days of receipt thereof, and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten five (105) Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents shall be considered final once approved by the Landlord and Tenant, with the Tenantunderstanding that Landlord and Tenant shall use commercially reasonable efforts to cause the Construction Documents to be approved no later than the date set forth for such approval on Attachment 5. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to Tenant’s approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request order to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlord. The Over-Allowance Amount shall be adjusted for any Tenant Change as further contemplated by Section 5.4 below.

Appears in 1 contract

Samples: Aethlon Medical Inc

Construction Documents. Tenant Landlord, with Tenant’s cooperation, shall cause the Architect architect chosen by the parties (the “Architect”) to complete final Construction Documents consistent with the Final Space Plan and shall submit the same to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any changes to prepare the construction documents within five drawings for the Leasehold Improvements (5) Business Days of receipt thereofthe “Construction Documents”), and the Landlord shall furnish to Tenant shall use reasonable efforts to cause the Architect to prepare and circulate modified documents within ten (10) Business Days of its receipt of any requested changes from Tenant or Landlord. Such process of submittal and response within the time frame specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such documents, and the Construction Documents for its review and approval. Tenant shall be considered final once approved by notify Landlord whether or not it approves of the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent with the Final Space Plan. The submitted Construction Documents shall comply with Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documentswithin 5 days after Landlord’s submission thereof. Subject If Tenant’s notice objects to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the proposed Construction Documents, the notice will set forth how the proposed Construction Documents fails to meet Tenant’s requirements and how the proposed Construction Documents must be changed in order to overcome Tenant’s objections, in which case Landlord approval shall, within 10 days after such notice, revise such Construction Documents in accordance with Tenant’s notice and submit the revised Construction Documents to Tenant for its review and approval. Tenant shall notify Landlord in writing whether or not be unreasonably withheld or conditioned, and it approves of the resubmitted Construction Documents within 3 days after its receipt thereof. This process shall be granted repeated until the Construction Documents have been finally approved by Tenant. Tenant’s failure to notify Landlord whether or denied not it approves of the initial Construction Documents within five 5 days (5or, in the case of resubmitted Construction Documents, within 3 days) business days after delivery of such the submission thereof, shall be deemed a Tenant Change to LandlordDelay (as defined in Paragraph 10 below).

Appears in 1 contract

Samples: Lease Agreement (Solid Power, Inc.)

Construction Documents. Tenant On or before the date set forth in Attachment 2, Landlord shall use commercially reasonable efforts to cause the Contractor to cause the Architect to complete final Construction Documents prepare draft construction documents consistent with the Final Space Plan and which shall submit the same be submitted to Landlord and Tenant for their approval. Landlord and Tenant shall review and provide any comments or requested changes to the draft construction documents within five (5) Business Days of receipt thereofthereof(and if Tenant shall fail to object thereto within such five (5) Business Day period, then the draft construction documents shall be deemed approved by Tenant), and the Tenant Landlord shall use reasonable efforts to cause the Architect to prepare and circulate modified draft construction documents within ten five (105) Business Days of its receipt of any requested changes from Tenant or Landlord. In no event may either Tenant or Landlord require any changes to the draft construction documents that are inconsistent with the Final Space Plan. Such process of submittal and response within the time frame frames specified in the preceding sentence shall continue until each of Landlord and Tenant gives written approval to such draft construction documents, and the Construction Documents draft construction documents shall be considered final once approved by the Landlord and the Tenant. In no event may either Tenant or Landlord require any changes that are inconsistent , with the Final Space Planunderstanding that the Construction Documents shall be approved no later than the date set forth for such approval on Attachment 2. Once Landlord and Tenant approve the draft construction documents, the draft construction documents shall be considered final construction documents (the "Construction Documents"). The Construction Documents shall comply with all Applicable Laws existing on the date of this Tenant Work Letter and which may be enacted prior to approval of completed Construction Documents. Subject to the provisions of Sections 3.1 and 5.4 of this Work Letter, Tenant may, from time to time, by written request to Landlord on a form reasonably specified by Landlord (“Tenant Change”), request a change in the Tenant Improvements shown on the Construction Documents, which Landlord approval shall not be unreasonably withheld or conditioned, and shall be granted or denied within five (5) business days after delivery of such Tenant Change to Landlord.

Appears in 1 contract

Samples: Lease Agreement (Trillium Therapeutics Inc.)