Concrete Paving Sample Clauses

Concrete Paving. 1) Cast-in-place concrete curb and gutter (B612) will be provided at the perimeter of all paved parking and drive areas.
AutoNDA by SimpleDocs
Concrete Paving. Similar to excavation, our concrete paving operations will require on-road legal haul trucks to place the concrete. They will have similar traffic patterns to the excavation operations, and will also include MOT and flaggers at each location to protect the traveling public and assist in the efficient delivery of material. For the access/exit points, we will use the future J-Turn and T intersections as our primary points of access and exit for the trucks. At each of these locations, the grade will already be constructed to support the future intersection concrete, and these areas provide a level surface for truck access in and out of the jobsite. For each concrete pour, the trucks will be provided with a haul plan that ensures every driver knows how to safely deliver the concrete. Each truck will follow a cyclical haul pattern so all drivers follow the same path to prevent traffic incidents or delays to travelers.
Concrete Paving. 4 inch thickness (includes sub-base): [Per Square Foot]. This pay item includes all costs associated with the installation of replacement concrete. The concrete will meet the strength/reinforcement requirements specified in the Remedial Action Plan. Includes costs for compression testing.
Concrete Paving additional 1 inch thickness: [Per Square Foot]. This pay item includes all costs associated with the installation of additional replacement concrete of 1 inch thickness.
Concrete Paving. Furnish and erect a full-size 3’x3’ panel of the concrete paving per section 32 13 13.
Concrete Paving. 1. Aggregate Subbase: refer to drawings .
Concrete Paving a. Subgrade and sub base preparation and maintenance for concrete paving installations
AutoNDA by SimpleDocs
Concrete Paving a. Sample the fresh concrete for concrete pavements and perform required tests, including slump, air content, concrete temperature, and cast test specimens during placements.
Concrete Paving. Type of work includes replace existing or install new concrete or asphalt paving and sidewalks.

Related to Concrete Paving

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Plumbing fixtures and appliances shall be used only for the purposes for which designed, and no sweepings, rubbish, rags or other unsuitable material shall be thrown or deposited therein. Damage resulting to any such fixtures or appliances from misuse by a tenant or its agents, employees or invitees, shall be paid by such tenant.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

Time is Money Join Law Insider Premium to draft better contracts faster.