Coating thickness Sample Clauses

Coating thickness. The thickness of the coating shall meet the requirements of the design when tested in accordance with ISO 2808;
AutoNDA by SimpleDocs
Coating thickness. Thickness of coatings and paint shall be measured checked according to the procedures outlined in SSPC-PA 2 “Measurement of Dry Film Thickness with Magnetic Gages.” Use of an instrument such as a Xxxxx Gauge, precision groove grinder, etc. is permitted if a destructive test is deemed necessary by the Engineer and the total DFT is less than 50 mils.

Related to Coating thickness

  • Smoke Detectors At Owner's expense, smoke detectors will be installed on the Property in working condition in accordance with the law prior to the tenant's occupancy. During the occupancy, it shall be the tenant's responsibility to maintain all smoke detectors. Owner will replace smoke detector equipment as needed.

  • Volunteer Firefighting Leave Leave without pay will be granted when an employee who is a volunteer firefighter is called to duty to respond to a fire, natural disaster or medical emergency.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Glass Or Safety Glazing Material a. We cover:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Insulation In exterior walls? Yes No Unknown In ceiling/attic? Yes No Unknown In any other areas? Yes No Where? Comments:

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.

  • MASONRY 4.1 Storm Shelter Area/Tornado Protection: In new building construction, provide lateral and vertical bracing in the walls around the employee toilet rooms. DIVISION 5 – METALS

Time is Money Join Law Insider Premium to draft better contracts faster.