Concrete Base Sample Clauses

Concrete Base. As shown on the Drawings. Concrete shall be furnished by a well-known, reputable ready- mix concrete company. Mixing, transporting and placing of concrete shall conform to ASTM C94. Curing shall be performed in accordance with standard practice to prevent excessive shrinkage or cracking.
AutoNDA by SimpleDocs
Concrete Base. All aspects of constructing Portland cement concrete roadbase on a compacted and prepared sub base shall conform to the requirements of the F.D.O.T. "Standard Specifications", latest edition except as authorized by the County's Representative.
Concrete Base. The concrete base, reinforcing cage and fixings shall be designed and constructed to the requirements of SANS 1200 A, SANS 1200 AA, SANS 1200 G, SANS 1200 GA, SANS 10144, SANS 10145, SANS 17660- 1, SANS 17660-2 and SANS 920. The base design shall include at least two 110mm diameter PVC ducting to allow the supply cable and the two 35mm² copper earthing conductors access from below ground level to the inside of the mast without being visible above. The positioning of the ducting must be clearly marked on the foundation of the mast. The Contractor shall test the soil bearing pressure for each mast prior to casting the concrete base to ensure that the soil load bearing conditions are suited to the specific concrete base design. The cost of these tests shall be included in the pricing schedule. The results of these tests must be discussed with the Engineer prior to casting of the concrete base and hand the results over to the Engineer prior on completion of the project. All reinforcing and foundation bolts shall have a minimum of 100mm concrete cover. The 28 days cube strength of the concrete shall be stated by the Contractor All foundations shall have a circular flat base from which a square plinth shall rise to above the surrounding ground level. After casting of the foundation, the slab shall be covered by earth, properly compacted. The area around the plinth shall be brought to the original level and shall be left neat and tidy.

Related to Concrete Base

  • Technical Objections to Grievances It is the intent of both Parties of this Agreement that no grievance shall be defeated merely because of a technical error, other than time limitations in processing the grievance through the grievance procedure. To this end, an arbitration board shall have the power to allow all necessary amendments to the grievance and the power to waive formal procedural irregularities in the processing of a grievance, in order to determine the real matter in dispute and to render a decision according to equitable principles and the justice of the case.

  • Code of Basic Working Conditions and Human Rights Xxxxx is committed to providing a safe and secure working environment and the protection and advancement of basic human rights in its worldwide operations. In furtherance of this commitment, Xxxxx has adopted a Code of Basic Working Conditions and Human Rights setting out in detail the measures it takes to ensure this commitment is fulfilled. This code may be downloaded at xxxxx://xxx.xxxxxx.xxx/principles/xxxxx-xxxxxx.xxxx. Xxxxx strongly encourages Seller to adopt and enforce concepts similar to those embodied in the Boeing Code, including conducting Seller’s operations in a manner that is fully compliant with all applicable laws and regulations pertaining to fair wages and treatment, freedom of association, personal privacy, collective bargaining, workplace safety and environmental protection. Seller shall include the substance of this clause, including this flowdown requirement, in all subcontracts awarded by Seller for work under this Contract.

  • Technical Objections No grievance shall be defeated merely because of a technical error, other than time limitations in the processing of the grievance through the grievance procedure. To this end, an arbitrator shall have the power to waive formal procedural irregularities in the processing of the grievance in order to determine the real matter in dispute.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • Technical Objections to Grievance No grievance will be defeated or denied by any minor technical objection.

  • Important Information About Procedures for Opening a New Account To help the government fight the funding of terrorism and money laundering activities, Federal law requires all financial organizations to obtain, verify, and record information that identifies each person who opens an account. What this means for you: When you open an account, you are required to provide your name, residential address, date of birth, and identification number. We may require other information that will allow us to identify you.

  • Certification of Meeting or Exceeding Tobacco-Free Workplace Policy Minimum Standards A. Grantee certifies that it has adopted and enforces a Tobacco-Free Workplace Policy that meets or exceeds all of the following minimum standards of:

  • Training Objectives It is important that the objectives for the employee(s) enrolling in this course or program is related to the strategic objectives of the organization for which the employee works. Provide text to explain how the training event meets agency objective(s) and purpose type.

  • GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • Program Objective The objectives of the Department’s grants are to:

Time is Money Join Law Insider Premium to draft better contracts faster.