Construction Contracting Sample Clauses

Construction Contracting a) It is agreed that Plant Tradesmen who are assigned by the Company to carry out work directly related to ‘new’ construction with tradesmen employed by an outside contractor, plant tradesmen will be paid the ‘outside’ contractor(s) rate(s).
AutoNDA by SimpleDocs
Construction Contracting. This task includes work involved with the bidding process: advertisement for bids, pre-bid meeting with contractors, evaluation of received bids, approval and award of contract, and issuance of Notice to Proceed. Deliverables:  Bid Summary  Award of Contract  Notice to Proceed
Construction Contracting. This task includes all activities necessary to secure a contractor and award the contract including for all four bid packages: develop bid documents; prepare bid advertisement and contract documents for construction contract bidding; conduct pre-bid meeting, bid opening, and bid evaluation; select the contractor; award the contract; and issue Notice to Proceed. Deliverables:
Construction Contracting. This task includes preparation of a request for proposals (RFP), evaluation of received proposals, negotiations with qualified bidders, approval and award of contract, and a kickoff meeting. Deliverables:  RFP  Award of Contract
Construction Contracting. This task includes work involved with acquiring contractor(s) for this Project.
Construction Contracting. This task includes work involved with the bidding process: preparation of bid packages, advertisement for bids, pre-bid meeting with contractors, evaluation of received bids, approval and award of contract, and issuance of Notice to Proceed. Deliverables:  Bid Summary  Award of Contract  Notice to Proceed Task D.2 Construction Mobilization and Site Preparation Mobilization and site preparation includes: • mobilizing equipment • installing temporary construction trailers • discharging the water from the basin • removing approximately 3,000 CY of accumulated sediment within the basin, of which an anticipated 250 CY and 2,750 CY will be disposed at Class I and Class III landfills, respectively • removing existing vegetation • removing about 6,700 CY of contaminated soils along the perimeter of Oxford basin, of which an anticipated 3,700 CY and 3,000 CY will be disposed at Class I and Class III landfills, respectively • replacing the contaminated soils with clean imported fill • demolishing paving and fencing Project Construction Project construction will include: • Constructing retaining walls along Washington Boulevard and the southern boundary of Oxford Basin. • Constructing a 6-to-8-foot-wide decomposed granite walking trail around the perimeter of the basin. • Installing wildlife-friendly lighting for the walking trail around the perimeter of Oxford Basin. • Installing a boat ramp to allow access to Oxford Basin for routine maintenance, trash removal, and water quality monitoring. • Replacing the existing tide gates with programmable tide gates to allow water exchange and to improve the water quality of the basin. The existing control system will be commissioned to properly operate with the new tide gates. • Constructing a berm between the two tide gates to increase circulation and dissolved oxygen levels of the water to improve the water quality. • Constructing an access ramp and walkway from Admiralty Way adjacent to the tide gate control house for maintenance and operation purposes. • Planting native plants. • Installing an irrigation system to establish the new native plants. • Constructing six observation deck areas and a gateway area overlooking Oxford Basin. • Installing approximately 3,550 linear feet of 4-foot-high ornamental steel fence around the perimeter of the basin to improve the aesthetics. • Grading work inside and outside of the basin • Installing interpretive signage at the observation decks and along the walking trail to educate use...
Construction Contracting. This task includes work involved with the bidding process: preparation of bid packages, advertisement for bids, pre-bid meeting with contractors, evaluation of received bids, approval and award of contract, and issuance of Notice to Proceed. Deliverables:  Bid Summary  Award of Contract  Notice to Proceed Task D.2 Construction Mobilization and Site Preparation Equipment will be mobilized and temporary construction trailers will be installed on site. Project Construction Project construction will include: • replacing the existing radial gate in the Pacoima Diversion Channel with an inflatable rubber dam • installing a control system for the rubber dam in an existing building adjacent to the spreading grounds intake • replacing the intake canal with four underground reinforced concrete pipes • filling and re-grading the intake canal as a flat, open area • removing sediment and clay lenses to enhance percolation • combining and deepening the spreading basins to increase storage volume to 1,197 acre feet • installing new inter-basin structures, pipes, and control gates • installing new telemetry and flow measurement instrumentation • installing a trash rack on the intake to the spreading grounds • upgrading the electric motor operators and slide gates at the intake Performance Testing and Demobilization The instrumentation, control gates, rubber dam, and rubber dam control system will be performance tested. Contractor will demobilize after performance testing and the final inspection and punch list items are completed. Deliverables:  Photo Documentation of Construction
AutoNDA by SimpleDocs
Construction Contracting. This task includes work involved with the bidding process: preparation of bid packages, advertisement for bids, pre-bid meeting with contractors, evaluation of received bids, approval and award of contract, and issuance of Notice to Proceed. Deliverables:  Notice of Advertisement for Bids  Bid Summary  Award of Contract  Notice to Proceed Task D.2 Construction Mobilization and Site Preparation Equipment will be mobilized and temporary construction trailers will be installed on site. Project Construction Project construction will include: • constructing a pump station and installing two pumps • installing an approximate 7,000 foot 42” ductile iron pipeline to convey flows from the pump station at Xxxx Road Spreading Basin to the San Gabriel River • installing a control system for the pumps at the crest of the spreading basin • constructing an outlet structure at the river • dewatering the basin • excavating about approximately 110,000 cubic yards of material from the basin to improve percolation • processing and hauling away excavated material to a disposal site • installing new flow measuring instrumentation Performance Testing and Demobilization The pumps, control system, instrumentation, and monitoring equipment will be performance tested. Contractor will demobilize after performance testing and the final inspection and punch list items are completed. Deliverables:  Photo Documentation of Construction
Construction Contracting. This task includes work involved with the bidding process: advertisement for bids, pre-bid meeting with contractors, evaluation of received bids, approval and award of contract, and issuance of Notice to Proceed. This task and deliverables are contingent upon the City’s bid process. In the event the City constructs the project with in-house resources, deliverables listed below will not be required. Deliverables:  Bid Summary  Award of Contract  Notice to Proceed
Construction Contracting. This task includes work involved with the bidding process: preparation of bid packages, advertisement for bids, pre-bid meeting with contractors, evaluation of received bids, approval and award of contract, and issuance of Notice to Proceed. Deliverables:  Bid Package  Bid Summary  Award of Contract  Notice to Proceed Task D.2 Construction Mobilization and Site Preparation Equipment will be mobilized and temporary construction trailers will be installed on site. Project Construction Project construction will include: • installing two pumps, one pump station, and approximately 250 feet of pipeline to send water from Walnut Spreading Basin to Walnut Wash • installing a control system for the pumps at the crest of the spreading basin • dewatering the basin • excavating about 10,000 cubic yards of sediment from the entire basin • processing and hauling away excavated sediment to a disposal site • installing a new flow measurement instrumentation Performance Testing and Demobilization The pumps, control system, and flow measurement instrumentation will be performance tested. Contractor will demobilize after performance testing and the final inspection and punch list items are completed. Deliverables:  Photo Documentation of Construction  Performance Test Results