Concrete and Cement Sample Clauses

Concrete and Cement. 2.2.1 Aggregate Gradation Analysis (ASTM C136, TEX-200-F) ................................. $ 75.00/ea
AutoNDA by SimpleDocs
Concrete and Cement. 1. Pre-cast concrete shall be fully cured before placing it in a location that may contact surface waters.

Related to Concrete and Cement

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • FABRICATION Making up data or results and recording or reporting them.

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

  • Caisson Rock Caisson Rock is defined as material that must be removed from a shaft which cannot be penetrated faster than two feet per hour (fifteen minute minimum) using a rock auger with bullet-shaped hardened steel teeth (Kennametal bits or equivalent), and the drilling equipment should have the capacity to produce a continuous torque of at least 1,000,000 inch pounds and a downward force of at least 50,000 pounds (a Xxxxxx LLDH in good working condition) for piers up to seventy two inches in diameter. Use of equipment with greater torque or downward force modifies the definition of refusal to be the point at which the equipment cannot penetrate faster than two feet per hour (fifteen minute minimum). In rare cases, refusal may occur on a rock seam or boulder above the general massive rock surface. The compensation for Caisson Rock should include only material that cannot be penetrated by the rock auger at the specified rate.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.