Compressive Strength Sample Clauses

Compressive Strength. The average compressive strength of 43 grade OPC cement tested as per IS:403 Part-6 1988 shall be as follows:
AutoNDA by SimpleDocs
Compressive Strength. The minimum compressive strength of the CLSM material shall be 30 pounds per square inch (psi) and the maximum compressive strength of the CLSM shall be 150 pounds per squre inch (psi) when tested in accordance with ASTM D4832 after 52 days.
Compressive Strength. The Class PCC04081 (S) concrete must have a minimum 4,000 psi compressive strength at twenty-eight (28) days.
Compressive Strength. 2. Initial Setting time.
Compressive Strength. Minimum compressive strength of any one brick shall not be less than 100 kg /Sq. cm.
Compressive Strength. The Class "S" concrete must have a minimum 4,400 psi compressive strength at twenty-eight (28) days.
Compressive Strength. Shall have a minimum 4,400 psi compressive strength at twenty- eight (28) days.
AutoNDA by SimpleDocs

Related to Compressive Strength

  • Industry Troubleshooter Where a difference arises between the parties relating to the dismissal, discipline, or suspension of an employee, or to the interpretation, application, operation, or alleged violation of this Agreement, including any question as to whether a matter is arbitrable, during the term of the Collective Agreement, Xxxxx XxXxxxxxxx, Xxxx Xxxxxx, Xxxxx Xxxxxxxx, or a substitute agreed to by the parties, shall at the request of either party:

  • Firefighters Any truck with an inoperative aerial ladder shall be regularly and routinely staffed with one (1) officer and five (5) firefighters for the period of time that the aerial ladder is inoperative, or until such time as the truck with the inoperative aerial ladder is replaced with a truck with an operative aerial ladder. At 0800 and 2000 hours, all trucks shall be staffed with one (1) officer and four (4) firefighters, and any truck with an inoperative aerial ladder shall be staffed with one (1) officer and five (5) firefighters.

  • Stabling Without prejudice to Network Rail’s obligations, if any, under Schedule 5 to provide Stabling, Network Rail shall use all reasonable endeavours to provide such Stabling facilities as are necessary or expedient for or in connection with the provision of the Services in accordance with the Working Timetable.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Modern Slavery You hereby affirm your compliance with the Modern Slavery Xxx 0000 and associated guidance. You confirm (a) that you have read, are familiar with and shall not perform an act or omission which is in contravention with, the letter or spirit of the Act; and (b) you carry out regular, meaningful and comprehensive due diligence procedures and have internal policies in place to address any suspected human rights abuse in your business and Group where applicable.

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Transporting Students Teachers shall not be required to transport a student in a private vehicle on behalf of the school.

Time is Money Join Law Insider Premium to draft better contracts faster.